250-RICR-120-05-24
250-RICR-120-05-24. Removal of Lead Based Paint from Exterior Surfaces (version Amendment, 07/19/2007 to 07/19/2007)
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
OFFICE OF AIR RESOURCES
AIR POLLUTION CONTROL REGULATION NO. 24
REMOVAL OF LEAD BASED PAINT
FROM EXTERIOR SURFACES
Effective 27 April 1993
Last Amended 19 July 2007
AUTHORITY: These regulations are authorized pursuant to R.I. Gen. Laws § 42-
17.1-2(s) and 23-23, as amended, and have been promulgated pursuant to the
procedures set forth in the R.I. Administrative Procedures Act, R.I. Gen. Laws Chapter
42-35.
RHODE ISLAND DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
OFFICE OF AIR RESOURCES
AIR POLLUTION CONTROL REGULATION NO. 24
REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES
TABLE OF CONTENTS
24.1
Definitions....................................................................................................................................................1
24.2
Applicability and Exemptions .......................................................................................................................2
24.3
Notification requirements..............................................................................................................................2
24.4
Requirements for Preparation of Work Area:.................................................................................................3
24.5
Requirements for Removal of Lead Paint Using Heat Based Methods ...........................................................4
24.6
Requirements for Removal of Lead Paint Using Chemical Based Methods....................................................5
24.7
Requirements for Removal of Lead Paint Using Mechanical Methods...........................................................5
24.8
Requirements for Removal of Lead Paint Using Abrasive Blasting................................................................5
24.9
Alternative Procedures for Removal of Paint Containing Lead.......................................................................5
24.10
Requirements for Site Cleanup......................................................................................................................6
24.11
General Provisions........................................................................................................................................7
Page 1 of 8
RHODE ISLAND DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
OFFICE OF AIR RESOURCES
AIR POLLUTION CONTROL REGULATION NO. 24
REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES
24.1
Definitions
Unless otherwise expressly defined in this section, the terms used in this regulation shall be
defined by reference to the Rhode Island Air Pollution Control General Definitions
Regulation. As used in this regulation, the following terms shall, where the context permits,
be construed as follows:
24.1.1
"Abrasive blasting" means the procedure of removing paint from a surface
by forcefully applying an abrasive material to the paint containing surface.
24.1.2
"HEPA" or "high efficiency particulate air" means a filter capable of
filtering out particles of 0.3 microns or greater from a body of air at 99.97
percent efficiency or greater.
24.1.3
"Hydroblasting" means any abrasive blasting using high pressure liquid as
the propelling force.
24.1.4
"Impenetrable material" means a material that will not allow any spent
abrasives, paint, dust and/or other debris, including all residues generated by
wet paint removal operations, to penetrate through it.
24.1.5
"Lead-based substance" means any paint or other surface coating material
containing more than 0.05 percent lead by weight calculated as lead metal in
the dried solid.
25.1.6
"Lead based paint" means any surface coating material that contains more
than 0.05 percent lead by weight calculated as lead metal in the dried solid.
24.1.7
"Mechanical paint removal" means the use of any force, including but not
limited to manual, mechanical, electrical or other power, applied to a device
to remove paint from a surface.
Page 2 of 8
24.1.8
"Paint" means any surface coating material.
24.1.9
"Paint stripper" means any chemical and/or caustic substance applied to a
surface for the purpose of removing paint.
24.1.10
"Representative sample" means a sample of any paint, including a sample
of each layer of paint which is on a structure, that may and/or will be
removed from a structure.
24.1..11
"Sandblasting" means abrasive blasting.
24.1.12
"Vacuum blasting" means any abrasive blasting in which the spent
abrasive, paint, dust and/or other debris are immediately collected by a
vacuum device.
24.1.13
"Wet abrasive blasting" means any abrasive blasting using compressed air
as the propelling force in combination with water to contain the spent
abrasive, paint, particulate, dust and/or other debris generated by the
operations.
24.2
Applicability and Exemptions
24.2.1 Applicability
The provisions of this regulation shall apply to all persons engaging in the
removal of a lead based substance from exterior surfaces of buildings and/or
other structures, unless exempted below.
24.2.2 Exemptions
Removal of paint, that is not a lead based substance, from a surface shall be
exempted from this regulation. To qualify for this exemption, a
representative sample of any paint, which is to be removed from any surface,
must be tested prior to the initiation of paint removal and must contain no
more than 0.05% lead by weight calculated as lead metal in the dried solid.
The person performing the paint removal operation is responsible for
determining if lead paint is present on the structure. Paint removal operations
which are exempt from the requirements of this regulation must comply with
the requirements of Air Pollution Control Regulation No. 5 "Fugitive Dust".
24.3
Notification requirements
24.3.1 The following persons shall be notified in writing, by the person conducting the
removal operation, at least five days prior to the beginning of any lead paint
Page 3 of 8
removal from the exterior surface of any structure:
(a)
adults residing in the structure from which the lead paint is being
removed and/or residing within 50 feet of the structure from which
lead paint is being removed, and
(b)
the owner, agent, and/or property manager of the structure from
which the lead paint is being removed and/or of any building located
within 50 feet of the structure from which lead paint is being
removed, and
(c)
the owner, agent or manager of any business or organization located
in the structure from which the lead paint is being removed and/or
within 50 feet of the structure from which lead paint is being
removed, and
(d)
the principal of every school and the chief administrative officer of
every school within 50 feet of the structure from which lead paint is
being removed.
24.3.2 The notification shall include, at a minimum, the following information:
(a)
the location of the structure from which the lead paint is to be
removed,
(b)
the expected start and completion dates for the lead paint removal
project,
(c)
the lead paint removal procedure to be used, and
(d)
the name, address and telephone number of the individual or
company responsible for the lead paint removal.
24.3.3
In addition, the notification shall include the following statement: "The paint
which will be removed from this structure contains lead. Exposure to lead is
unhealthful, particularly to young children. Contact the Department of
Environmental Management, Office of Air Resources, at 222-2808 for more
information."
24.3.4 Any and all parties identified in section 24.3.1 must be notified in writing of any
changes in the information included in the original notice.
24.4
Requirements for Preparation of Work Area:
24.4.1 The following procedures must be followed prior to the initiation of lead paint
Page 4 of 8
removal from any exterior surfaces of buildings:
(a)
Remove or cover with an impenetrable material all toys, play
equipment and furnishings within a minimum of 50 feet, and/or any
other distance which spent abrasive, paint, particulate, dust and/or
other debris generated by the removal operations may travel, from a
surface from which lead based paint is being removed.
(b)
Place an impenetrable material on the ground, at the paint removal
worksite, to keep any and all spent abrasive, paint, particulate, dust
and/or other debris generated by the paint removal operation from
being deposited on the ground. If a wet removal system is to be used,
procedures must be employed to contain any and all residues
generated by the wet abrasive blasting operations.
(c)
The ground sheeting must be attached to ground by staking, weighing
down or any other method to insure that it remains in place during the
paint removal operation.
(d)
If abrasive blasting, machine sanding or machine scraping is to be
employed, close all doors and windows on the walls to be blasted or
sanded and securely seal them from the outside. Air conditioning
units on these and adjacent walls must be turned off and covered.
(e)
Erect vertical containment shrouds if there is visible movement of
abrasive material, paint, dust and/or other debris beyond ground
sheeting.
(f)
If a wet removal procedure is to be used, a system must be in place
prior to initiation of the removal which allows liquid waste to be
collected from the ground containment and placed into appropriate
containers for proper disposal.
24.4.2
Site preparation for exterior paint removal from structures other than
buildings must be adequate to prevent spent abrasive material, paint,
particulate, dust and/or other debris from being deposited on the ground or in
water or travelling offsite. Prior to removing paint from structures other than
buildings, the person performing the paint removal work and/or the
contractor responsible for the removal operation must submit a plan, that
describes the procedure to be employed, to the Office of Air Resources for
approval. The paint removal operation must not be initiated until written
approval is issued by the Department.
24.5
Requirements for Removal of Lead Paint Using Heat Based Methods
Page 5 of 8
24.5.1 Open flame burning shall not be used to remove paint from exterior surfaces.
24.5.2 Heat guns and/or any other device used for removal of paint from exterior surfaces
must be operated such that the temperature of the gun and/or other device
does not exceed 1000oF.
24.6
Requirements for Removal of Lead Paint Using Chemical Based Methods
24.6.1
Flammable paint strippers and paint strippers containing methylene chloride
shall not be used to remove paint from exterior surfaces.
24.6.2
Non-flammable paint strippers which do not contain methylene chloride may
be used for the removal of exterior paint provided that the manufacturers
instructions for use of the paint stripper are followed.
24.7
Requirements for Removal of Lead Paint Using Mechanical Methods
24.7.1
Machine sanding and/or machine scraping shall be allowed only if the unit is
controlled by a HEPA vacuum unit which immediately collects any and all
spent abrasive, paint, particulate, dust and/or other debris generated by the
operations. The sanding and/or scraping disk must not be wider than the
direct surface upon which it is being applied.
24.7.2
Exterior surfaces must be misted with water prior to manual scraping. Dry
scraping is not allowed.
24.8
Requirements for Removal of Lead Paint Using Abrasive Blasting
24.8.1
Dry abrasive blasting shall be allowed only if any and all spent abrasive,
paint, particulate, dust and/or other debris generated by the blasting is
immediately collected by a HEPA vacuum unit. Any person using a vacuum
blast system must comply with the manufacturers' guidelines when using the
system.
24.8.2
Hydroblasting or wet abrasive blasting may be used for exterior lead paint
removal provided that a vertical containment system is employed that
prevents any and all fallout generated by the operation from travelling
beyond the ground containment. Additionally any and all liquid waste
generated by the operation must be adequately contained and handled in
accordance with applicable waste disposal regulations.
24.9
Alternative Procedures for Removal of Paint Containing Lead
24.9.1
The Department may, on a case by case basis, allow an alternative procedure
Page 6 of 8
for removing paint containing lead provided that the person who uses this
procedure shall submit to the Office of Air Resources, in writing, a
description of the procedure which demonstrates to the satisfaction of the
Department that the proposed alternative provides an equivalent control
efficiency to the methods which are contained in sections 24.5, 24.6, 24.7 and
24.8. Use of an alternative procedure shall not begin until a written approval
is issued by the Department.
24.10 Requirements for Site Cleanup
24.10.1
At the end of each workday, the following procedures must be followed:
(a)
If a dry removal procedure was used, spray any and all spent
abrasive, paint, particulate, dust and/or other debris present on ground
sheeting and/or other containments with a fine mist of water and
collect the residue and place it in an appropriate container.
(b)
Visually inspect all areas, including areas that extend beyond the
sheeted area, to determine whether any spent abrasive, paint,
particulate, dust and/or other debris has escaped containment. If any
spent abrasive, paint, particulate, dust and/or other debris generated
by the lead paint removal operation is observed it must be collected
and placed in single 6-mil or double 4-mil plastic bags or another
appropriate container.
(c)
If bags are used they must not be overloaded. Bags must be securely
sealed and stored in such a way that they are not easily accessible to
the public.
(d)
Liquid waste must be collected and stored in appropriate containers.
Containers must be securely sealed and stored in a manner such that
they are not easily accessible to the public.
(e)
Plastic sheets used for exterior containments, such as ground sheeting
and vertical shrouds, must be removed and stored in a manner such
that they are not easily accessible to the public.
24.10.2
At the completion of a lead paint removal project, or at the time when all lead
paint that is to be removed from a structure has been removed, the following
procedures must be implemented:
(a)
Spray the ground sheeting as specified in section 24.10.1(a). Any
and all residue must be collected and placed in an appropriate
container. Ground sheeting should then be folded from the ends to
the middle and placed into single 6-mil or double 4-mil plastic bags
Page 7 of 8
for disposal.
(b)
Collect any and all liquid waste in appropriate containers.
(c)
As specified in section 24.10.1(b) the area must be inspected for any
spent abrasive, paint, particulate, dust and/or other debris which may
have escaped containment and any and all such debris must be
collected and placed in single 6-mil or double 4-mil plastic bags or an
appropriate container.
(d) Any and all bags and containers must be securely sealed. Removal and
disposal must be in accordance with applicable solid and hazardous
waste regulations.
24.11 General Provisions
24.11.1
Purpose
The purpose of this regulation is to specify appropriate procedures for the
removal of lead based paint from exterior surfaces.
24.11.2
Authority
These regulations are authorized pursuant to R.I. Gen. Laws § 42-17.1-2(s)
and 23-23, as amended, and have been promulgated pursuant to the
procedures set forth in the R.I. Administrative Procedures Act, R.I. Gen.
Laws Chapter 42-35
24.11.3
Application
The terms and provisions of this regulation shall be liberally construed to
permit the Department to effectuate the purposes of state law, goals and
policies.
24.11.4
Severability
If any provision of this regulation or the application thereof to any person or
circumstance, is held invalid by a court of competent jurisdiction, the validity
of the remainder of the regulation shall not be affected thereby.
24.11.5
Effective Date
Page 8 of 8
The foregoing regulation, "Removal of Lead Based Paint from Exterior
Surfaces”, as amended, after due notice, is hereby adopted and filed with the
Secretary of State this _________ day of _______________, 20___ to
become effective twenty (20) days thereafter, in accordance with the
provisions of Chapters 23-23, 42-35, 42-17.1, 42-17.6, of the General Laws
of Rhode Island of 1956, as amended.
W. Michael Sullivan, PhD., Director
Department of Environmental Management
Notice Given on: February 21, 2007
Public Hearing held: March 23, 2007
Filing Date:
June 29, 2007
Effective Date: July 19, 2007