650-RICR-20-00-1
650-RICR-20-00-1. Red Book (version Periodic Refile, 10/09/2003 to 09/05/2013)
Part Three.
Activities
under Council
Jurisdiction
Rhode Island Coastal Resources Management Program
Rev. Pg. 9/14/98
Page 1
Section 300.1
Section 300.
In Tidal and Coastal Pond
Waters, on Shoreline Features
and Their Contiguous Areas
Section 300.1
Category B Requirements
All persons applying for a Category B Assent are
required to:
(1) demonstrate the need for the proposed
activity or alteration;
(2) demonstrate that all applicable local zoning
ordinances, building codes, flood hazard standards,
and all safety codes, fire codes, and environmental
requirements have or will be met;
local approvals are required for activities as
specifically prescribed for nontidal portions of a
project in Sections 300.2, 300.3, 300.6, 300.8,
300.9, 300.11, 300.13, 300.15 and 300.17; for
projects on state land, the state building official,
for the purposes of this section, is the building
official,
(3) describe the boundaries of the coastal waters
and land area that are anticipated to be affected;
(4) demonstrate that the alteration or activity
will not result in significant impacts on erosion
and/or deposition processes along the shore and in
tidal waters.
(5) demonstrate that the alteration or activity
will not result in significant impacts on the
abundance and diversity of plant and animal life.
(6) demonstrate that the alteration will not
unreasonably interfere with, impair, or significantly
impact existing public access to, or use of, tidal
waters and/or the shore;
(7) demonstrate that the alteration will not result
in significant impacts to water circulation, flushing,
turbidity, and sedimentation;
(8) demonstrate that there will be no significant
deterioration in the quality of the water in the
immediate vicinity as defined by DEM;
(9) demonstrate that the alteration or activity
will not result in significant impacts to areas of
historic and archaeological significance;
(10) demonstrate that the alteration or activity
will not result in significant conflicts with
water-dependent uses and activities such as
recreational
boating,
fishing,
swimming,
navigation, and commerce, and;
(11) demonstrate that measures have been taken
to minimize any adverse scenic impact (see Section
330).
Each topic shall be addressed in writing.
Additional requirements are listed for specific
Category B activities and alterations in the sections
that follow.