Filling, Removing, or Grading
of Shoreline Features
A. Definitions
1. Filling is the deposition of materials of
upland origin onto shoreline features or their
contiguous areas (see Section 300.9 for inland
disposal of dredged materials).
2. Removing is the process of taking away,
including excavation, blasting, or mining, any
portion of a shoreline or its contiguous area.
3. Grading is the process whereby fill or the
soils of a shoreline or its contiguous area are
redistributed or leveled.
Established agricultural practices in areas
contiguous to shoreline features are excluded from
this section.
4. Erosion and Sediment Control Plan: An
erosion and sediment control plan is a description
of the proposed best management practices,
detailed site plans, and written narrative that, when
implemented, provides protection and restoration
of coastal resources by reducing erosion and
controlling sediment onsite as well as minimizing
other negative impacts associated with land
development activities.
B. Policies
1. All filling, removing or grading activities
shall be done in accordance with the policies and
standards of this section and the standards and
specifications set forth in the most recent edition of
the Rhode Island Soil Erosion and Sediment
Control Handbook.
2. All new activities subject to Section 300.3
(residential, commercial, and industrial structures),
Section 300.13 , Section 320, or those activities
which disturb more than 5,000 square feet of land
on a site shall prepare and implement an erosion
and sediment control plan approved by the Council
which references all necessary practices for erosion
and sediment control. All erosion and sediment
control plans shall be consistent with applicable
policies and standards contained in the Rhode
Island Coastal Resources Management Program
and the standards and specifications set forth in the
most recent edition of the Rhode Island Soil
Erosion and Sediment Control Handbook. All
erosion and sediment control plans shall be strictly
adhered to.
3. The Council recognizes the most recent
version of the Rhode Island Soil Erosion and
Sediment Control Handbook, and its amendments,
published jointly by the Rhode Island Department
of Environmental Management and the United
States Department of Agriculture (USDA),
Natural Resources conservation Service (NRCS),
as containing appropriate “Best Management
Practices” (BMP) for use within the CRMC’s
jurisdiction. All erosion and sediment control plans
shall be consistent with this manual. Applicants
are also encouraged to consult the most recent
version of the Rhode Island Stormwater Design
and Installation Standards Manual during the
preparation of their erosion and sediment control
plan in order to ensure consistency with the
Council’s stormwater management requirements
(Section 300.6).
4. Routine filling, removing, or grading of
bulk materials (e.g. coal, salt, etc.) that occurs as
part of the normal operations of an existing bulk
transfer facility (e.g., the Port of Providence) which
is adjacent to type 6 waters is excluded from the
provisions of this section provided that all filling,
removing or grading activities are done in
accordance with applicable guidance manuals
which specify the appropriate best management
practices for Rhode Island. Any filling, removing
or grading that will result in a modification of an
existing bulk transfer facility’s infrastructure shall
be subject to the policies and standards in this
section.
5. Filling, removing, or grading activities shall
be reviewed at the Category B level when (a) the
filling or removing involves more than 10,000
cubic yards of material, (b) the affected area is
greater than two acres, or (c) the affected area is a
designated historic area or archaeologically
sensitive site.
C. Prohibitions
1. Filling, removing, or grading is prohibited
on beaches, dunes, undeveloped barrier beaches,
coastal wetlands, cliffs and banks, and rocky
shores adjacent to Type 1 and 2 waters unless the
primary purpose of the alteration is to preserve or
enhance the feature as a conservation area or
natural buffer against storms.
2. Filling, removing, or grading on coastal
wetlands is prohibited adjacent to Type 1 and 2
waters, and in coastal wetlands designated for
preservation adjacent to Type 3, 4, 5 and 6 waters,
unless
a
consequence
of
an
approved
mosquito-control ditching project (Section 300.12).
3. On-site beach materials (cobbles, sand, etc.)
may not be used as construction material.
4. Mining is prohibited on coastal features.
Rhode Island Coastal Resources Management Program
Rev. Pg. 7/18/2002
Page 2
Section 300.2
D. Standards
1. The following standards apply in all cases
where filling, removal, or grading is undertaken:
(a) Fill slopes shall have a maximum grade of
30 percent.
(b) All excess excavated materials, excess fill,
excess construction materials, and debris shall
be removed from the site and shall not be
disposed in tidal waters or on a coastal feature.
(c)
Disturbed
uplands
adjacent
to
a
construction site shall be graded and re-
vegetated or otherwise stabilized to prevent
erosion
during
or
immediately
after
construction. Nutrients shall be applied at
rates necessary to establish and maintain
vegetation without causing significant nutrient
runoff to surface waters.
(d) Removal or placement of sediments along
jetties or groins may be permitted only as part
of an approved dredging or beach nourishment
project (see Section 300.9).
(e) All fill shall be clean and free of materials
which may cause pollution of tidal waters.
(f) Cutting into rather than filling out over a
coastal bank is the preferred method of
changing upland slopes.
(g) Limit the application, generation, and
migration of toxic substances and ensure that
toxic substances are properly stored and
disposed of onsite in accordance with all
applicable
federal,
state, and
local
requirements.
2. The following upland and shoreline
earthwork standards shall be required in those
cases where the Council determines that additional
measures are warranted in order to protect the
environment of the coastal region. Such
requirements shall be listed on Assents as
stipulations.
(a) For Earthwork on shoreline features:
(1) Prior to initiation of construction,
the contractor may be required to meet
on-site with the CRMC staff to discuss
and clarify the conditions of the permit.
(2) A re-vegetation plan shall be
submitted for review and approval when
construction is undertaken on a barrier
beach. This plan shall describe plant
material, methods of planting, time of
planting,
soil
amendments,
and
maintenance.
(3)
Construction
materials
and
excavated soils shall not be placed or
stored on any shoreline feature excepting
developed barrier beaches and manmade
shorelines.
(4) All disturbed soils shall be graded
smooth to a maximum 3:1 slope and re-
vegetat ed
immediately
after
construction, or temporarily stabilized
with mulch, jute matting, or similar
means until seasonal conditions permit
such re-vegetation.
(5) In sensitive areas, work shall be
carried out from areas above slope from
coastal features. Machinery and
construction equipment shall normally
not be allowed to operate on a coastal
wetland. For unavoidable work on a
coastal wetland, a protective cover shall
be deployed to minimize disturbance.
(6) In instances where the CRMC
permits temporary disturbance of a
coastal feature, shoreline slope, buffer
zone, or area of beach grass, the
disturbed area shall be completely
restored by the owner under the
guidance of CRMC staff.
(7) Concrete structures which will come
in contact with salt water shall be
constructed with concrete which utilizes
a Type II or Type V air-entraining
Portland cement or an equivalent that is
resistant to sulfate attacks of seawater.
(b) For upland earthwork, measures shall be
taken to minimize erosion:
(1) A line of staked hay bales or other
erosion-preventing devices (including
diversion ditches, check dams, holding
ponds, filter barrier fabric, jute or straw
mulch) shall be placed at the downslope
perimeter of the proposed area of
construction prior to any grading, filling,
construction, or other earthwork. Hay
bales shall be toed in to a depth of 3 to 4
inches, and maintained by replacing
bales where necessary until permanent
re-vegetation of the site is completed.
No soils or other materials are
authorized to pass beyond the bale line.
(2) All slopes shall be returned to the
original
grade
unless
otherwise
specified.
(3) Where natural or manmade slopes
are or have become susceptible to
erosion, the slopes shall be graded to a
suitable slope and re-vegetated with a
thick rooting brush vegetation. Mulch
shall be applied as necessary to provide
Rhode Island Coastal Resources Management Program
Rev. Pg. 7/18/2002
Page 3
Section 300.2
protection against erosion until the
vegetation is established.
(4) Construction shall be timed to
accommodate stream and/or runoff flow
and not allow flows over exposed, un-
stabilized soils, or into or through the
excavation. Flows shall not be
restricted in such a manner that flooding
or inhibition or normal flushing occurs.
(5) Any pumping of groundwater which
may be necessary for de-watering shall
be discharged into sediment traps
consisting of a minimum of staked hay
bale rings enclosing crushed stone or
trap rock of a size sufficient to disperse
inflow velocity. Hay bales shall be
recessed 4 to 6 inches into the soil and
maintained.
(6) There shall be no discharge of
sediment-laden waters into storm drains.
Storm drains shall be surrounded by
staked hay bales to intercept sediment.
(c) For any disturbance of steep slopes (over
15 percent):
(1) Where such construction is allowed,
the following shall be observed: (1) no
fill shall be allowed on the slope; (2)
excavation shall be kept to an absolute
minimum; and (3) vegetative cover on
the
slope
shall
be
permanently
maintained to the maximum extent
physically possible.
(2) Where the potential for damage to a
slope exists from runoff, staked hay
bales, berms, or similar diversions shall
be placed at the top and toe of the slope.
Collected water shall be suitably
discharged through properly constructed
drains or swales. Wherever possible,
drainage swales shall be constructed
along and adjacent to property lines so
as to avoid drainage onto adjacent
properties. Swales shall be capable of
handling runoff from a 10-year-rainfall
occurrence.
(3) For excavations on slopes or
directly adjacent to coastal features, the
excavated materials shall be cast
upslope of the trench or excavation so as
to minimize downslope runoff of
sediment.
(4) Pedestrian access over steep
shoreline slopes and banks shall be in
the form of field stone or similar
stabilized paths or elevated stairs.
Access over bluffs shall be with elevated
stairs only.