1.1 Purpose and Authority
A. These rules shall apply to every public
utility as hereinafter defined doing business as such, or authorized
to do so, within the State of Rhode Island.
B. These rules shall be amended or
repealed, and applications therefore shall be made, in accordance
with provisions of R.I. Gen. Laws Chapter 42-35 entitled
"Administrative Procedures".
1.2 Definitions
A. "Division" means the Rhode
Island Division of Public Utilities and Carriers.
B. "Administrator" means Public
Utility Administrator of the Division of Public Utilities and
Carriers.
C. "Public utility" means and
apply to every corporation, company, person, association of persons,
their lessees, trustees, or receivers appointed to any court
whatsoever, that now or hereafter may own, lease, operate, manage or
control any electric plant or equipment or any part of any electric
plant or equipment, within this State, for the production,
transmission, delivery or furnishing of electricity, light, heat or
power, either directly or indirectly, to or for the public.
D. "Electric plant" means all
real estate, fixtures, equipment and personal property owned,
controlled, operated or managed in connection with or to facilitate
the production, generation, transmission, delivery or furnishing of
electric energy.
E. "Customer" means and applies
to every corporation, company, person, association of persons, their
lessees, trustees or receivers appointed by any court whatsoever,
that now or hereafter, may be supplied with electric service by any
public utility as herein defined.
F. "Service" means, in its
broadest and most inclusive sense, the furnishing of electricity to a
customer by a public utility.
G. The term "Meter", without
other qualification, shall mean a device or appliance for the
measurement of electrical quantities to be used as a basis for
determining charges by a public utility for furnishing or rendering
electric service to a customer.
H. The term "creep" means the
motion of the rotor of a meter with normal operating voltage applied
and the load terminals open-circuited.
1.3 Service Provisions
A. Filing of Rates Schedules.
1. Schedules showing all rates, tolls and
charges by a public utility shall be filed and kept open to public
inspection in accordance with the provisions of R.I. Gen. Laws §
39-3-10.
B. Application for Service.
1. An Applicant desiring service under a
public utility's filed rate schedules may be required to make
application in writing, in accordance with the forms prescribed by
the public utility.
C. Information to Customers - Rate
Selection.
1. Each public utility shall, upon request,
provide a customer with such information and assistance as is
necessary to enable the customer to secure the most advantageous rate
or rates. Further, each utility shall inform the applicant of any
service connection and/or installation charge to be applied to the
bill. Each customer shall be responsible for selecting, and taking
service at the most advantageous rate or rates.
2. Each public utility shall, upon request,
explain to a customer the method of reading meters and how the
billing is calculated.
3. Where special charges for construction,
maintenance, replacement costs, expenses or overtime work are not
specifically set forth in a utility's tariff, the utility shall,
before performing non-emergency work, provide the applicant or
customer with an estimate of charges to be levied, in writing if
requested.
4. In addition, the utility shall make
available free information concerning the utility's programs,
services, rights and responsibilities, and complaint procedures for
the general public.
D. Deposits.
1. A public utility, as security for prompt
payment of a customer's indebtedness to it, may require a cash
deposit or other collateral satisfactory to it before rendering, or
as a condition of continuing to render service to such customer. This
deposit shall not be more than the estimated bill for two times the
normal billing period. Interest shall be paid on deposits held six
(6) months or more in accordance with applicable rate schedules or
the terms and conditions of the public utility. Deposits, plus
accrued interest thereon, less any amount due the public utility,
will be refunded upon termination of service. When a deposit is
applied against an account that has been terminated, interest shall
cease to be accumulated on the balance at the date of termination.
E. Meter Reading and Bill Forms.
1. The metering equipment for each service
shall be such as to register the number of kilowatt-hours (kwh)
delivered during any period, and to the extent applicable, the number
of Kilo-Var Hours (KvarH) and the Kilowatt (Kw) and Kilo-Volt Amperes
(Kva) demand.
2. All service meters shall be read at
regular intervals and on the corresponding day of each meter reading
period insofar as practicable within regularly scheduled work days.
3. Bills shall be rendered at regular
intervals and shall show the date of the current meter reading and
the amount or quantity of service for the billing period; and shall
also show any applicable discount or penalty date.
4. Each public utility shall keep an
accurate account of all charges for service billed each customer and
shall maintain records showing information from which each bill
rendered may be readily computed.
F. Customer Complaints.
1. Each public utility shall make a full
and prompt investigation of customer complaints made either directly
or through the Division. A record of complaints received, other than
those of a minor nature shall be kept for at least two years and
shall show the name and address of the complainant, the date and
character of the complaint and the disposition thereof.
2. Each public utility shall endeavor to
keep its appointments. In the event cancellation of appointment is
unavoidable, every reasonable effort should be made to promptly
notify the customer.
3. During an abnormal service outage the
utility shall make reasonable efforts to inform the general public
about the areas affected, the progress of service restoration, and
anticipated restoration schedules when available. Information for the
general public shall be made through advisories to the news media.
Business offices shall make similar information available to callers,
using appropriate communications systems.
G. Change in Character of Service.
1. If a change in character of service to
a customer is brought about for the convenience or benefit of the
public utility, the public utility shall pay such part of the cost of
changing the equipment of the customer affected as shall be
determined by mutual agreement. An equitable settlement would
normally be on the following basis: Payment by the public utility to
the customer of:
a. The cost of the customer's electrical
utilization and equipment that is made obsolete, less proper
allowance for depreciation.
b. The cost of installing the new equipment
and removing the old, less the salvage value of such equipment as the
customer retains.
c. The cost of making the necessary change
in customer's wiring.
H. Discontinuance of Service
1. By Customer: A customer shall be
required to give at least twenty four (24) hour notice of its
intention to discontinue service in accordance with the provisions of
the applicable rate or terms and conditions of service and shall be
responsible for all charges until expiration of such notice period.
2. By the Public Utility:
a. Non-Payment of Bills. In accordance with
the provisions of the applicable rate or terms and conditions of
service, a public utility may require that bills be paid within a
specified time after presentation. On and after thirty (30) days from
the date of presentation service may be discontinued for non-payment
provided written notice to the customer has been deposited in the
U.S. mail at least ten (10) days prior to the date of discontinuance.
In lieu of the discontinuance, or upon reconnection, the public
utility may require payments at less than monthly intervals. If
service is discontinued for non-payment, the public utility may make
a reasonable charge for reconnection. Service must not be
discontinued on a Friday, a Saturday, or the day before a holiday.
b. For Violation of Rules: No public
utility shall discontinue service to a customer for violation of any
rule unless it shall first have deposited in the U.S. mail written
notice to the customer at least ten (10) days prior to the date of
discontinuance advising the customer of the particular rule that has
been violated, except that service may be discontinued immediately
when continuance of the service would endanger life or property, or
when ordered to do so by any governmental agency or official having
jurisdiction.
c. For Fraudulent Use of Service: A public
utility may discontinue service without notice whenever a fraudulent
use of the service by the customer is detected.
1.4 Quality of Electric Service
A. Standard Frequency - The standard
frequency for alternating current distribution systems shall be sixty
(60) Hertz, with permissible variations not exceeding maximum and
minimum values of 60.3 and 59.7 Hertz.
B. Service Voltage - The following service
voltage standards shall be maintained at the point where the
electrical system of the supplier and the electrical system of the
user are connected.
1. Table 1 (These values are ANSI C84.1
(1989). Values shall change if ANSI adopts new standards.)
Established
Standard Service Voltage
Minimum
Voltage
Maximum
Voltage
Type
of Service
120
114
126
Single
Phase
120/240
114/228
126/252
Single
or Polyphase
208Y/120
197Y/114
218Y/126
Single
or Polyphase
240
228
252
Single
or Polyphase
480Y/277
456Y/263
504Y/291
Single
or Polyphase
480
456
504
Single
or Polyphase
600
570
630
Single
or Polyphase
2400
2340
2520
Single
or Polyphase
4160Y/2400
4050Y/2340
4370Y/2520
Single
or Polyphase
12470Y/7200
12160Y/7020
13090Y/7560
Single
or Polyphase
2. For distances exceeding a 2-mile radius
from any distribution sub-station serving the customer, the minimum
permissible voltage shall not be less than 97% of the minimum values
shown in Table 1, § 1.4(B)(1) of this Part.
C. Momentary Fluctuations - Momentary
fluctuations of voltage and/or frequency at the customer's service
shall not be construed as non-compliance with this Section (§ 1.4 of
this Part) and for the purposes of these Rules a momentary
fluctuation of voltage and/or frequency shall be defined as a change
in voltage and/or frequency not exceeding a three (3) second time
interval of a non-periodic recurring cycle; provided, however, that
fluctuations in frequency and/or voltage having continuous and/or
recurring periodic time cycles shall not be considered as compliance
with this Section (§ 1.4 of this Part); and the public utility shall
immediately initiate and complete all necessary action to eliminate
and/or correct the cause of such fluctuations, if found to originate
directly or indirectly within the public utility's system.
D. Abnormal Conditions - These Rules shall
not apply to temporary conditions due to acts of God, windstorm,
fire, strikes, insurrections, construction and/or maintenance or
other disruptions of service beyond the immediate control of the
public utility; provided, however, that all public utilities shall
initiate immediate action and proceed without delay and perform all
necessary work to restore its system and/or customers' services to
normal operating conditions.
E. Special Provisions - No public utility
shall be required to maintain service voltage according to Table I,
at any point beyond the point where the electrical system of the
supplier connects to the electrical system of the user if the wire or
cables of the customer are
1. inadequate or undersized
2. not capable of delivering the customer's
normal requirements for electricity, or
3. not in conformance with the requirements
of the National Electric Code or any applicable statute, ordinance,
rule or regulation of any authority having jurisdiction.
1.5 Voltage Surveys and Records
A. Each public utility shall make a
sufficient number of voltage tests for the areas (cities, villages
and rural areas) served to indicate compliance with voltage
requirements contained in Table 1 (§ 1.4(B)(1) of this Part).
B. All voltage test records shall be
retained by the public utility for at least two (2) years and shall
be available for inspection by the Division.
1.6 Interruptions of Service
A. Each public utility shall use all
reasonable means to avoid interruption of service but should an
interruption occur, service shall be re-established within the
shortest time practicable, consistent with safety requirements.
B. Each public utility shall make a record
of all interruptions of service of more than five (5) minutes'
duration affecting the entire distribution system of a single
community or the entire distribution circuit serving a division of a
community and shall include in such record the date and time of
interruption, approximate number of customers affected, the date and
time of service restoration, and, when known, the cause of such
interruption. Reports with reference to such service interruption
shall be made monthly to the Division on Form E-1.
C. Each utility shall notify the Commission
(or a designated member of the staff) by telephonic means of any
major interruption of service when the interruption results in 1000
or more customer hours between normal working hours increasing to
3000 or more customer hours after normal business hours. A company
having less than 5,000 customers will notify the Commission when
outages exceed 100 customer hours during normal working hours and
increasing to 200 customer hours after normal business hours.
D. When service is interrupted to perform
work on lines or equipment, such work shall be done at a time causing
minimum inconvenience to customers consistent with the circumstances.
Customers seriously affected by such interruption shall, whenever
reasonably possible, be notified of the time and expected duration of
the service interruption.
1.7 Meter Accuracy and Testing
1.7.1 Inspection of Meters
A. Meters removed from service. All meters
removed from service, which are to be reinstalled, shall be inspected
and tested for correctness. In addition, worn or damaged parts shall
be replaced.
B. Meter installations. All polyphase
meters and demand devices shall be tested before installation to
ensure accuracy of operation when installed. In connection with
installation an electrical check shall be made of all instrument
transformer connections.
C. Test and Calibration of Meters.
1. Polyphase Meters. All polyphase meters
shall be tested at loads and adjusted to tolerances as follows:
Test
Load in Rated Meter Capacity
Power
Factor
to
Tolerance of
100%
1.0
Plus/Minus
1%
10%
1.0
Plus/Minus
1%
100%
0.5
Plus/Minus
2%
a. Meters also shall be checked for "creep"
at no load and rated voltage.
2. Demand Devices. All indicating and
recording demand devices shall be adjusted as follow:
a. Zero Adjustment - No demand device that
fails to reset properly to zero shall be placed in service or allowed
to remain in service without adjustment.
b. Up-Scale Check - Tests to determine the
accuracy of a demand device shall be made at a point approximately
mid-scale. No demand under test having an error in indication or
registration of more than 2% plus or minus (in terms of full scale
deflection) shall be placed, or allowed to remain, in service without
readjustment.
c. Time Cycle Devices - All motors used to
maintain a timing cycle where such timing cycle directly affects
meter registration, shall be tested to insure operation at the proper
speed.
1.7.2 Test Schedules for all Watthour
Meters and Demand Devices
A. New Meters. The manufacturer's test on
all new meters will be accepted as a first test on a meter and so
recorded if built to the EEI-AEIC-NEMA or ANSI standard for Polyphase
meters.
B. All alternating current watthour meters
and demand devices in service shall be tested in accordance with the
following requirements.
1. Meters up to and including 12KVA shall
be tested in accordance with either §§ 1.7.2(B)(1)(a) or (b) of
this Part. The Schedule initially adopted by the public utility shall
not be changed without notifying the Division.
a. Periodic Test Schedule. Watthour meters
may be tested on periodic basis by which every meter shall be tested
at least once every twelve (12) years.
b. Selective Test Plan. Watthour meters may
be tested under a selective plan as follows.
(1) Selective Test Population. This shall
include those single-phase common or residential type meters of 0-12
KVA capacity. It shall not include those specific meter groups known
to be adversely affecting overall meter accuracy, if these meters are
placed on a fixed retirement program not exceeding five (5) years.
Meters removed due to a fixed retirement program need not be tested
by the utility.
(2) Sample Test Group. A Sample Test Group
representing a cross-section of the meters in the Selective Test
Population on company lines shall be selected at random and tested
each year. The Sample Test Group shall be at least 1% of meters in
the Selective Test Population, but not less than 500 meters. For a
company having less than five thousand meters, the Sample Test Group
shall be at least 2% of meters in the Selective Test Population, but
not less than 40 meters.
(3) Cumulative Sample Test Group. The
Cumulative Sample Test Group includes the Sample Test Group of the
current year plus those of the immediately preceding years to a
maximum of five Sample Test Groups.
(4) Number of Meters to be Tested. The
percentage of meters in the Cumulative Sample Test Group which
displays a weighted average accuracy outside the limits of 98% to
102% shall be used to determine from the test Ratio Curve the minimum
number of meters to be tested (Total Meter Test Group) in the ensuing
year.
(5) Supplemental Test Group. The
Supplemental Test Group is the difference between the Total Meter
Test Group and the Sample Test Group.
(AA) Supplemental = (Total) - (Sample)
(BB) Tests of meters which are part of the
Selective Test Population and which are returned to the shop for
maintenance may be credited toward completion of the Supplemental
Test quota. Additional meters selected to fill the Supplemental Test
quota shall be either:
(CC) Meters in service without a test, or
meters of specific types which are contributing a greater than
average percentage of the meters outside the limits of 98% to 102%.
(DD) Specific meter groups known to be
adversely affecting over-all meter accuracy, if placed on a fixed
retirement program not exceeding five years may be excluded from the
Selective Test Population. Meters removed due to a fixed retirement
program need not be tested by the utility.
(EE) Such meters on a retirement program
shall be junked at a uniform annual rate to eliminate them from
Company lines in five years or less from the start of the program. If
the retirement rate is not maintained, all remaining meters in the
group must become part of the Selective Test Population and subject
to the Selective Test Procedure.
C. Meters in excess of 12KVA and not
exceeding 100 KVA shall be tested on a periodic basis by which every
meter shall be tested at least once every six (6) years.
D. Meters in excess of 100 KVA shall be
tested on a periodic basis by which every meter shall be tested at
least once every (5) years.
E. In lieu of the periodic and selective
test plans described in §§ 1.7.2(B), (C) and (D) of this Part, a
utility may, after notifying the Division, implement a statistical
sample testing program based on the provisions of the most current
version of ANSI/ASQC Z1.9, American National Standard Sampling
Procedures and Tables for Inspection by Variables for Percent
Nonconforming or on the provisions of a comparable nationally
recognized statistical sampling methodology.
F. Integrated demand meters shall be
subject to the same periodic tests or sample tests as the meters with
which they are associated.
G. For the purpose of § 1.7.2(C) of this
Part, the KVA rating of a Self-contained AC Watthour Meter is the
product of the rated voltage in Kilo-volts, the rated test amperes
and the number of stators. The KVA rating of an instrument
transformer classed watthour meter is the product of the primary
voltage in Kilo-volts, the nameplate rating of the current
transformers, and the number of stators.
H. All meters over 12 KVA capacity removed
from service and not yet due for testing must be tested and
recalibrated before being put back into service. These tests may be
included as a part of the periodic or statistical sampling test
populations.
1.7.3 Request Tests
A. All request tests must be made with the
meter in its service location whenever practicable to do so.
B. Tests by public utility. When requested
by a customer, each public utility shall test the accuracy of the
customer's meter within fifteen (15) days from the time the request
is made. If the meter has been tested during the preceding thirty-six
(36) months, a public utility may require the deposit of a fee of
Twenty-five dollars ($25) for such a test. If on testing the meter is
found to be fast by more than 2%, the deposit shall be promptly
refunded. If the meter is not found to be fast by more than 2% the
public utility shall retain the amount deposited for the test. A
customer may be represented in person or by an agent when the public
utility conducts the test on the customer’s meter. A report giving
the name of the customer requesting the test, the date of the
request, the location, the type, make size, the serial number of the
meter, the date tested, and the result of the test shall be supplied
to such customer within a reasonable time after the completion of the
test.
C. Tests by Division. Upon written
application to the Division by a customer, a test will be made of the
customer's meter in the presence of the Division's representative as
soon as practicable. Each application to the Division for test of a
meter shall be accompanied by a fee of twenty-five dollars ($25). If
upon testing, the meter is found to be fast by more than 2%, the
Division shall return to the customer the amount of fee paid by the
customer to the Division. When notified of an application submitted
to the Division by a customer for a referee test as herein provided,
the public utility shall not knowingly remove, interfere with, or
adjust the meter to be tested without the written consent of the
customer and approved by the Division.
1.7.4 Reporting Requirements
A. For utilities that test according to the
periodic test schedules or selective tests plans described in §§
1.7.2(B), (C) and (D), reports of periodic and sample tests of meters
shall be reported to the Division on Form E-2 and Form E-2A once a
year, or on the public utility's Standard Meter Test Report Form.
B. For utilities that implement the
statistical sample testing program as described in subparagraph §
1.7.2(E), reports of in-service and request tests of watthour meters
shall be made each year and filed with the Division not later than
the 15th day of March the following year. All reports of in-services
tests are to include the number of meters tested, the number of
meters found outside of limits, and the size of the population. Where
appropriate, the reports should break down the population of meters
by type and be accompanied by appropriate performance parameters for
that type.
C. A complete record of the latest test
made on a meter shall be retained in the public utility's files for
three years.
1.7.5 Billing Adjustments
A. Calculation of Error. The accuracy of
registration of the meter and its performance in service shall be
determined by its average error, as follows:
1. The average error shall be the weighted
average of its error at light load with a weighting of one and its
error at heavy load with a weighting of four.
2. Any adjustment of charges that is made
in accordance with this rule shall be based on such average error.
B Adjustments.
1. Fast Polyphase Meters. Whenever a
polyphase meter is found to be fast in excess of 2% of the correct
amount, the Company shall refund to the customer an amount equal to
the charge for the excess kilowatt hours billed for the twelve (12)
month period immediately preceding such test, unless the time when
the error first developed, or occurred can be definitely fixed, in
which case the amount to be refunded shall be calculated from that
time. Under no circumstances will an adjustment of a customer's bill
be made if there is evidence that the meter has been tampered with.
2. Slow Polyphase Meters. Whenever a
polyphase meter is found to be slow in excess of 2%, the Company may
make a charge to the customer for the unbilled kilowatt hours
supplied for the previous twelve (12) months or since the last test,
whichever is the shorter period. However, where there is evidence
that the meter has been tampered with, the Company may charge the
customer for all unbilled kilowatt-hours supplied since the estimated
data of the tampering.
3. Non-Registration. If a meter is found
which does not register, the bill for the period of non-registration
shall be based upon information recorded prior or subsequent to the
period of non-registration and by any other pertinent information
supplied by the customer or known to the public utility.
1.7.6 Testing Facilities and Equipment:
A. Single Polyphase Standards.
1. Laboratory Standards. Every public
utility shall have available one or more laboratory standards for the
sole purpose of checking working standards. All standards shall be
certified at least once each year in a laboratory acceptable to the
Division. Each standard shall be accompanied by calibration tables
noting the corrections at various working loads. These calibration
tables when superseded shall be kept on file in the office of the
public utility for a period of two (2) years.
2. Each public utility shall have an
adequate number of working standards for testing customers' meters.
These working standards shall be compared to laboratory standards at
least once every twelve (12) months. Each working standard shall be
accompanied by a calibration table noting the corrections at various
working loads. These calibration tables, when superseded shall be
retained by the public utility for a period of two (2) years. If
comparisons with the laboratory standards show the working standard
to be in error by 1% or over, it shall be recalibrated and/or
replaced. In case a public utility does not maintain a reference
watthour standard, the working standards must be checked every twelve
(12) months in a laboratory acceptable to the Division.
B. Each public utility shall have an
adequate number of working standards for testing customers' meters.
These working standards shall be compared to laboratory standards at
least once every twelve (12) months. Each working standard shall be
accompanied by a calibration table noting the corrections at various
working loads. These calibration tables, when superseded shall be
retained by the public utility for a period of two (2) years. If
comparisons with the laboratory standards show the working standard
to be in error by 1% or over, it shall be recalibrated and/or
replaced. In case a public utility does not maintain a reference
watthour standard, the working standards must be checked every twelve
(12) months in a laboratory acceptable to the Division.
1.8 Equipment and Facilities
A. Standard Practice
1. In determining standard practice, the
Division will be guided by the provisions of the NATIONAL ELECTRICAL
SAFETY CODE, the NATIONAL ELECTRIC CODE, and such other relevant
codes as shall be approved by the American Standards Association,
except as any of the foregoing may in any particular case be modified
by statute, ordinance, orders, rules or regulations by governmental
bodies or agencies having jurisdiction.
B. Construction and Maintenance
1. Each public utility shall construct,
install, operate and maintain its plant, structures, equipment and
lines in accordance with standard practice as defined in paragraph 1
above, and insofar as practical, in such a manner as best to
accommodate the public, and to prevent interference with service
furnished by other public utilities.
C. Joint Pole Construction
1. Except as otherwise permitted by the
Division for cause shown, all installations making use of poles
either for single or joint occupancy shall conform to standard
practice, and current joint-owned pole agreement between various
utility companies.
D. Safety Instructions
1. Each public utility shall adopt
comprehensive instructions for the safety of employees, and shall
supply a copy thereof to each employee before assignment to duty in
generating stations, substations, on overhead or underground lines,
and shall be satisfied that such employees have been properly
informed of safe practices and are cognizant of all hazards involved,
as per OSHA standards, 29 C.F.R. § 1910.260, et seq ., as the
same from time to time are amended.
E. Resuscitation
1. Each public utility shall instruct its
employees engaged in electrical work in the practice and use of
accepted rules for resuscitation from electrical shock, as per OSHA
standards 29 C.F.R. § 1910.260, et seq ., as the same from
time to time are amended. Copies of such rules shall be furnished to
each such employee. Electrical work as used herein shall be construed
to mean work on live electric conductors and equipment energized at
potential exceeding 150 volts line to ground.
F. Accidents
1. Each public utility shall report to the
Division as soon as possible after each accident happening in
connection with the operation of its property, facilities or service,
wherein any person shall have been caused an injury requiring
hospitalization in excess of 24 hours. The first report may be
preliminary, but, if so, shall be followed later by as full a
statement as possible of the cause and details of the accident and
the precautions taken, if any, to prevent similar accidents. In case
of fatal accidents, immediate notice shall be given by telephone to
the Division, (Form E-3, Appendix "D").
1.9 Records and Reports
A. Station Records
1. Each public utility shall keep
sufficient records of the operation of its generating units and
distribution supply feeders to show the characteristics and the
performance of each.
2. Unless sufficient information is
furnished by the public utility supplying the energy, each public
utility purchasing electric energy shall maintain adequate
instruments and meters to obtain complete information as to such
purchases.
B. Preservation of Records
1. All records required by these rules
shall be preserved by the public utility for a period of two (2)
years unless otherwise specified herein or other controlling rules or
regulations require a longer period of retention. Such records shall
be kept within the State of Rhode Island at the office or offices of
the public utility and shall be open at all reasonable hours for
examination by the Division.
C. Reports to Division
1. Each Public Utility shall file periodic
reports with the Division on the following forms which will be
furnished by the Division upon Request:
Form
No.
Title
Period
Appendix
E-1
Interruption
of Service Report
Monthly
"A"
E-2
Periodic
Meter Test Report
Annually
"B"
E-2A
Selective
Meter Test Report
Annually
"C"
E-3
Utility
Accident Report
As
Required
"D"