885-RICR-00-00-3. East Providence Waterfront Commission Application and Processing Fees (version Adoption, 07/01/2019 to 10/19/2020)
To view the official Final Regulation for accessibility and readability, click Download Regulation:
Download Regulation
3.1 Commission Fees-General
A. With the exception of the
initial pre-application workshop meeting, the applicant is
responsible for all design workshop costs and all costs relating to
design review and public hearings including, but not limited to
advertising, certified mail, the stenographer, legal fees, design
review, administrative costs and other direct costs including peer
review.
B. The applicant shall submit
a certified bank check with the development application payable to
the East Providence Waterfront Commission in the amount listed below.
C. All filing and application
fees are non-refundable.
3.2 TIER I Fees - Minor Projects
This fee schedule applies to
determinations of consistency of use, hearing panel review, and
alterations, additions and new construction with an estimated
construction cost of $100,000 or less. Project costs shall be
determined by the Executive Director but shall exclude site
acquisition, remediation, and site preparation costs.
3.2.1 Certification
of Consistency of Use and Hearing Panel Review
The fee for a certificate of
consistency of use is $100.00.
The fee for Hearing Panel and
Waterfront Commission hearings for conditional use and deviations
for a project without alterations, additions or construction is
$200.00.
3.2.2 Alterations,
Additions and Construction
The project fee for project
costs up to $5,000 is $50.00.
The project fee for project
costs from $5,000 to $9,999 is $100.00.
The project fee for project
costs from $10,000 to $49,999 is $250.00.
The project fee for project
costs from $50,000 to $99,999 is $500.00.
3.3 Tier II Fees - Major Projects
3.3.1 Application
Fees
A. The fee schedule below
applies to alterations, additions, and new construction with an
estimated construction cost in excess of $100,000. Project costs
shall exclude site acquisition, remediation and site preparation
costs. Applicants shall submit a construction cost estimate broken
down on a per square foot basis by land use. The Commission will
have the construction cost estimate upon which the fee is calculated,
reviewed and verified.
1. Multi-phase projects will
be considered one project, and the fee paid must reflect the total
cost of the project.
2. Total fees are not capped.
3. Development fees for
project costs less than $5,000,000 are due in full at project
application at the fee rate of 0.50%.
4. Development fees payable
for projects with a cost of $5,000,000 or greater are due in four
phases as follows.
a. Twenty-five percent (25%)
of the total fee is due at the time of application.
b. Ten percent (10%) of the
total fee shall be paid prior to issuance of a Notice of Decision.
c. Fifty percent (50%) of the
total fee must be paid in full at the time of application for the
first building permit. For phased projects, applicant may petition
the Waterfront Commission for approval to pay a prorated fee for
payment in full prior to the application for the first building
permit for each phase.
d. The final fifteen percent
(15%) of the total fee is due in full at the time of application for
the first certificate of occupancy. For phased projects, applicant
may petition the Waterfront Commission for approval to pay a prorated
fee in full prior to the application for the first certificate of
occupancy for each phase.
5. Development fee rates for
projects $5,000,000 or greater are established for project cost
ranges as defined below and are payable in phases as defined in §
3.3.1(A)(4) of this Part.
a. Fee rate for project costs
$5,000,000 to $19,999,999 is 0.50%.
b. Fee rate for project costs
$20,000,000 to $24,999,999 is 0.40%.
c. Fee rate for project costs
$25,000,000 to $29,999,999 is 0.35%.
d. Fee rate for project costs
$30,000,000 to $39,999,999 is 0.30%.
e. Fee rate for project costs
$40,000,000 to $49,999,999 is 0.25%.
f. Fee rate for project costs
$100,000,000 and greater is 0.20%.
6. Examples of Project Fees
are provided in the following table.
Project
Cost
Fee
Rate
Total
Fee
Due
at Application
Due
prior to Notice of Decision
Due
at Building Permit
Due
at Cert. of Occupancy
25%
10%
50%
15%
$100,000
to $4,999,999
0.50%
$
500 +
$500
+
$
5,000,000
0.50%
$
25,000
$
6,250
$
2,500
$
12,500
$
3,750
$
10,000,000
0.50%
$
50,000
$
12,500
$
5,000
$
25,000
$
7,500
$
15,000,000
0.50%
$
75,000
$
18,750
$
7,500
$
37,500
$
11,250
$
20,000,000
0.40%
$
80,000
$
20,000
$
8,000
$
40,000
$
12,000
$
25,000,000
0.35%
$
75,000
$
18,750
$
7,500
$
37,500
$
11,250
$
30,000,000
0.30%
$90,000
$
26,250
$
10,500
$
52,500
$
15,750
$
40,000,000
0.20%
$
80,000
$
20,000
$
8,000
$
40,000
$
12,000
$
50,000,000
0.25%
$125,000
$
31,250
$
12,500
$
62,500
$
18,750
$
75,000,000
0.25%
$187,500
$
46,875
$
18,750
$
93,750
$
28,125
$100,000,000
0.25%
$250,000
$
62,500
$
25,000
$125,000
$
37,500
$100,000,000
+
0.20%
.20%
of Project Cost
25%
of Total Fee
10%
of Total Fee
50%
of Total Fee
15%
of Total Fee
7. Additional Professional
Review Fees
a. The Waterfront Commission
may require the applicant to pay additional review fees in advance so
that the Commission may hire outside professionals to conduct review
of impact analyses submitted by the applicant and to conduct
independent reviews. The elements of an application for which the
Commission may require additional review fees shall include, but not
be limited to, the following; legal issues, drainage, traffic, noise
environmental assessments, architecture, landscape architecture, and
geotechnical sampling and testing. The amount of the additional
review fee(s) shall be based upon written cost estimates prepared by
qualified consultants based upon a written scope work prepared by the
Executive Director in consultation with Design Review Committee and
applicable City staff. The applicant shall be afforded opportunity
to review and comment on the scope of work and the proposed fees.
These review fees shall be deposited in a review escrow account
established by the Commission or, at the discretion of the Executive
Director, the applicant shall be billed for expenses incurred.
b. If any such professional
review is required by the Waterfront Commission, the Commission shall
so indicate at the Pre-Application stage of review, based upon a
recommendation of the Executive Director. The determination will be
based upon the understanding of the Commission and staff, at that
time, of the issues posed by an application. This shall not preclude
the Commission from requiring such outside professional review at a
later stage in the review process if additional information is
received which leads the commission to believe that such additional
professional review is required for an adequate consideration of the
proposal.
c. As part of the public
record, the Waterfront Commission shall indicate its intent to spend
any portion of the professional fee escrow account and shall specify
the purpose for the proposed expenditure(s). Those moneys deposited
by the applicant and not spent by the Waterfront Commission in the
course of its review shall be returned to the applicant within thirty
(30) days after the Waterfront Commission renders its final decision
on the application.
3.4 Public Entities
The following fees shall
apply for public entities only, including state and municipal
governments and excluding utilities (and not to any public/private
applicants):
3.4.1 Tier
I Minor Applications
Application fee for projects
with an estimated cost up to $99,999 shall be paid in accordance with
the fee schedule stated in § 3.2.2 of this Part.
3.4.2 Tier
II Major Projects
Projects with an estimated
cost of between $100,000 and $4,999,999 shall pay a fee at the rate
of 0.50% or $1,000.00, whichever is less.
Projects with an estimated
cost of $5,000,000 or more shall pay $2,000.00.
3.5 Other Miscellaneous Fees
A. Miscellaneous fees include
the following.
1. The fee to request an
extension of approval is $100.00 for Tier I (construction cost at or
below $100,000) and $500.00 for Tier II (construction cost above
$100,000) projects.
2. The Plan Modification fee
is $500.00 for Tier I application and $1,000.00 per Tier II
application. The Waterfront Commission reserves the right to
reconsider fees due as defined in § 3.3.1 of this Part in
accordance with the scope of plan modification. Applicant is
responsible for all peer review and hearing fees.
3. The fee for Signage Review
is $100.00 per application. Applicant shall be responsible for the
cost of peer review by the commission’s consulting architect.
4. For implementation of any
Conditions of Approval requiring inspection, applicant shall be
responsible for the cost by the commission’s consultants.
3.6 City Application Fees
A. The applicant is obligated
to pay any development permitting fees applicable to City Agencies
such as building permit, sewer, and subdivision fees.
B. No building permit or
certificate of occupancy will be issued without payment of all
applicable Waterfront Commission fees.
3.7 Tax Increment Financing (TIF)
Fees
A. Applicant shall be invoiced
for all public hearing fees paid by the Waterfront Commission
including legal notice and stenographer costs. Applicant shall be
responsible for certified mailing to property owners within the
200-foot public notice area.
B. Applicant shall be
responsible for reimbursement of all consultant fees including legal
and TIF bond review fees incurred by the Waterfront Commission.
Waterfront Commission fees are exclusive of any fees or reimbursable
costs incurred for City review.
3.7.1 Application
The TIF application fee,
payable to the East Providence Waterfront Commission, is $4,000.00
for TIF requests up to $15,000,000; $5,000.00 for TIF requests
$15,000,000 to $30,000,000; and $7,500.00 for TIF requests above
$30,000,000.
3.7.2 TIF
Amendment Fee
TIF modification or amendment
application fee, payable to the East Providence Waterfront
Commission, is $3,000.00 for requests up to $15,000,000, $4,000.00
for requests $15,000,000 to $30,000,000 and $5,000.00 for requests
above $30,000,000.