3.1 Commission Fees –
General
A. With the exception of the
initial pre-application workshop meeting, the applicant is
responsible for all design workshop costs and all costs relating to
design review and public hearings including, but not limited to
advertising, certified mail, the stenographer, legal fees, design
review, administrative costs and other direct costs including peer
review.
B. The applicant shall submit
a certified bank check with the development application payable to
the East Providence Waterfront Commission in the amount listed below.
C. All filing and application
fees are non-refundable.
3.2 TIER I Fees – Minor
Projects
This fee schedule applies to
determinations of consistency of use, hearing panel review, and
alterations, additions and new construction with an estimated
construction cost of one hundred thousand dollars ($100,000.00) or
less. Project costs shall be determined by the Executive Director but
shall exclude site acquisition, remediation, and site preparation
costs.
3.2.1 Certification of
Consistency of Use and Hearing Panel Review
The fee for a certificate of
consistency of use is one hundred dollars ($100.00).
The fee for Hearing Panel and
Waterfront Commission hearings for conditional use and deviations
for a project without alterations, additions or construction is two
hundred dollars ($200.00).
3.2.2 Alterations,
Additions and Construction
The project fee for project
costs up to five thousand dollars ($5,000.00) is fifty dollars
($50.00).
The project fee for project
costs from five thousand dollars ($5,000.00) to nine thousand nine
hundred ninety-nine dollars ($9,999.00) is one hundred dollars
($100.00).
The project fee for project
costs from ten thousand dollars ($10,000.00) to forty-nine thousand
nine hundred ninety-nine dollars ($49,999.00) is two hundred fifty
dollars ($250.00).
The project fee for project
costs from fifty thousand dollars ($50,000) to ninety-nine thousand
nine hundred ninety-nine dollars ($99,999.00) is five hundred
dollars ($500.00).
3.3 Tier II Fees – Major
Projects
3.3.1 Application Fees
A. The fee schedule below
applies to alterations, additions, and new construction with an
estimated construction cost in excess of one hundred thousand dollars
($100,000.00). Project costs shall exclude site acquisition,
remediation and site preparation costs. Applicants shall submit a
construction cost estimate broken down on a per square foot basis by
land use. The Commission will have the construction cost estimate
upon which the fee is calculated, reviewed and verified.
1. Multi-phase projects will
be considered one (1) project, and the fee paid must reflect the
total cost of the project.
2. Total fees are not capped.
3. Development fees for
project costs less than five million dollars ($5,000,000.00) are due
in full at project application at the fee rate of 0.50%.
4. Development fees payable
for projects with a cost of five million dollars ($5,000,000.00) or
greater are due in four (4) phases as follows.
a. Twenty-five percent (25%)
of the total fee is due at the time of application.
b. Ten percent (10%) of the
total fee shall be paid prior to issuance of a Notice of Decision.
c. Fifty percent (50%) of the
total fee must be paid in full at the time of application for the
first (1 st ) building permit. For phased projects,
applicant may petition the Waterfront Commission for approval to pay
a pro-rated fee for payment in full prior to the application for the
first (1 st ) building permit for each phase.
d. The final fifteen percent
(15%) of the total fee is due in full at the time of application for
the first (1 st ) certificate of occupancy. For phased
projects, applicant may petition the Waterfront Commission for
approval to pay a pro-rated fee in full prior to the application for
the first (1 st ) certificate of occupancy for each phase.
5. Development fee rates for
projects five million dollars ($5,000,000.00) or greater are
established for project cost ranges as defined below and are payable
in phases as defined in § 3.3.1(A)(4) of this Part.
a. Fee rate for project costs
five million dollars ($5,000,000.00) to nineteen million nine hundred
ninety-nine thousand nine hundred ninety-nine dollars
($19,999,999.00) is 0.50%.
b. Fee rate for project costs
twenty million dollars ($20,000,000.00) to twenty-four million nine
hundred ninety-nine thousand nine hundred ninety-nine dollars
($24,999,999.00) is 0.40%.
c. Fee rate for project costs
twenty-five million dollars ($25,000,000.00) to twenty-nine million
nine hundred ninety-nine thousand nine hundred ninety-nine dollars
($29,999,999.00) is 0.35%.
d. Fee rate for project costs
thirty million dollars ($30,000,000.00) to thirty-nine million nine
hundred ninety-nine thousand nine hundred ninety-nine dollars
($39,999,999.00) is 0.30%.
e. Fee rate for project costs
forty million dollars ($40,000,000.00) to ninety-nine million nine
hundred ninety-nine thousand nine hundred ninety-nine dollars
($99,999,999.00) is 0.25%.
f. Fee rate for project costs
one hundred million dollars ($100,000,000.00) and greater is 0.20%.
6. Examples of Project Fees
are provided in the following table.
Project
Cost
Fee
Rate
Total
Fee
Due
at Application
Due
prior to Notice of Decision
Due
at Building Permit
Due
at Cert. of Occupancy
25%
10%
50%
15%
$100,000
to $4,999,999
0.50%
$500+
$500+
$5,000,000
0.50%
$25,000
$6,250
$2,500
$12,500
$3,750
$10,000,000
0.50%
$50,000
$12,500
$5,000
$25,000
$7,500
$15,000,000
0.50%
$75,000
$18,750
$7,500
$37,500
$11,250
$20,000,000
0.40%
$80,000
$20,000
$8,000
$40,000
$12,000
$25,000,000
0.35%
$87,500
$21,875
$8,750
$43,750
$13,125
$30,000,000
0.30%
$90,000
$22,500
$9,000
$45,000
$13,500
$40,000,000
0.25%
$100,000
$25,000
$10,000
$50,000
$15,000
$50,000,000
0.25%
$125,000
$31,250
$12,500
$62,500
$18,750
$75,000,000
0.25%
$187,500
$46,875
$18,750
$93,750
$28,125
$100,000,000
0.20%
$200,000
$50,000
$20,000
$100,000
$30,000
$100,000,000+
0.20%
0.20%
of Project Cost
25%
of Total Fee
10%
of Total Fee
50%
of Total Fee
15%
of Total Fee
7. Additional Professional
Review Fees
a. The Waterfront Commission
may require the applicant to pay additional review fees in advance so
that the Commission may hire outside professionals to conduct a
review of impact analyses submitted by the applicant and to conduct
independent reviews. The elements of an application for which the
Commission may require additional review fees shall include, but not
be limited to, the following: legal issues, drainage, traffic, noise,
environmental assessments, planning, architecture, landscape
architecture, and geotechnical sampling and testing. The amount of
the additional review fee(s) shall be based upon written cost
estimates prepared by qualified consultants based upon a written
scope of work prepared by the Executive Director in consultation with
Design Review Committee and applicable City staff. The applicant
shall be afforded opportunity to review and comment on the scope of
work and the proposed fees. These review fees shall be deposited in a
review escrow account established by the Commission or, at the
discretion of the Executive Director, the applicant shall be billed
for expenses incurred.
b. If any such professional
review is required by the Waterfront Commission, the Commission shall
so indicate at the pre-application stage of review, based upon a
recommendation of the Executive Director. The determination will be
based upon the understanding of the Commission and staff, at that
time, of the issues posed by an application. This shall not preclude
the Commission from requiring such outside professional review at a
later stage in the review process if additional information is
received which leads the Commission to believe that such additional
professional review is required for an adequate consideration of the
proposal.
c. As part of the public
record, the Waterfront Commission shall indicate its intent to spend
any portion of the professional fee escrow account and shall specify
the purpose for the proposed expenditure(s). Those moneys deposited
by the applicant and not spent by the Waterfront Commission in the
course of its review shall be returned to the applicant within thirty
(30) days after the Waterfront Commission renders its final decision
on the application.
3.4 Public Entities
The following fees shall
apply for public entities only, including State and municipal
governments and excluding utilities (and not to any public/private
applicants):
3.4.1 Tier I Minor
Applications
Application fee for projects
with an estimated cost up to ninety-nine thousand nine hundred
ninety-nine dollars ($99,999.00) shall be paid in accordance with the
fee schedule stated in § 3.2.2 of this Part.
3.4.2 Tier II Major
Projects
Projects with an estimated
cost of between one hundred thousand dollars ($100,000.00) and four
million nine hundred ninety-nine thousand nine hundred ninety-nine
dollars ($4,999,999.00) shall pay a fee at the rate of 0.50% or one
thousand dollars ($1,000.00), whichever is less.
Projects with an estimated
cost of five million dollars ($5,000,000.00) or more shall pay two
thousand dollars ($2,000.00).
3.5 Other Miscellaneous Fees
A. Miscellaneous fees include
the following:
1. The fee to request an
extension of approval is one hundred dollars ($100.00) for Tier I
(construction cost at or below one hundred thousand dollars
($100,000.00)) and five hundred dollars ($500.00) for Tier II
(construction cost above one hundred thousand dollars ($100,000.00))
projects.
2. The Plan Modification fee
is five hundred dollars ($500.00) for Tier I application and one
thousand dollars ($1,000.00) per Tier II application. The Waterfront
Commission reserves the right to reconsider fees due as defined in §
3.3.1 of this Part in accordance with the scope of plan modification.
Applicant is responsible for all peer review and hearing fees.
3. The fee for Signage Review
is one hundred dollars ($100.00) per application. Applicant shall be
responsible for the cost of peer review by the commission’s
consulting architect.
4. For implementation of any
Conditions of Approval requiring inspection, applicant shall be
responsible for the cost by the Commission’s consultants.
B. Zoning Amendment (text
and/or map change) request by a private developer to expand
Waterfront District
1. Advisory opinion to
Planning Board and City Council
a. Up to one (1) acre –
two hundred dollars ($200.00)
b. One (1) and up to five (5)
acres – five hundred dollars ($500.00)
c. Five (5) and up to twenty
(20) acres – one thousand dollars ($1,000.00)
d. Greater than twenty (20)
acres – one thousand five hundred dollars ($1,500.00)
2. Design guidelines for new
sub-district. Applicant shall be responsible for the fee for the
Commission’s architectural consultant to develop guidelines,
with staff coordination.
3.6 City Application Fees
A. The applicant is obligated
to pay any development permitting fees applicable to City Agencies
such as building permit, sewer, and subdivision fees.
B. No building permit or
certificate of occupancy will be issued without payment of all
applicable Waterfront Commission fees.
3.7 Tax Increment Financing (TIF)
Fees
A. Applicant shall be invoiced
for all public hearing fees paid by the Waterfront Commission
including legal notice and stenographer costs. Applicant shall be
responsible for certified mailing to property owners within the two
hundred foot (200’) public notice area.
B. Applicant shall be
responsible for reimbursement of all consultant fees including legal
and TIF bond review fees incurred by the Waterfront Commission.
Waterfront Commission fees are exclusive of any fees or reimbursable
costs incurred for City review.
3.7.1 Application
The TIF application fee,
payable to the East Providence Waterfront Commission, is four
thousand dollars ($4,000.00) for TIF requests up to fifteen million
dollars ($15,000,000.00); five thousand dollars ($5,000.00) for TIF
requests fifteen million dollars ($15,000,000.00) to thirty million
dollars ($30,000,000.00); and seven thousand five hundred dollars
($7,500.00) for TIF requests above thirty million dollars
($30,000,000.00).
3.7.2 TIF Amendment Fee
TIF modification or amendment
application fee, payable to the East Providence Waterfront
Commission, is three thousand dollars ($3,000.00) for requests up to
fifteen million dollars ($15,000,000.00), four thousand dollars
($4,000.00) for requests fifteen million dollars ($15,000,000.00) to
thirty million dollars ($30,000,000.00) and five thousand dollars
($5,000.00) for requests above thirty million dollars
($30,000,000.00).