ARSD 61:08:09:07

ARSD 61:08:09:07. Internal inspection -- Openings

Last amended: 1997Year: 2026Length: 38 wordsOfficial source

Cite as S.D. Admin. R. 61:08:09:07

The inspector shall examine all openings into a boiler for evidence of defects. If possible, the openings for water glass connections, safety valves, steam gauges, blowoff valves, and fusible soft plugs must be inspected during each internal inspection.
ARSD 61:08:09:07: ARSD 61:08:09:07. Internal inspection -- Openings | Justis AI