ARSD 61:08:09:19. Hydrostatic pretest -- Steam outlet requirements
Cite as S.D. Admin. R. 61:08:09:19
Each threaded steam outlet from a power boiler, except to the water column, the fusible soft plug and the safety valve connections, must be fitted with a stop valve located as close as practicable to the boiler. Schedule 80 pipe must be used between the boiler and the first stop valve. If a globe valve is used, the inlet pressure must be under the disk of the valve.