ARSD 61:08:09:20

ARSD 61:08:09:20. Hydrostatic pretest -- Blowoff valve requirements

Last amended: 1997Year: 2026Length: 36 wordsOfficial source

Cite as S.D. Admin. R. 61:08:09:20

Each locomotive and vertical-type boiler must have a blowoff pipe in direct connection with the lowest water space practicable. The pipe must be fitted with a stop valve and run full size without reducers or bushings.
ARSD 61:08:09:20: ARSD 61:08:09:20. Hydrostatic pretest -- Blowoff valve requirements | Justis AI