ARSD 61:08:09:21

ARSD 61:08:09:21. Hydrostatic pretest -- Feed water pipe requirements

Last amended: 1997Year: 2026Length: 42 wordsOfficial source

Cite as S.D. Admin. R. 61:08:09:21

The feed water pipe of a boiler must be provided with a check valve; however, there must be a stop valve between the boiler and the check valve. Both of those valves must be located as close as practicable to the boiler.
ARSD 61:08:09:21: ARSD 61:08:09:21. Hydrostatic pretest -- Feed water pipe requirements | Justis AI