ARSD 61:08:09:22
ARSD 61:08:09:22. Hydrostatic pretest -- Feed water supply
Cite as S.D. Admin. R. 61:08:09:22
Each steam boiler with a grate area of more than six square feet must have two means of feeding water into the boiler.
ARSD 61:08:09:22
Cite as S.D. Admin. R. 61:08:09:22