1680-07-01-.24
Fees
Cite as Tenn. Comp. R. & Regs. 1680-07-01-.24
The TDOT Permit Office shall charge fees for granting special permits in accordance with the following
schedules; provided, however, that the fees for permits to move mobile homes, manufactured homes,
portable modular units or house trailers are separately identified in Rule 1680-07-01-.15.
(1)
Excessive Width:
(a)
Not more than fourteen feet (14’): $20.00;
(b)
Over fourteen feet (14’) but not
more than sixteen feet (16’): $30.00;
(c)
Over sixteen feet (16’):
$30.00 plus $5.00 for each additional foot
or fraction thereof greater than sixteen
feet (16’), except as otherwise provided in
subparagraph (d);
(d)
For houseboats over seventeen feet (17’): $2,500 plus $100 for each additional inch
or fraction thereof greater than seventeen
feet (17’).
(2)
Excessive Height or Length:
$20.00.
(3)
Excessive Weight:
(a)
General:
$20.00 plus six cents ($.06) per ton mile.
(b)
Towing vehicles (in accordance with Rule 1680-07-01-.19):
1.
Excess weight up to 165,000 pounds: $20.00 plus six cents ($.06) per ton mile.
2.
Excess weight over 165,000 pounds: Twelve cents ($.12) per ton mile.
(4)
Evaluation of Bridges and Similar Structures:
The TDOT Structures Division shall, as it deems necessary, evaluate the capacity of bridges
or similar structures to carry the proposed movement of an overweight or overdimensional
load along a particular route. The Department shall charge the requestor for this evaluation
each time a different route is proposed, as follows:
(a)
Movements weighing over 165,000 pounds but not more than 250,000 pounds: $100.
OVERWEIGHT AND OVERDIMENSIONAL MOVEMENTS
CHAPTER 1680-07-01
ON TENNESSEE HIGHWAYS
(b)
Movements weighing over 250,000 pounds but not more than 500,000 pounds: $300.
(c)
Movements weighing over 500,000 pounds:
Actual cost.
(5)
Annual Permits:
(a)
Except as otherwise provided in these rules, a permit shall be available on an annual
basis for each specific vehicle to be used for transporting overdimensional or
overweight loads, or both, as follows:
1.
For vehicles transporting loads up to but not exceeding thirteen feet ten inches
(13’10”) in height, ninety feet (90’) in length, or twelve feet six inches (12’6”) in
width:
$100.
Provided, however, that vehicles transporting loads up to but not exceeding
thirteen feet six inches (13’6”) in width may obtain an annual permit upon the
condition that such overwidth movements shall be accompanied by an escort
vehicle as required in Rule 1680-07-01-.06.
2.
For vehicles transporting loads with excess weights up to but not exceeding
100,000 pounds:
$750.
3.
For vehicles transporting loads with excess weights over 100,000 pounds but not
exceeding 120,000 pounds:
$1,500.
4.
For vehicles transporting loads with excess weights over 120,000 pounds but not
exceeding 140,000 pounds:
$2,250.
5.
For vehicles transporting loads with excess weights over 140,000 pounds but not
exceeding 155,000 pounds:
$3,000.
6.
For vehicles transporting loads with excess weights over 155,000 pounds but not
exceeding 165,000 pounds:
$3,500.
7.
Vehicles transporting loads that are both overdimensional and overweight shall
be charged a separate annual fee for both the overdimensional loads, as
provided in Part 1. of this subparagraph, and the overweight loads, as provided in
Parts 2.-6. of this subparagraph.
8.
Individual owners of overdimensional boats used strictly for non-commercial
pleasure may obtain annual permits for double the amount of the regular fee for a
single trip permit for the particular movement, as described in Paragraphs (1) and
(2) of this rule.
9.
Annual permits are available for manufactured roof trusses exceeding twelve feet
six inches (12’6”), but not to exceed fourteen feet (14’) wide, for a fee of $500.
10.
Annual permits are available for sealed containerized cargo units (not to exceed
100,000 pounds) for a fee of $750.
11.
Subject to the conditions set forth in Rule 1680-07-01-.08, annual permits are
available for the movement of a single motor vehicle that is used exclusively to
transport seed cotton modules for a fee of $100.
12,
Subject to the conditions set forth in Rule 1680-07-01-.19, annual permits are
available for the movement of a towing vehicle, and the movement of a towing
OVERWEIGHT AND OVERDIMENSIONAL MOVEMENTS
CHAPTER 1680-07-01
ON TENNESSEE HIGHWAYS
vehicle and towed vehicle in combination, that exceeds any of the size and weight
limits described in Paragraphs (4) and (5) of Rule 1680-07-01-.19 for a fee of
$500.
(b)
Except as otherwise authorized in these rules, no annual permit shall be available for
any vehicle transporting loads with weights exceeding one hundred sixty-five thousand
pounds (165,000 lbs.) or dimensions exceeding thirteen feet ten inches (13’10”) in
height, ninety feet (90’) in length, or thirteen feet six inches (13’6”) in width, and any
such vehicle shall be required to obtain a single trip special permit subject to the fee or
fees for excessive width, height, length, or weight as set forth in Paragraphs (1) through
(3) of this rule and the fees for evaluation of bridges and similar structures as set forth
in Paragraph (4) of this rule; provided, however, that a vehicle holding an annual permit
for excessive weight under Parts 2.-6. of Subparagraph (5)(a) may supplement that
annual permit by obtaining a single trip permit allowing for the movement of a load with
excessive width, height, or length not previously covered by an annual permit under
Part 1. of Subparagraph (5)(a).
(c)
Notwithstanding any vehicle movement authorized under an annual permit as provided
in this Paragraph (5), no such vehicle shall be authorized to exceed any vehicle weight
limit or limits posted on any bridge or highway by the public official having jurisdiction
over such bridge or highway.
(6)
Multi-State Permitting
A permit for movement through more than one state may be obtained by application
submitted by phone or facsimile through a qualified Multi-State Permit Agent. All requests
must be ordered with a twenty-four hour (24-hr.) lead time to coordinate all states’ effective
dates and times, and conform to the guidelines as represented in the Southeastern
Association of State Highway and Transportation Officials (SASHTO) Agreement in the Multi
State Permitting Manual.
(7)
Authorized Vendor Stations
Permits may be received and paid for through the various authorized vendor stations listed on
the TDOT Permit Office’s web site at http://www.tn.gov/tdot/article/central-services-oversize-
overweight-permit-agencies.
(8)
Payment and Refunding of Permit Fees
An applicant for a special permit, including single-trip permits and annual permits, may make
payment to the TDOT Permits Office by any of the following means, if acceptable to the
TDOT Permits Office:
(a)
Personal, business, or cashier’s check;
(b)
Credit card (subject to a transaction surcharge); or
(c)
From an escrow account established with TDOT as follows:
1.
The holder of the escrow account shall enter into a contract with TDOT in a form
acceptable to TDOT;
2.
The escrow account may be funded by means of a personal, business, or
cashier’s check;
OVERWEIGHT AND OVERDIMENSIONAL MOVEMENTS
CHAPTER 1680-07-01
ON TENNESSEE HIGHWAYS
3.
In accordance with the contract, a minimum balance shall be maintained in the
escrow account in an amount sufficient to support ongoing operations for one
month; and
4.
Any funds needed to cover the cost of a special permit shall be submitted to the
TDOT Finance Division at least five (5) business days prior to the issuance of the
permit.
(d)
No single trip or annual permit fee will be refunded after issuance of the permit;
provided, however, if a single trip permit for excessive weight is cancelled by the
permittee prior to the beginning date of the permit and before the permitted movement
actually occurs, the ton mile portion of the fee shall be refunded or credited to the
permittee if another permit is issued in place of the cancelled permit for the same
movement.
(9)
Notwithstanding any other provision of this rule, no fee shall be charged for the issuance or
renewal of a special permit to any retail electric service owned by a municipality or electric
cooperative corporation, or to any telephone company or any of its contractors when they are
moving utility poles doing work for such utilities. Upon compliance with the appropriate rules
and regulations, such electric services, telephone companies, and their contractors, when
they are moving utility poles, may be issued special permits for stated periods not exceeding
one (1) year.
(10) Notwithstanding any other provision of this rule, no fee shall be charged for the issuance of a
special permit for movements conducted by a branch of the United States armed services or
by any Federal agency exempt from the payment of fees under Federal law.