0800-03-03-.05
Inspection Requirements
Cite as Tenn. Comp. R. & Regs. 0800-03-03-.05
(1)
Notification of Inspection.
(a)
Certificate inspections, as required, shall be carried out no more than two (2) months
prior to the expiration date of the certificate or within the two (2) month period following
the expiration date at a time mutually agreeable to the inspector and owner or user.
(b)
External inspections may be performed by the inspector during reasonable hours and
without prior notification.
(c)
When, as a result of external inspection or determination by other objective means, it is
the inspector’s opinion that continued operation of the boiler or pressure vessel
constitutes a danger to life or property, the inspector may order an internal inspection
or an appropriate pressure test, or both, to evaluate conditions. In such instances, the
owner or user shall prepare the boiler or pressure vessel for such inspections or tests
as the inspector designates.
(2)
Frequency of Inspections. All boilers and pressure vessels subject to inspection under the Act
shall be inspected in accordance with the requirements of T.C.A. § 68-122-110.
(3)
Preparation for Inspection. The owner or user shall prepare each boiler or pressure vessel for
inspection on the date assigned by the inspector. Whenever necessary, the owner or user
shall prepare for and apply a hydrostatic or pressure test on the inspection date. The date of
the inspection shall not be less than seven (7) days after the date of notification.
(a)
The owner or user shall prepare a boiler for internal inspection in the following manner:
1.
Draw off water and wash the boiler thoroughly.
2.
Remove manhole and handhole plates, washout plugs and inspection plugs in
water column connections (as required by the inspector). Cool and clean the
furnace and combustion chambers.
3.
Remove all grates of internally fired boilers.
4.
Remove insulation or brickwork (as required by the inspector) in order to
determine the condition of the boiler, headers, furnace, supports or other parts.
BOILER INSPECTIONS
CHAPTER 0800-03-03
5.
Remove the pressure gauge for testing (as required by the inspector).
6.
Prevent any leakage of steam or hot water into the boiler by disconnecting the
pipe or valve at the most convenient point, or any other appropriate means
approved by the inspector.
7.
Before opening the manhole or handhole covers and entering any parts of the
steam-generating unit connected to a common header with other boilers, close,
tag and (preferably) padlock the steam-stop valves; and open drain valves or
cocks between the two (2) valves. After draining the boiler, close, tag, and
(preferably) padlock the blowoff valves. Disconnect blowoff lines (where
practicable) between pressure parts and valves. Open all drains and vent lines.
(b)
The owner or user shall prepare a pressure vessel for inspection to the extent deemed
necessary by the inspector and in accordance with the applicable procedures outlined
in subparagraph (a) of this rule.
(c)
No employee or inspector shall be permitted to enter a boiler drum or pressure vessel
until the plant inspector or supervisor and the person entering the pressure vessel have
confirmed that all stop valves on inlet and outlet piping (not vented to atmosphere)
have been closed and tagged. When not valved, the piping shall be disconnected or
blanked. In addition, plant personnel shall make appropriate tests to assure that there
is no oxygen deficiency or hazardous or toxic gases in the drums or pressure vessels
to be entered by the inspector. The oxygen content of the breathable atmosphere shall
be between nineteen point five percent (19.5%) and twenty-three point five percent
(23.5%). See NBIC, Part 2, Section 1.4.1.
(4)
Boilers and Pressure Vessels Improperly Prepared for Inspection. The inspector may decline
to conduct an inspection or test, and withhold or suspend the inspection certificate, if the
owner or user:
(a)
Fails to properly prepare a boiler or pressure vessel for inspection; or
(b)
Fails to comply with the requirements of this Chapter pertaining to pressure testing.
(5)
External Inspection Disclosure of Defective Conditions.
(a)
If, upon an external inspection, there is evidence of a leak or crack, sufficient covering
of the boiler or pressure vessel shall be removed to permit the inspector to determine
satisfactorily the safety of the boiler or pressure vessel. If the covering cannot be
removed at that time, the inspector may order the operation of the boiler or pressure
vessel stopped until the covering can be removed and proper examination made. The
Chief Inspector or Chief Inspector’s Designee shall be notified immediately.
(b)
Jacketed. If a boiler or pressure vessel is jacketed so that the longitudinal seams of
shells, drums, or domes cannot be seen, the owner or user shall remove sufficient
jacketing, setting wall, or other form of casting of housing to permit reasonable
inspection of the seams and other areas necessary to determine the condition and
safety of the boiler or pressure vessel, provided such information cannot be determined
by other means.
(c)
Lap Seam Crack. A boiler or pressure vessel shall be immediately discontinued from
use if a lap seam crack is discovered along a longitudinal riveted joint of the shell or
drum. Patching shall be prohibited. (A “lap seam crack” is a crack found in lap seams,
BOILER INSPECTIONS
CHAPTER 0800-03-03
extending parallel to the longitudinal joint and located either between or adjacent to
rivet holes.)
(6)
Special Inspectors - Notification of Unsafe Boilers and Pressure Vessels.
(a)
If a Special Inspector, upon first inspection of a new risk, finds that a boiler or pressure
vessel, or any appurtenance thereof, is in such condition that his company would
refuse insurance, the inspector shall immediately notify the Chief Inspector or Chief
Inspector’s Designee and submit a report about the defects.
(b)
If, upon inspection, a Special Inspector finds a boiler or pressure vessel to be unsafe
for further operation, he shall promptly notify the owner or user and state what repairs
or other corrective measures are required to bring the boiler or pressure vessel into
compliance with this Chapter. Unless the owner or user makes such repairs or adopts
other corrective measures promptly, the Special Inspector shall immediately notify the
Chief Inspector or Chief Inspector’s Designee. Until such corrections have been made,
no further operation of the boiler or pressure vessel involved shall be permitted. If a
certificate of inspection is required and is in force, it shall be suspended by the Chief
Inspector or Chief Inspector’s Designee. When a reinspection establishes that the
boiler or pressure vessel is safe to operate, the Chief Inspector or Chief Inspector’s
Designee shall be notified. At that time, a certificate of inspection (where applicable)
may be issued.
(c)
If a Special Inspector, while making required inspections, becomes aware of any other
boiler or pressure vessel on the premises which are not registered in accordance with
applicable law, he shall report this information to the owner or user of the boiler or
pressure vessel and to the Chief Inspector or Chief Inspector’s Designee within thirty
(30) days.
(7)
Condemned Boilers and Pressure Vessels. The Chief Inspector or Chief Inspector’s
Designee or a Deputy Inspector shall stamp on any boiler or pressure vessel declared unfit
for further service the letters “XXX” on either side of the State number. Such stamping (XXX
00 XXX) shall designate a condemned boiler or pressure vessel.
(8)
Pressure Tests.
(a)
A pressure test, when applied to boiler or pressure vessels, shall not exceed one and
one half (1½) times the maximum allowable working pressure. The pressure shall be
under proper control so that in no case shall the required test pressure exceed that
which is allowed by the applicable ASME Code of Construction.
(b)
During a pressure test, the safety valve or valves shall be removed, or each valve disc
shall be held to its seat by means of a testing clamp (not by screwing down the
compression screw upon the spring). A plug device designed for the purpose may be
used.
(c)
The temperatures of the water used to apply a pressure test shall not be less than 70°F
and the temperature during inspection shall not exceed 120°F.
(d)
When a pressure test is applied to determine tightness, the pressure shall be equal to
the normal operating pressure, but need not exceed the release pressure of the safety
valve having the lowest release setting.
(e)
When the contents of the vessel prohibit contamination by any other medium or when a
pressure test is not possible, other testing media may be used provided the
precautionary requirements of the applicable section of the NBIC are followed.
BOILER INSPECTIONS
CHAPTER 0800-03-03
(9)
Notification of an Incident or Accident. The owner or user shall promptly submit to the Chief
Inspector or Chief Inspector’s Designee a detailed report of any incident or accident that
occurs to a boiler or pressure vessel. In the event of a personal injury, incident, accident, or
explosion, the owner or user shall immediately give notice to the office of the Chief Inspector
or Chief Inspector’s Designee. Neither the boiler or pressure vessel, nor any parts thereof,
shall be removed or disturbed without the permission of the Chief Inspector or Chief
Inspector’s Designee, except for the purpose of saving human life or limiting consequential
damage.
(10) Inspection Reports.
(a)
Deputy and Special Inspectors shall submit to the Chief Inspector or Chief Inspector’s
Designee on a form approved by the Board, an initial inspection report for each boiler
and pressure vessel subject to inspection in this State. Complete data shall be
submitted on a form approved by the Board for each nonstandard boiler or pressure
vessel.
(b)
Deputy and Special Inspectors shall submit to the Chief Inspector or Chief Inspector’s
Designee on a form approved by the Board, reinspection reports of subsequent
inspections of both standard and nonstandard boilers and pressure vessels.
(c)
Owner-User
Inspection
Agencies
shall
submit
reports
in
accordance
with
subparagraphs (a) and (b) of this rule. Said reports shall be filed in accordance with
Rule 0800-03-03-.06(2).
(d)
Inspection reports required by subparagraphs (a), (b), and (c) of this rule shall be
submitted within thirty (30) days after the date of inspection.