Utah ยท Regulations
R649-9 โ Exploration and Production Recycling Facilities
15 sections
15 sections
- R649-9-1R649-9-1. Introduction
- R649-9-2R649-9-2. General E and P Recycling Facility Management
- R649-9-3R649-9-3. General Permit and Application Requirements for E and P Recycling Facilities
- R649-9-4R649-9-4. Specific Permit, Application, and Operation Requirements Applicable to Long Term Produced Water Recycling Pond Facilities
- R649-9-5R649-9-5. Specific Permit, Application and Operating Requirements Applicable to Temporary Produced Water Recycling Tank Facilities
- R649-9-6R649-9-6. Specific Permit, Application and Operation Requirements Applicable to Waste Crude Oil Treatment Facilities
- R649-9-7R649-9-7. Specific Permit, Application and Operation Requirements Applicable to Other Potential E and P Product Recycling Facility Requirements
- R649-9-8R649-9-8. Noticing of E and P Recycling Facilities
- R649-9-9R649-9-9. Bonding of E and P Recycling Facilities
- R649-9-9aR649-9-9a. Forfeiture of Performance Bonds
- R649-9-10R649-9-10. Permit and Renewal Approval, Denial, Revocation, Suspension, Modification or Transfer
- R649-9-11R649-9-11. General Construction and Inspection Requirements for E and P Recycling Facilities
- R649-9-12R649-9-12. Reporting and Recordkeeping Requirements for E and P Recycling Facilities
- R649-9-13R649-9-13. Closure and Post Closure of E and P Recycling Facilities
- R649-9-14R649-9-14. Variances from Requirements and Standards