Chapter 173-240 — SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION OF WASTEWATER FACILITIES
22 sections
22 sections
- WAC 173-240-010WAC 173-240-010. Purpose and scope
- WAC 173-240-020WAC 173-240-020. Definitions
- WAC 173-240-030WAC 173-240-030. Submission of plans and reports
- WAC 173-240-035WAC 173-240-035. Restrictions—Subsurface disposal systems
- WAC 173-240-040WAC 173-240-040. Review standards
- WAC 173-240-050WAC 173-240-050. General sewer plan
- WAC 173-240-060WAC 173-240-060. Engineering report
- WAC 173-240-070WAC 173-240-070. Plans and specifications
- WAC 173-240-075WAC 173-240-075. Construction quality assurance plan
- WAC 173-240-080WAC 173-240-080. Operation and maintenance manual
- WAC 173-240-090WAC 173-240-090. Declaration of construction completion
- WAC 173-240-095WAC 173-240-095. Form—Declaration of construction of water pollution control facilities
- WAC 173-240-100WAC 173-240-100. Requirement for certified operator
- WAC 173-240-104WAC 173-240-104. Ownership and operation and maintenance
- WAC 173-240-110WAC 173-240-110. Submission of plans and reports
- WAC 173-240-120WAC 173-240-120. Review standards
- WAC 173-240-130WAC 173-240-130. Engineering report
- WAC 173-240-140WAC 173-240-140. Plans and specifications
- WAC 173-240-150WAC 173-240-150. Operation and maintenance manual
- WAC 173-240-160WAC 173-240-160. Requirement for professional engineer
- WAC 173-240-170WAC 173-240-170. Right of inspection
- WAC 173-240-180WAC 173-240-180. Approval of construction changes