Washington · Regulations
Chapter 173-245 — SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION AND OPERATION OF COMBINED SEWER OVERFLOW REDUCTION FACILITIES
13 sections
13 sections
- WAC 173-245-010WAC 173-245-010. Purpose and scope
- WAC 173-245-015WAC 173-245-015. General requirements
- WAC 173-245-020WAC 173-245-020. Definitions
- WAC 173-245-030WAC 173-245-030. Submission of plans
- WAC 173-245-040WAC 173-245-040. CSO reduction plan
- WAC 173-245-050WAC 173-245-050. Plans and specifications
- WAC 173-245-055WAC 173-245-055. Construction quality assurance plan
- WAC 173-245-060WAC 173-245-060. Operation and maintenance manual
- WAC 173-245-070WAC 173-245-070. Declaration of construction completion
- WAC 173-245-075WAC 173-245-075. Form—Declaration of construction of water pollution control facilities
- WAC 173-245-080WAC 173-245-080. Requirement for certified operator
- WAC 173-245-084WAC 173-245-084. Ownership and operation and maintenance
- WAC 173-245-090WAC 173-245-090. Schedule updates—Monitoring—Reporting