WAC 296-104-105

WAC 296-104-105. Inspection—How much time is required for notification of an internal inspection?

Last amended: 2009Year: 2026Length: 41 wordsOfficial source
Seven days will be considered sufficient notification. The owner or user shall prepare each boiler and unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic pressure test whenever necessary on the date specified by the inspector.
WAC 296-104-105: WAC 296-104-105. Inspection—How much time is required for notification of an internal inspection? | Justis AI