- WAC 296-104-001WAC 296-104-001. Administration—To what do these rules apply?
- WAC 296-104-010WAC 296-104-010. Administration — What are the definitions of terms used in this chapter?
- WAC 296-104-015WAC 296-104-015. Administration — When and where are the board meetings held?
- WAC 296-104-017WAC 296-104-017. Administration—How are rules affected if other rules are invalidated?
- WAC 296-104-018WAC 296-104-018. Administration—Interpretation of rules—Appeal rights—Hearings
- WAC 296-104-019WAC 296-104-019. Administration—How are Washington state specials and extensions of inspection frequencies for boilers and pressure vessels obtained?
- WAC 296-104-020WAC 296-104-020. Administration — What are the filing requirements for boilers and unfired pressure vessels before their installation/reinstallation?
- WAC 296-104-021WAC 296-104-021. Administration—What is the registration requirement for new standard boilers and unfired pressure vessels?
- WAC 296-104-025WAC 296-104-025. Administration—What are the notification and reporting requirements following an accident involving a boiler or pressure vessel?
- WAC 296-104-030WAC 296-104-030. Administration—What is the penalty for operation of unsafe boilers or unfired pressure vessels?
- WAC 296-104-035WAC 296-104-035. Administration—What are conflicts of interest for inspectors?
- WAC 296-104-040WAC 296-104-040. Administration—When should inspectors submit inspection reports and on what forms?
- WAC 296-104-045WAC 296-104-045. Administration—What are the insurance companies' responsibilities?
- WAC 296-104-050WAC 296-104-050. Administration — What are the requirements for a boiler inspector?
- WAC 296-104-060WAC 296-104-060. Administration—When shall an inspectors' Washington state commission be issued, suspended, or revoked?
- WAC 296-104-065WAC 296-104-065. Administration — How should an inspector obtain a Washington state commission?
- WAC 296-104-100WAC 296-104-100. Inspection — How often must boilers and unfired pressure vessels be inspected?
- WAC 296-104-102WAC 296-104-102. Inspection — What are the standards for in-service inspection?
- WAC 296-104-105WAC 296-104-105. Inspection—How much time is required for notification of an internal inspection?
- WAC 296-104-110WAC 296-104-110. Inspection—What will be done when boilers or unfired pressure vessels are deemed unsafe or defective?
- WAC 296-104-115WAC 296-104-115. Inspection—What will be done when defective conditions are concealed by covering?
- WAC 296-104-125WAC 296-104-125. Inspection—What are the requirements for obtaining a certificate of inspection?
- WAC 296-104-130WAC 296-104-130. Inspection—When are inspection certificates valid?
- WAC 296-104-135WAC 296-104-135. Inspection—What are the requirements for restamping of boilers and unfired pressure vessels?
- WAC 296-104-140WAC 296-104-140. Inspection—How should a state number be assigned and applied?
- WAC 296-104-145WAC 296-104-145. Inspection—How are groups of vessels operating as a single unit classified?
- WAC 296-104-150WAC 296-104-150. Inspection—How are unfired steam boilers classified?
- WAC 296-104-151WAC 296-104-151. Inspection—What are the requirements for rental boilers?
- WAC 296-104-155WAC 296-104-155. Inspection—What preparations are necessary prior to internal inspections?
- WAC 296-104-160WAC 296-104-160. Inspection—What happens if a boiler or unfired pressure vessel is improperly prepared for inspection?
- WAC 296-104-165WAC 296-104-165. Inspection—When should coverings be removed for inspection?
- WAC 296-104-170WAC 296-104-170. Inspection—When are shop inspections required?
- WAC 296-104-180WAC 296-104-180. Inspection—How are radioactive systems inspected?
- WAC 296-104-200WAC 296-104-200. Construction — What are the standards for new construction?
- WAC 296-104-205WAC 296-104-205. Construction—What are the requirements for nonstandard new construction?
- WAC 296-104-210WAC 296-104-210. Construction—What are the requirements for construction of boilers and unfired pressure vessels of special design?
- WAC 296-104-215WAC 296-104-215. Construction—What are the requirements to use nonstandard boilers and unfired pressure vessels other than historical boilers and pressure vessels?
- WAC 296-104-220WAC 296-104-220. Construction—What are the requirements to use nonstandard second hand boilers and unfired pressure vessels, other than historical boilers and pressure vessels?
- WAC 296-104-226WAC 296-104-226. Construction—What are the requirements to use historical boilers and pressure vessels?
- WAC 296-104-245WAC 296-104-245. Construction—Combustible fluid heaters
- WAC 296-104-251WAC 296-104-251. Installation — What are the standards for installation for nonnuclear boiler and pressure vessels?
- WAC 296-104-255WAC 296-104-255. Installation — What are the required clearances for boilers?
- WAC 296-104-260WAC 296-104-260. Installation — What are the required clearances for unfired pressure vessels?
- WAC 296-104-265WAC 296-104-265. Installation—What are the requirements for unfired pressure vessels installed underground?
- WAC 296-104-271WAC 296-104-271. Installation—How does an owner, user, or installer obtain a variance from clearances?
- WAC 296-104-273WAC 296-104-273. Installation—What inspections are required for reinstalled standard boilers or unfired pressure vessels?
- WAC 296-104-295WAC 296-104-295. Installation—What are the requirements for an explosion door?
- WAC 296-104-300WAC 296-104-300. Installation—What control and limit devices are required on automatically fired boilers prior to June 1989?
- WAC 296-104-301WAC 296-104-301. Installation — What control and limit devices are required on automatically fired power boilers after June 1989?
- WAC 296-104-302WAC 296-104-302. Installation — What control and limit devices are required on automatically fired hot water heating, hot water supply boilers, coil type hot water heating boilers, low pressure steam boilers, and HLW potable water heaters after June 1989?
- WAC 296-104-303WAC 296-104-303. Installation — What fuel controls are required on automatically fired boilers after December 1998?
- WAC 296-104-307WAC 296-104-307. Installation—When are platforms around boilers required?
- WAC 296-104-316WAC 296-104-316. Installation—What safety pressure relief devices are required on boilers and unfired pressure vessels?
- WAC 296-104-320WAC 296-104-320. Installation — Where should the discharge from safety pressure relief devices, blow offs and drains be directed?
- WAC 296-104-325WAC 296-104-325. Installation—What are the requirements for boiler and unfired pressure vessel supports?
- WAC 296-104-405WAC 296-104-405. Existing installation—How can the maximum allowable working pressure be established for nonstandard boilers or unfired pressure vessels?
- WAC 296-104-502WAC 296-104-502. Repairs — What is the standard for nonnuclear repairs and alterations?
- WAC 296-104-503WAC 296-104-503. Repairs — What are the requirements for nonnuclear boilers and unfired pressure vessel repairs and alterations?
- WAC 296-104-510WAC 296-104-510. Repairs—When a lap seam crack is discovered along a riveted longitudinal joint on a boiler or unfired pressure vessel, what action is required and what repairs are allowed?
- WAC 296-104-515WAC 296-104-515. Repairs—Do riveted repairs to boilers and unfired pressure vessels require prior approval?
- WAC 296-104-520WAC 296-104-520. Repairs—What are the requirements for repair of nonnuclear safety devices?
- WAC 296-104-535WAC 296-104-535. Repairs—What are the requirements for nuclear repairs/replacement?
- WAC 296-104-540WAC 296-104-540. Repairs—What are the requirements for nuclear repairs of safety devices?
- WAC 296-104-700WAC 296-104-700. What are the inspection fees — Examination fees — Certificate fees — Expenses?
- WAC 296-104-701WAC 296-104-701. What are the civil penalties?