WAC 296-104-273

WAC 296-104-273. Installation—What inspections are required for reinstalled standard boilers or unfired pressure vessels?

Last amended: 2009Year: 2026Length: 168 wordsOfficial source
When a stationary standard boiler or unfired pressure vessel is moved and reinstalled it must be inspected and documented on the inspection report by an inspector. The following will be required: (1) An installation permit must be submitted in accordance with WAC 296-104-020 . (2) The fittings and appurtenances must comply with the latest codes adopted in WAC 296-104-200 . For automatically fired boilers, fuel controls and other limit devices as listed in WAC 296-104-303 shall be provided. (3) For any boiler or unfired pressure vessel not currently registered with the department, the following are required unless waived by the inspector: (a) A hydrostatic or pressure test as prescribed in the original code of construction. (b) An internal inspection. (c) An operational test. (d) Any repairs deemed necessary. (e) A complete history of inspection, operation and repairs/alterations. (f) Additional examination or nondestructive testing. (g) A written evaluation by a professional engineer knowledgeable with boilers and pressure vessels, an ASME certificate holder, or a National Board R certificate holder.
WAC 296-104-273: WAC 296-104-273. Installation—What inspections are required for reinstalled standard boilers or unfired pressure vessels? | Justis AI