(1) Test to a design must be witnessed by a professional engineer or architect licensed in Washington or by a department employee. (2) Test reports must contain the following items: (a) A description of the methods or standards that applied to the test; (b) Drawings and a description of the item tested; (c) A description of the test set-up; (d) The procedure used to verify the correct load; (e) The procedure used to measure each condition; (f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested; and (g) Analysis, comments, and conclusion.