WAC 388-97-3460. Preinstallation submissions for new construction

Last amended: 2008Year: 2026Length: 139 wordsOfficial source
The department of health, construction review, must receive and approve preinstallation submissions prior to installation. Preinstallation submissions may include any or all of the following: (1) Stamped shop drawings, hydraulic calculations, and equipment information sheets for fire sprinkler system(s); (2) Shop drawings, battery calculations, and equipment information sheets for fire detection and alarm systems; (3) Shop drawings and equipment information sheets for a kitchen hood and duct automatic fire extinguishing system; (4) Drawings and equipment information sheets for special egress control devices; and (5) Drawings and/or a finish schedule denoting areas to be carpeted with: (a) A coding system identifying type of carpet in each area; (b) A copy the manufacturer's specifications for each type of carpet; and (c) A copy of a testing laboratory report of the radiant panel and smoke density tests for each type of carpet.
WAC 388-97-3460: WAC 388-97-3460. Preinstallation submissions for new construction | Justis AI