25-C DCMR 705

705. ISSUANCE OF FACILITY LICENSE โ€“ REQUIRED PLAN REVIEWS AND APPROVALS

Last amended: 2017Length: 149 wordsOfficial source

Cite as D.C. Mun. Regs. tit. 25-C, ยง 705

705 ISSUANCE OF FACILITY LICENSE โ”€ REQUIRED PLAN REVIEWS AND APPROVALS 705.1 The following plans and specifications for a swimming pool, spa pool, or sauna shall be submitted to the Department of Consumer & Regulatory Affairs for review and approval as specified in this section and Subsection 706.1: (a) Proposed layout, mechanical schematics, construction materials, and finish schedules; (b) Proposed equipment types, manufacturers, model numbers, locations, dimensions, performance capacities, and installation specifications; (c) A complete set of elevations and drawings for all custom fabricated equipment; and (d) Other information that may be required before the Department of Consumer & Regulatory Affairs may approve proposed plans for the construction, or renovation, or retrofits, including approvals by other District agencies, when necessary. SOURCE: Final Rulemaking published at 64 DCR 5359 (June 9, 2017). District of Columbia Municipal Regulations Aquatic Facilities Regulations: Swimming Pools, Spa Pools, And Saunas 25-C DCMR ยง 705
25-C DCMR 705: 705. ISSUANCE OF FACILITY LICENSE โ€“ REQUIRED PLAN REVIEWS AND APPROVALS | Justis AI