Federal (United States) · Regulations
Subpart EEEE — Standards of Performance for Other Solid Waste Incineration Units
50 sections
50 sections
- 40 C.F.R. § 60.2880What does this subpart do?
- 40 C.F.R. § 60.2881When does this subpart become effective?
- 40 C.F.R. § 60.2885Does this subpart apply to my incineration unit?
- 40 C.F.R. § 60.2886What is a new incineration unit?
- 40 C.F.R. § 60.2887What combustion units are excluded from this subpart?
- 40 C.F.R. § 60.2888Are air curtain incinerators regulated under this subpart?
- 40 C.F.R. § 60.2890How are these new source performance standards structured?
- 40 C.F.R. § 60.2891Do all components of these new source performance standards apply at the same time?
- 40 C.F.R. § 60.2895What is a siting analysis?
- 40 C.F.R. § 60.2899What is a waste management plan?
- 40 C.F.R. § 60.2900When must I submit my waste management plan?
- 40 C.F.R. § 60.2901What should I include in my waste management plan?
- 40 C.F.R. § 60.2905What are the operator training and qualification requirements?
- 40 C.F.R. § 60.2907How do I obtain my operator qualification?
- 40 C.F.R. § 60.2908How do I maintain my operator qualification?
- 40 C.F.R. § 60.2909How do I renew my lapsed operator qualification?
- 40 C.F.R. § 60.2910What site-specific documentation is required?
- 40 C.F.R. § 60.2911What if all the qualified operators are temporarily not accessible?
- 40 C.F.R. § 60.2917What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
- 40 C.F.R. § 60.2922How do I conduct the initial and annual performance test?
- 40 C.F.R. § 60.2934May I conduct performance testing less often?
- 40 C.F.R. § 60.2939What continuous emission monitoring systems must I install?
- 40 C.F.R. § 60.2940How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 C.F.R. § 60.2941What is my schedule for evaluating continuous emission monitoring systems?
- 40 C.F.R. § 60.2942What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- 40 C.F.R. § 60.2943How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- 40 C.F.R. § 60.2945Is there a minimum amount of operating parameter monitoring data I must obtain?
- 40 C.F.R. § 60.2949What records must I keep?
- 40 C.F.R. § 60.2950Where and in what format must I keep my records?
- 40 C.F.R. § 60.2951What reports must I submit?
- 40 C.F.R. § 60.2952What must I submit prior to commencing construction?
- 40 C.F.R. § 60.2953What information must I submit prior to initial startup?
- 40 C.F.R. § 60.2954What information must I submit following my initial performance test?
- 40 C.F.R. § 60.2956What information must I include in my annual report?
- 40 C.F.R. § 60.2957What other reports must I submit if I have a deviation?
- 40 C.F.R. § 60.2959What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
- 40 C.F.R. § 60.2960Are there any other notifications or reports that I must submit?
- 40 C.F.R. § 60.2962Can reporting dates be changed?
- 40 C.F.R. § 60.2970What is an air curtain incinerator?
- 40 C.F.R. § 60.2971What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.2972How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.2973What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.2975What equations must I use?
- 40 C.F.R. § 60.2977What definitions must I know?
- 40 C.F.R. Table 1 to Subpart EEEE of Part 60Emission Limitations for OSWI Units That Commenced Construction on or Before August 31, 2020
- 40 C.F.R. Table 1a to Subpart EEEE of Part 60Table 1 a to Subpart EEEE of Part 60—Emission Limitations for OSWI Units With Capacities Greater Than 10 Tons per Day That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
- 40 C.F.R. Table 1b to Subpart EEEE of Part 60Table 1 b to Subpart EEEE of Part 60—Emission Limitations for OSWI Units With Capacities Less Than or Equal to 10 Tons per Day With That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
- 40 C.F.R. Table 2 to Subpart EEEE of Part 60Operating Limits for Incinerators
- 40 C.F.R. Table 3 to Subpart EEEE of Part 60Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 C.F.R. Table 4 to Subpart EEEE of Part 60Summary of Reporting Requirements