Federal (United States) · Session law
Title I
140 sections
140 sections
- Pub. L. 115-270, tit. I, subtit. A, sec. 1101SENSE OF CONGRESS REGARDING WATER RESOURCES DEVELOPMENT BILLS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1102STUDY OF THE FUTURE OF THE UNITED STATES ARMY CORPS OF ENGINEERS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1103STUDY ON ECONOMIC AND BUDGETARY ANALYSES.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1104DISSEMINATION OF INFORMATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1105NON-FEDERAL ENGAGEMENT AND REVIEW.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1106LAKE OKEECHOBEE REGULATION SCHEDULE REVIEW.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1107ACCESS TO REAL ESTATE DATA.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1108AQUATIC INVASIVE SPECIES RESEARCH.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1109HARMFUL ALGAL BLOOM TECHNOLOGY DEMONSTRATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1110BUBBLY CREEK, CHICAGO ECOSYSTEM RESTORATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1111DREDGE PILOT PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1112HURRICANE AND STORM DAMAGE PROTECTION PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1113OPERATION AND MAINTENANCE OF EXISTING INFRASTRUCTURE.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1114ASSISTANCE RELATING TO WATER SUPPLY.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1115PROPERTY ACQUISITION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1116DREDGED MATERIAL MANAGEMENT PLANS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1117INCLUSION OF PROJECT OR FACILITY IN CORPS OF ENGINEERS WORKPLAN.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1118GEOMATIC DATA.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1119LOCAL GOVERNMENT RESERVOIR PERMIT REVIEW.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1120TRANSPARENCY AND ACCOUNTABILITY IN COST SHARING FOR WATER RESOURCES DEVELOPMENT PROJECTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1121UPPER MISSOURI MAINSTEM RESERVOIR WATER WITHDRAWAL INTAKE EASEMENT REVIEW.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1122LIMITATION ON CONTRACT EXECUTION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1123CERTAIN LEVEE IMPROVEMENTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1124COST-SHARE PAYMENT FOR CERTAIN PROJECTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1125LOCKS ON ALLEGHENY RIVER.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1126PURPOSE AND NEED.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1127PRIOR PROJECT AUTHORIZATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1128MISSISSIPPI RIVER AND TRIBUTARIES PROJECT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1129INCLUSION OF TRIBAL INTERESTS IN PROJECT CONSULTATIONS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1130BENEFICIAL USE OF DREDGED MATERIAL.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1131ICE JAM PREVENTION AND MITIGATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1132REHABILITATION OF CORPS OF ENGINEERS CONSTRUCTED DAMS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1133COLUMBIA RIVER.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1134MISSOURI RIVER RESERVOIR SEDIMENT MANAGEMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1135REAUTHORIZATION OF LOCK OPERATIONS PILOT PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1136CREDIT OR REIMBURSEMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1137NON-FEDERAL IMPLEMENTATION PILOT PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1138SURPLUS WATER CONTRACTS AND WATER STORAGE AGREEMENTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1139POST-DISASTER WATERSHED ASSESSMENTS IN TERRITORIES OF THE UNITED STATES.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1140EXPEDITED CONSIDERATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1141PROJECT STUDIES SUBJECT TO INDEPENDENT PEER REVIEW.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1142FEASIBILITY OF CHICAGO SANITARY AND SHIP CANAL DISPERSAL BARRIERS PROJECT, ILLINOIS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1143ACKNOWLEDGMENT OF CREDIT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1144LEVEE SAFETY INITIATIVE REAUTHORIZATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1145FUNDING TO PROCESS PERMITS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1146RESERVOIR SEDIMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1147CLARIFICATION FOR INTEGRAL DETERMINATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1148BENEFICIAL USE OF DREDGED SEDIMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1149INCLUSION OF ALTERNATIVE MEASURES FOR AQUATIC ECOSYSTEM RESTORATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1150REGIONAL SEDIMENT MANAGEMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1151OPERATION AND MAINTENANCE OF NAVIGATION AND HYDROELECTRIC FACILITIES.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1152STUDY OF WATER RESOURCES DEVELOPMENT PROJECTS BY NON-FEDERAL INTERESTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1153CONSTRUCTION OF WATER RESOURCES DEVELOPMENT PROJECTS BY NON-FEDERAL INTERESTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1154CORPS BUDGETING; PROJECT DEAUTHORIZATIONS; COMPREHENSIVE BACKLOG REPORT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1155INDIAN TRIBES.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1156INFLATION ADJUSTMENT OF COST-SHARING PROVISIONS FOR TERRITORIES AND INDIAN TRIBES.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1157CORPS OF ENGINEERS CONTINUING AUTHORITIES PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1158HURRICANE AND STORM DAMAGE REDUCTION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1159REGIONAL COALITIONS AND HIGHER EDUCATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1160EMERGENCY RESPONSE TO NATURAL DISASTERS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1161COST AND BENEFIT FEASIBILITY ASSESSMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1162EXTENDED COMMUNITY ASSISTANCE BY THE CORPS OF ENGINEERS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1163DAM SAFETY.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1164LOCAL GOVERNMENT WATER MANAGEMENT PLANS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1165STRUCTURES AND FACILITIES CONSTRUCTED BY SECRETARY.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1166ADVANCED FUNDS FOR WATER RESOURCES DEVELOPMENT STUDIES AND PROJECTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1167COSTS IN EXCESS OF FEDERAL PARTICIPATION LIMIT.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1168DISPOSITION OF PROJECTS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1169CONTRIBUTED FUNDS FOR NON-FEDERAL RESERVOIR OPERATIONS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1170WATERCRAFT INSPECTION STATIONS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1171RESTRICTED AREAS AT CORPS OF ENGINEERS DAMS.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1172COASTAL EROSION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1173PROHIBITION ON SURPLUS WATER FEES, LAKE CUMBERLAND WATERSHED, KENTUCKY AND TENNESSEE.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1174MIDDLE RIO GRANDE PEAK FLOW RESTORATION.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1175PROHIBITION OF ADMINISTRATIVE FEES IN IMPLEMENTING ROUGH RIVER LAKE FLOWAGE EASEMENT ENCROACHMENT RESOLUTION PLAN.Enacted
- Pub. L. 115-270, tit. I, subtit. A, sec. 1176PRECONSTRUCTION ENGINEERING DESIGN DEMONSTRATION PROGRAM.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1201AUTHORIZATION OF PROPOSED FEASIBILITY STUDIES.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1202ADDITIONAL STUDIES.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1203EXPEDITED COMPLETION.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1204GAO STUDY ON BENEFIT-COST ANALYSIS REFORMS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1205HARBOR MAINTENANCE TRUST FUND REPORT.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1206IDENTIFICATION OF NONPOWERED DAMS FOR HYDROPOWER DEVELOPMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1207STUDY ON INNOVATIVE PORTS FOR OFFSHORE WIND DEVELOPMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1208INNOVATIVE MATERIALS AND ADVANCED TECHNOLOGIES REPORT.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1209STUDY AND REPORT ON EXPEDITING CERTAIN WAIVER PROCESSES.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1210REPORT ON DEBRIS REMOVAL.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1211CORPS FLOOD POLICY WITHIN URBAN AREAS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1212FEASIBILITY STUDIES FOR MITIGATION OF DAMAGE.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1213APPLICATIONS OF MILITARY LEASING AUTHORITIES.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1214COMMUNITY ENGAGEMENT.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1215TRANSPARENCY IN ADMINISTRATIVE EXPENSES.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1216ASSESSMENT OF HARBORS AND INLAND HARBORS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1217MAINTENANCE OF HIGH-RISK FLOOD CONTROL PROJECTS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1218NORTH ATLANTIC DIVISION REPORT ON HURRICANE BARRIERS AND HARBORS OF REFUGE.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1219GREAT LAKES COASTAL RESILIENCY STUDY.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1220MCMICKEN DAM, ARIZONA, AND MUDDY RIVER, MASSACHUSETTS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1221TABLE ROCK LAKE, ARKANSAS AND MISSOURI.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1222FORECAST-INFORMED RESERVOIR OPERATIONS.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1223CEDAR RIVER, IOWA.Enacted
- Pub. L. 115-270, tit. I, subtit. B, sec. 1224OLD RIVER CONTROL STRUCTURE, LOUISIANA.Enacted