35 Ill. Adm. Code 276.602
Steady-State Idle Test Equipment Calibration
Section 276
Section 276.602 Steady-State
Idle Test Equipment Calibration
All operators of steady-state
idle exhaust test gas analyzers shall comply with the following calibration and
operating procedures unless alternative procedures have been approved by the
Agency:
a) Exhaust gas analyzers shall be warmed up prior to each vehicle
inspection, zero check, span check, or calibration. Analyzers shall be
considered to be in a warmed-up condition once stabilized zero readings
(readings stabilize for one minute within ±2 percent of full scale, low range
on all 3 channels) are obtained.
b) The analyzer shall conduct a zero and span check prior to each
test. The span check shall include the HC, CO and CO
2
channels, and
the NO and O
2
channels, if present. If zero and/or span drift cause
the signal levels to move beyond the adjustment range of the analyzer, it shall
lock out from testing.
c) The system shall lock out from testing if sample flow falls
below 3 percent of full scale, or causes system response time to exceed 13
seconds to 90 percent of a step change in input, whichever is less.
d) A system leak check shall be performed within 24 hours before
the test, and may be performed in conjunction with the gas calibration
described in subsection (e)(1) of this Section. If a leak check is not
performed within 24 hours or if the analyzer fails the leak check, the analyzer
shall lock out from testing. The leak check shall be a procedure demonstrated
to effectively check the sample hose and probe for leaks and shall be performed
in accordance with good engineering practices. An error of more than +2
percent of the reading using low range span gas shall cause the analyzer to
lock out from testing and shall require repair of leaks.
e) Gas Calibration
1) Analyzers must undergo a two-point calibration within 72 hours
before each test unless changes in barometric pressure are compensated for
automatically and statistical process control demonstrates equal or better
quality control using different frequencies. Gas calibration shall be
accomplished by introducing span gas that meets the requirements of subsection
(e)(3) of this Section into the analyzer through the calibration port. If the
analyzer reads the span gas within the allowable tolerance range (i.e., the
square root sum of the squares of the span gas tolerance described in
subsection (e)(3) of this Section and the calibration tolerance, which shall be
equal to 2 percent), no adjustment of the analyzer is necessary. The gas
calibration procedure shall correct readings that exceed the allowable
tolerance range to the center of the allowable tolerance range. The pressure in
the sample cell shall be the same with the calibration gas flowing during
calibration as with the sample gas flowing during sampling. If the system is
not calibrated, or the system fails the calibration check, the analyzer shall
lock out from testing.
2) A two point gas calibration procedure shall be followed. The
span shall be accomplished at one of the following pairs of span points:
A) Low
300 – ppm
propane (HC)
1.0 – percent
CO
6.0 – percent
CO
2
1000 – ppm
nitric oxide (if equipped with NO)
High
1200 – ppm
propane (HC)
4.0 – percent
CO
12.0 – percent
CO
2
3000 – ppm
nitric oxide (if equipped with NO)
B) Low
0 – ppm
propane (HC)
0.0 – percent
CO
0.0 – percent
CO
2
0 – ppm nitric
oxide (if equipped with NO)
High
600 – ppm
propane (HC)
1.6 – percent
CO
11.0 – percent
CO
2
1200 – ppm
nitric oxide (if equipped with NO)
3) The span gases used for the gas calibration shall be traceable
to NIST standards within two percent and shall be within two percent of the
span points specified in subsection (e)(2) of this Section.
f) Other Checks
In addition to
the other periodic checks described in this Section, those described in
subsections (f)(1) and (f)(2) of this Section shall also be used to verify
system performance under the special circumstances described therein.
1) Gas Calibration
A) Each time the analyzer electronic or optical systems are
repaired or replaced, a gas calibration shall be performed prior to returning
the unit to service.
B) Multi-point calibrations shall be performed every 6 months.
The calibration curve is checked at 20 percent, 40 percent, 60 percent, and 80
percent of full scale, and must be adjusted or repaired if the specifications
in Section 276.503 are not met.
2) Leak Checks
Each time the
sample line integrity is broken, a leak check shall be performed prior to
testing.