35 Ill. Adm. Code 811.309
Leachate Treatment and Disposal Systems
Section 811
Section 811.309 Leachate
Treatment and Disposal Systems
a) Leachate must be allowed to flow freely from the drainage and
collection system. The operator is responsible for the operation of a leachate
management system designed to handle all leachate as it drains from the
collection system. The leachate management system must consist of any
combination of storage, treatment, pretreatment, and disposal options designed
and constructed in compliance with the requirements of this Section.
b) The leachate management system must consist of any combination
of multiple treatment and storage structures, to allow the management and
disposal of leachate during routine maintenance and repairs.
c) Standards for Onsite Treatment and Pretreatment
1) All onsite treatment or pretreatment systems must be
considered part of the facility.
2) The onsite treatment or pretreatment system must be designed
in accordance with the expected characteristics of the leachate. The design
may include modifications to the system necessary to accommodate changing
leachate characteristics.
3) The onsite treatment or pretreatment system must be designed
to function for the entire design period.
4) All of the facility's unit operations, tanks, ponds, lagoons
and basins must be designed and constructed with liners or containment
structures to control seepage to groundwater.
5) All treated effluent discharged to waters of the State must
meet the requirements of 35 Ill. Adm. Code 309.
6) The treatment system must be operated by an operator certified
under the requirements of 35 Ill. Adm. Code 312.
d) Standards for Leachate Storage Systems
1) Except as otherwise provided in subsection (d)(6), the
leachate storage facility must be able to store a minimum of at least five
days' worth of accumulated leachate at the maximum generation rate used in
designing the leachate drainage system in accordance with Section 811.307. The
minimum storage capacity may be built up over time and in stages, so long as
the capacity for five consecutive days of accumulated leachate is available at
any time during the design period of the facility.
2) All leachate storage tanks must be equipped with secondary
containment systems equivalent to the protection provided by a clay liner 0.61
meter (2 feet thick) having a permeability no greater than 10
-7
centimeters per second.
3) Leachate storage systems must be fabricated from material
compatible with the leachate expected to be generated and resistant to
temperature extremes.
4) The leachate storage system must not cause or contribute to a
malodor.
5) The leachate drainage and collection system must not be used
for the purpose of storing leachate.
6) A facility may have less than five days' worth of storage
capacity for accumulated leachate as required by subsection (d)(1), if the
owner or operator of the facility demonstrates that multiple treatment, storage
and disposal options in the facility's approved leachate management system
developed in accordance with subsection (b) will achieve equivalent
performance. Such options must consist of not less than one day's worth of
storage capacity for accumulated leachate plus at least two alternative means
of managing accumulated leachate through treatment or disposal, or both
treatment and disposal, each of which means is capable of treating or disposing
of all leachate generated at the maximum generation rate on a daily basis.
e) Standards for Discharge to an Offsite Treatment Works
1) Leachate may be discharged to an offsite treatment works that
meets the following requirements:
A) All discharges of effluent from the treatment works must meet
the requirements of 35 Ill. Adm. Code 309.
B) The treatment systems must be operated by an operator certified
under the requirements of 35 Ill. Adm. Code 312.
C) No more than 50 percent of the average daily influent flow can
be attributable to leachate from the solid waste disposal facility. Otherwise,
the treatment works must be considered a part of the solid waste disposal
facility.
2) The operator is responsible for securing permission from the
offsite treatment works for authority to discharge to the treatment works.
3) All discharges to a treatment works must meet the requirements
of 35 Ill. Adm. Code 310.
4) Pumps, meters, valves and monitoring stations that control and
monitor the flow of leachate from the unit and which are under the control of
the operator must be considered part of the facility and must be accessible to
the operator at all times.
5) Leachate must be allowed to flow into the sewage system at all
times; however, if access to the treatment works is restricted or anticipated
to be restricted for longer than five days, then an alternative leachate
management system must be constructed in accordance with subsection (c).
6) Where leachate is not directly discharged into a sewage
system, the operator must provide storage capacity sufficient to transfer all
leachate to an offsite treatment works. The storage system must meet the
requirements of subsection (d).
f) Standards for Leachate Recycling Systems
1) Leachate recycling systems may be utilized only at permitted
waste disposal units that meet the following requirements:
A) The unit must have a liner designed, constructed and maintained
to meet the minimum standards of Section 811.306.
B) The unit must have a leachate collection system in place and
operating in accordance with Section 811.307.
C) A gas management system, equipped with a mechanical device such
as a compressor to withdraw gas, must be implemented to control odors and
prevent migration of methane in accordance with Section 811.311.
D) The topography must be such that any accidental leachate runoff
can be controlled by ditches, berms or other equivalent control means.
2) Leachate must not be recycled during precipitation events or
in volumes large enough to cause runoff or surface seeps.
3) The amount of leachate added to the unit must not exceed the
ability of the waste and cover soils to transmit leachate flow downward. All
other leachate must be considered excess leachate, and a leachate management
system capable of disposing of all excess leachate must be available.
4) The leachate storage and distribution system must be designed
to avoid exposure of leachate to air unless aeration or functionally equivalent
devices are utilized.
5) The distribution system must be designed to allow leachate to
be evenly distributed beneath the surface over the recycle area.
6) Daily and intermediate cover must be permeable to the extent
necessary to prevent the accumulation of water and formation of perched
watertables and gas buildup; alternatively, cover must be removed prior to
additional waste placement.
7) Daily and intermediate cover must slope away from the
perimeter of the site to minimize surface discharges.
g) Leachate Monitoring
1) Representative samples of leachate must be collected from each
established leachate monitoring location in accordance with subsection (g)(5)
and tested for the parameters referenced in subsections (g)(2)(G) and (g)(3)(D).
The Agency may, by permit condition, require additional, or allow less, leachate
sampling and testing as necessary to ensure compliance with this Section and
Sections 811.312, 811.317, and 811.319.
2) Discharges of leachate from units that dispose of putrescible
wastes must be tested for the following constituents prior to treatment or
pretreatment:
A) Five day biochemical oxygen demand (BOD
5
);
B) Chemical oxygen demand;
C) Total Suspended Solids;
D) Total Iron;
E) pH;
F) Any other constituents listed in the operator's National
Pollution Discharge Elimination System (NPDES) discharge permit, pursuant to 35
Ill. Adm. Code 304, or required by a publicly owned treatment works, pursuant
to 35 Ill. Adm. Code 310; and
G) All the monitoring parameters listed in Section 811.Appendix C,
unless an alternate monitoring list has been approved by the Agency.
3) Discharges of leachate from units which dispose only chemical
wastes must be monitored for constituents determined by the characteristics of
the chemical waste to be disposed of in the unit. They must include, as a
minimum:
A) pH;
B) Total Dissolved Solids;
C) Any other constituents listed in the operator's NPDES discharge
permit, pursuant to 35 Ill. Adm. Code 304, or required by a publicly owned
treatment works, pursuant to 35 Ill. Adm. Code 310; and
D) All the monitoring parameters listed in Section 811.Appendix C,
unless an alternate monitoring list has been approved by the Agency.
4) A
network of leachate monitoring locations must be established, capable of
characterizing the leachate produced by the unit. Unless an alternate network
has been approved by the Agency, the network of leachate monitoring locations must
include:
A) At least
four leachate monitoring locations; and
B) At
least one leachate monitoring location for every 25 acres within the unit's
waste boundaries.
5) Leachate
monitoring must be performed at least once every six months and each
established leachate monitoring location must be monitored at least once every
two years.
h) Time of Operation of the Leachate Management System
1) The operator must collect and dispose of leachate for a
minimum of five years after closure and thereafter until treatment is no longer
necessary.
2) Treatment is no longer necessary if the leachate constituents
do not exceed the wastewater effluent standards in 35 Ill. Adm. Code 304.124,
304.125, and 304.126 and do not contain a BOD
5
concentration greater
than 30 mg/L for six consecutive months.
3) Leachate collection at a MSWLF unit must be continued for a
minimum period of 30 years after closure, except as otherwise provided by
subsections (h)(4) and (h)(5).
4) The Agency may reduce the leachate collection period at a
MSWLF unit upon a demonstration by the owner or operator that the reduced
period is sufficient to protect human health and environment.
5) The owner or operator of a MSWLF unit must petition the Board
for an adjusted standard in accordance with Section 811.303, if the owner or
operator seeks a reduction of the postclosure care monitoring period for all of
the following requirements:
A) Inspection and
maintenance (Section 811.111);
B) Leachate collection
(Section 811.309);
C) Gas monitoring (Section 811.310);
and
D) Groundwater monitoring
(Section 811.319).
BOARD NOTE:
Subsection (h) is derived from 40 CFR 258.61 (2017).