35 Ill. Adm. Code 845.450
Structural Stability Assessment
Section
845.450
Structural Stability Assessment
a) The
owner or operator of a CCR surface impoundment must conduct initial and annual
structural stability assessments and document whether the design, construction,
operation, and maintenance of the CCR surface impoundment is consistent with
recognized and generally accepted engineering practices for the maximum volume
of CCR and CCR wastewater that can be impounded in the CCR surface impoundment.
The assessment must, at a minimum, document whether the CCR surface impoundment
has been designed, constructed, operated, and maintained with:
1) Stable
foundations and abutments;
2) Adequate
slope protection to protect against surface erosion, wave action, and adverse
effects of sudden drawdown;
3) Dikes
mechanically compacted to a density sufficient to withstand the range of
loading conditions in the CCR surface impoundment;
4)
Slope protection consistent with Section 845.430;
5) A
single spillway or a combination of spillways configured as specified in
subsection (a)(5)(A). The combined capacity of all spillways must be designed,
constructed, operated, and maintained to adequately manage flow during and
following the peak discharge from the event specified in subsection (a)(5)(B).
A) All
spillways must be either:
i) Of
non-erodible construction and designed to carry sustained flows; or
ii) Earth-
or grass-lined and designed to carry short-term, infrequent flows at
non-erosive velocities where sustained flows are not expected.
B) The
combined capacity of all spillways must adequately manage flow during and
following the peak discharge from a:
i) Probable
maximum flood for a Class 1 CCR surface impoundment; or
ii) 1000-year
flood for a Class 2 CCR surface impoundment.
6) Hydraulic
structures underlying the base of the CCR surface impoundment or passing
through the dike of the CCR surface impoundment that maintain structural
integrity and are free of significant deterioration, deformation, distortion,
bedding deficiencies, sedimentation, and debris that may negatively affect the
CCR surface impoundment; and
7) For
CCR surface impoundments with downstream slopes that can be inundated by the
pool of an adjacent water body, such as a river, stream or lake, downstream
slopes that maintain structural stability during low pool of the adjacent water
body or sudden drawdown of the adjacent water body.
b) The
annual assessment described in this Section must identify any structural
stability deficiencies associated with the CCR surface impoundment in addition
to recommending corrective measures.
If a deficiency or
a release is identified during the periodic assessment, the owner or operator
of the surface impoundment must submit to the Agency a construction permit
application including documentation detailing proposed corrective measures and
must obtain any necessary permits from the Agency as soon as feasible.
c) The
owner or operator of the CCR surface impoundment must obtain a certification
from a qualified professional engineer stating that the initial structural
stability assessments and each annual assessment thereafter was conducted in
accordance with the requirements.
d) Timeframe
for Submission of
Structural Stability Assessment
1) The
owner or operator of a new CCR surface impoundment must
submit the initial structural
stability assessment
certification with the initial
operating permit application
before the initial receipt of CCR in the surface impoundment.
2) The
owner or operator of an existing CCR surface impoundment must submit the
initial
structural
stability assessment certification with its first annual inspection report
required by Section 845.540(b).
3) The
owner or operator of a CCR surface impoundment must submit
the annual structural stability assessment certification
each
year with the annual inspection required by Section 845.540(b).
4)
The owner or operator of a CCR surface impoundment must
place each structural stability assessment in the facility's operating record
(see Section 845.800(d)(5)).
e) The
requirements of this Section apply to all CCR surface impoundments, except for
those CCR surface impoundments that are incised CCR surface impoundments. If
an incised CCR surface impoundment is subsequently modified (e.g., a dike is
constructed) such that the CCR surface impoundment no longer meets the
definition of an incised CCR surface impoundment, the CCR surface impoundment
is subject to the requirements of this Section.