35 Ill. Adm. Code 845.520
Emergency Action Plan
Section
845.520 Emergency Action
Plan
a) The
owner or operator of a CCR surface impoundment must prepare and maintain a
written Emergency Action Plan (EAP). The owner or operator must place the EAP
and any amendment of the EAP in the facility's operating record (see Section
845.800(d)(9)).
b) At a minimum, the EAP
must:
1) Define
the events or circumstances involving the CCR surface impoundment that
represent a safety emergency, along with a description of the procedures that
will be followed to detect a safety emergency in a timely manner;
2) Define
responsible persons, their respective responsibilities, and notification
procedures for a safety emergency involving the CCR surface impoundment;
3) Provide
contact information of emergency responders;
4) Include
a map that delineates the downstream area that would be affected if a CCR
surface impoundment fails and a physical description of the CCR surface
impoundment; and
5) Include
provisions for an annual face-to-face meeting or exercise between
representatives of the owner or operator of the CCR surface impoundment and the
local emergency responders.
c) The
owner or operator of a CCR surface impoundment must prepare an initial
Emergency Action Plan for the facility by October 31, 2021, or by initial
receipt of CCR in any CCR surface impoundment at the facility if the owner or
operator becomes subject to this Part after October 31, 2021.
d) Amendment of the Plan
1) The owner or operator of a CCR surface
impoundment may amend the written EAP at any time.
2)
The owner or operator must amend the written EAP whenever
there is a change in conditions that would substantially affect the EAP in
effect.
3) The
written EAP must be evaluated, at a minimum, every five years to ensure the
information required in this Section is accurate.
e)
The owner or operator of the CCR surface impoundment must
obtain a certification from a qualified professional engineer stating that the
written EAP, and any subsequent amendment of the EAP, meets the requirements of
this Section.
f) Activation
of the EAP. The EAP must be implemented once events or circumstances involving
the CCR surface impoundment that represent a safety emergency are detected,
including conditions identified during any structural stability assessment
s
,
annual inspections, and inspections by a qualified person. The owner or
operator of the CCR surface impoundment must submit records documenting all
activations of the EAP to the Agency and place the documentation in the
facility's operating record as required by Section 845.800(d)(10).
g) The
owner or operator of a CCR surface impoundment must document the annual
face-to-face meeting or exercise between representatives of the owner or
operator of the CCR surface impoundment and the local emergency responders as
required by subsection (b)(5). The owner or operator of the CCR surface
impoundment must place this documentation in the facility's operating record as
required by Section 845.800(d)(11).