44 Ill. Adm. Code 8.3100
Design-Build Shortlist
Section 8.3100Â Design-Build Shortlist
a)Â Â Â Â Â Â Â Â Upon
completion of the Phase 1 qualifications evaluation, CDB shall create a
shortlist of no fewer than 2 and no more than 6 (or the maximum number noted in
the RFP) of the most highly qualified DB entities and shall be reviewed by the
CPO for conformance with the evaluation criteria in Section 8.3095.
b)Â Â Â Â Â Â Â Â CDB shall notify in
writing the entities selected for the shortlist.
1)Â Â Â Â Â Â Â Â The
notification shall commence the period for preparation of Phase 2 submittals as
listed in the RFP.
2)Â Â Â Â Â Â Â Â CDB
may extend the period beyond that listed in the RFP, at its discretion, by
including the new deadline in the written notification.
c)Â Â Â Â Â Â Â Â All
DB entities selected for Phase 2 evaluation shall be published on CDB's volume of
the Procurement Bulletin after that determination.