56 Ill. Adm. Code 6000.352
Aerial Adventure
Section 6000.352 Aerial Adventure
a) In
addition to the definitions in Section 2-2 of the Act and Section 6000.10, the
following shall apply to and govern this Section 6000.352:
"Acceptance Inspection"
means the final inspection of a course performed upon installation completion
and before commissioning.
"Anchor System" means a
system of anchorages and anchorage connectors that provide a secure termination
for a life safety system, personal safety system, belay system, or rope rigging
system.
"Anchorage" means the
terminating component of a life safety system, personal safety system, belay
system, or rope rigging system intended to support any force applied to the
system.
"Anchorage Connector"
means an interface component coupling any anchor system or system component to
an anchorage.
"Aerial Adventure Course"
means a patron participatory facility or facilities consisting of one or more
elevated walkways, platforms, zip lines, nets, ropes, or other elements that
require the use of fall hazard Personal Safety Equipment (PSE).
"Automatic Anchorage
Connector" means an anchorage connector that is properly engaged by
automatic action without manually applied fasteners in the connector.
"Brake" means a device,
method or system used to arrest the traverse of the participant.
"Brake System" means a
complete system, comprised of the primary and emergency brakes, that arrests
the participant's traverse along an element. Brake systems can be active or
passive.
"Commissioning" means an
action by the installer or other competent person of putting a new element or
course into service for the owner/operator.
"Competent Person" means
a person possessing the skills, knowledge, experience, training and judgment to
perform assigned tasks or activities satisfactorily, as determined by a
reasonable person.
"Dismount" means the act
of disembarking from the element and proceeding away from the landing area.
"Fixed Course" means a course
that is designed to be used at a fixed, single location and not readily moved
to a different location.
"Landing Area" means the
area provided for the participant to arrest and dismount after traversing an
element.
"Mobile Course" means a
course that is designed or adapted to be moved from one location to another and
is not fixed at a single location.
"Mobile Course Manufacturer"
means a company responsible for the design, quality, fabrication and delivery
of a mobile course.
"Operating System" means
the system or systems of processing a patron through the course route used on a
particular site. This includes registration, preparation, getting to the
landing point, methods of attachment, the rigging and lowering system, and the
landing recovery method.
"Operation, Maintenance,
Inspection and Training Manual" or "Manual" means a document
containing the procedures and forms for the operation of the course activity
and equipment on the site.
"Service Proven" means
an element, ride, device, structure or major modification to an element, ride
or device of which:
units have been
in service to the public for a minimum of 5 years; and
units that have been in service
without any significant design related failures or significant design related
safety issues that have not been mitigated.
"Third Party Inspector"
means a qualified person:
not directly employed by the
operator of the course or parent company, original equipment manufacturer (OEM)
or vendor; and
not offering other services to the
operator of the course or parent company.
The person shall be qualified via
ACCT accreditation, AIMS certification, NAARSO certification, PRCA
accreditation, or other approval that equally qualifies that person to provide course
inspections.
b) This
Section shall govern all courses in operation on or after January 1, 2021.
However, the Director may grant a permit to an operator of a course in
operation on December 8, 2020 that does not meet all the standards set forth in
this Section if the operator can clearly demonstrate a service-proven element
or demonstrate that the applicable safety requirements throughout this Part are
substantially satisfied to ensure the safety of the public.
c) This
Section specifies the site, site approval, design, testing of equipment,
management of the operation, operating procedures, and emergency provisions and
procedures for courses from any mechanically operated platforms that carry
participants to the top of the structure. All courses shall meet the
manufacturer's standards and specifications.
d) Site Plan, Equipment
Design and Construction
1) All course
operating system design documents shall be reviewed and sealed by a licensed
professional engineer and a licensed structural engineer. ANSI, ACCT, ASTM or
other applicable standards shall be used as general guidance. The designer of
fixed courses and the manufacturer of mobile courses are responsible for
preparing the report for the owner. The design report shall contain site plans,
safety zones, drawings and specifications of equipment, platform, rigging system,
and safety equipment. The report shall be submitted to the Department before
the commissioning of fixed courses and operation of mobile courses and shall be
maintained on the site where the course is operating. The design evaluation
included in the report shall consider the following:
A) Static and dynamic loads
on anchors and components.
B) Fatigue limits or
absolute component replacement intervals.
C) Fatigue limits for
structures.
D) Protection against
metallic corrosion and wood rot.
E) Clearances
and hazard analysis, including consideration of the effects of heavy
crosswinds, rain, fog and other conditions resulting in impaired visibility,
maneuverability, loss of traction or grip, and reduced braking capability.
F) Platform,
walkway, ladder and associated foundation size and load ratings, including
factors of safety.
G) Anchor
and foundation analysis for mobile courses shall consider the load path through
the anchor attachment point and shall identify loading through all components,
including an identified fixed foundation. Vehicle frames or underframes can be
used as fixed foundations, providing a verifiable load analysis is submitted.
Alternate qualification, consisting of a statement by the vehicle manufacturer
confirming the anchor attachment point and loadings are suitable for the
vehicle, is acceptable.
2) An
inspection by a third-party inspector shall be conducted each time a major
component is modified. Scheduled component replacements in accordance with
manufacturer or designer maintenance procedures do not constitute a design
modification.
3) Fixed
courses shall be inspected by a third-party inspector annually. This
information shall be presented in a report to the owner in accordance with the
ACCT Challenge Course Inspection Standards or equivalent standards approved by
the Department. The report shall be submitted to the Department.
4) Differences
between the design as detailed in the engineer's report and evaluation and the
implemented installation by a competent person shall be reconciled. Appropriate
explanations of the differences, which may include modified drawings,
procedures, analyses and additional calculations, shall be appended to the
original design report or engineering evaluation, as applicable. Owner's
manuals shall be updated to reflect the engineer's or manufacturer's acceptance
of the modifications.
5) A
fixed course site commissioning plan, including an acceptance test procedure
and report, shall be incorporated in the engineer's report. Commissioning and
testing shall be conducted by a competent person
6) Mobile
course site setup, pre-start inspection, and test procedures shall be clearly
documented and followed by a competent person.
7) The
Department shall maintain the confidentiality of the engineer's report as
authorized by Section 7(1)(g) of the Freedom of Information Act.
e) General Compliance
Criteria
1) Equipment
A) When a
portion of the course or landing area is not visible from the element departure
point, a departure procedure shall be utilized to ensure a clear unobstructed
run.
B) There
shall be adequate clear space above, below and around the course to ensure the
participant will not strike or contact any permanent or transient obstruction,
object or person.
C) Rescue
ropes, equipment appropriate to applicable rescue loads, rescue plans, and
personnel trained to retrieve a participant from anywhere within course spans
shall be present during use.
D) Carabiners
and snap-hooks shall comply with the gate strength and other applicable
requirements of ANSI/ASSP Z359.1 (2007) for the manufacturer's estimated life
cycle of the product. Carabiners and snap-hooks shall be auto-closing and
auto-locking and require at least two deliberate consecutive actions to open.
E) Lanyards
shall comply with the strength requirements of ANSI/ASSP Z359.1 (2007) for
manufacturers estimated life cycle of the product. Lanyards should carry the
marking of the manufacturer and the safe working load or breaking strength.
F) Hair,
clothing that may become entangled in safety equipment or component parts, and
items carried by participants, including backpacks and carryalls, shall be
secured properly.
G) Pulleys
and trolleys shall be of the double wheel type construction per the design
specification to eliminate derailing during operation.
H) All
parts and components shall be purchased from the manufacturer or shall only be
manufacturer approved replacement parts.
2) Course
Arrival Point, Protection and Braking
A) Courses
shall have appropriate safety devices, such as impact-absorbing materials,
ground cover, load limiters, landing mats, or landing nets, installed per the
manufacturer's design specifications at the course arrival point. Descriptions
and operating characteristics of the safety devices shall be included in the
design drawings.
B) One or
more of the following methods shall be included in the operating system of the course:
i) Impact
absorbent ground cover, impact absorber/load limiter, landing mats, nets, water
landings, or other protective methods installed in arrival areas to reduce
injury potential.
ii) Passive
braking systems shall not require any action by the user and shall always be in
effect through gravity or engineered or mechanical means. In the event gravity braking
is designed to result in the participant being removed after arriving at a low
point in the course, the removal device or equipment shall be rated for the
design reach and loads, as determined by the design plan. In the event mobile
equipment is used to remove participants at the arrival point, the approach
path shall be free of potential hazards. The stability of the vehicle shall be
insured through proper selection of the equipment and the approach.
iii) Active
braking systems with use of a mechanical braking system must also have a
secondary braking system or assistance of an operator as a secondary or
emergency braking system.
C) Parked
vehicles shall only be used as secondary tie-off points for portable courses
and may be used as primary anchor points when the vehicle meets the weight
class and type specified by the manufacturer and engineering requirements of
the ride. Additionally, any vehicle used as a primary or secondary anchoring
point must be physically prevented from being operated by disabling the
electrical system (disconnecting battery) so that the vehicle cannot be started
or by other means outlined in the manufacturer's design specifications.
D) The
use of a tree as an anchor point for the termination of a course or to secure
the takeoff platform of a course is acceptable. The tree or trees shall be
inspected and approved by a certified arborist to ensure good health and stability
of the trees. All trees on fixed installations shall receive this assessment no
less than annually.
3) Course
Takeoff Platform
A) Takeoff
platforms shall be designed to prevent the participant from striking any
portion of the platform or lower obstacle during the takeoff.
B) Angles
of inclination of the landing ramps shall not constitute a tripping hazard for
the participant.
C) Where
necessary, impact-absorbing material shall be utilized to prevent injury.
D) Unauthorized
access to course platforms during periods when the ride is shut down or not
attended by a qualified operator shall be prevented by suitable means,
including barriers. Hazard warning signs shall be conspicuously placed where
applicable.
f) Site Operating Manual
and Documentation
1) Each
site shall have an operating manual for the safe operation of course activities
on that site. The manual and all amendments shall be on-site and freely
available to operator staff and governing bodies.
2) The
manual shall include the procedures for complying with this Part.
3) The manual shall
include, but not be limited to, the following:
A) A site plan;
B) A description of
operating systems and equipment;
C) Job
procedures, including training, for each task in the operating system. The
Staff Training Plan (see Section 6000.120(c)) shall include documentation of
training provided by the qualified industry training professional, including
certificates verifying competency in technical skills for each challenge course
staff;
D) Challenge Course
Personnel Job Descriptions
i) Challenge
course managers shall be 21 years of age or older.
ii) Challenge
course staff shall be 16 years of age or older and shall have training (see
Section 6000.120(c)) and general knowledge of the operation of the element to
which they are assigned.
E) Sample of staff
qualifications;
F) Staff selection
procedures;
G) Maintenance standards
and procedures;
H) Testing procedures and
recording;
I) Criteria for the
periodic replacement of rigging;
J) Criteria
for the regular planned inspections of ropes, webbings and bindings;
K) Emergency plan and
procedures;
L) Reporting of injuries,
damage and incidents;
M) Requirements for maintaining
logs, including:
i) Site;
ii) Equipment and rigging;
and
iii) Personnel;
N) Records
to be kept;
O) Requirements for
analysis of records;
P) Inspection procedures,
standards and follow-up actions; and
Q) Examples of forms to be
used.
g) Emergency Provisions and
Procedures
1) Each site shall have an
emergency plan.
2) A medium first aid kit
and blankets shall be on site.
3) Emergency
lighting shall be provided at sites that operate between ½ hour before sunset
and ½ hour after sunrise. The emergency lighting system shall illuminate the
takeoff platform, the course, and the arrival point for participants. The
emergency lighting system shall have its own power source.
4) In
inclement weather, including but not limited to lightning, rain, hail, snow or
high winds, outdoor operations shall cease and participants shall not be
allowed to be on or near the course.
h) If a course
operating system meets all the equipment and inspection requirements of this
Section, the Department will issue an operating permit, subject to the
applicant submitting the fees required by Section 6000.50(b) and (c).
i) An
owner or operator of a course that is permitted under the Act and this Part may
disclose or advertise such permit status. Misrepresentation of permit status
shall be a violation of the Act. No owner or operator shall advertise any course
as being otherwise endorsed or approved by the Department, in any
advertisement, brochure, commercial, TV or radio show, or newspaper, or in any
other public manner.