8 Ill. Adm. Code 215.45
Piping, Tubing and Fittings
Section 215
Section 215.45 Piping,
Tubing and Fittings
a) All
piping, tubing and fittings shall be made of steel or other material suitable
for anhydrous ammonia service. Brass, copper or galvanized steel pipe or
tubing shall not be used. Cast iron fittings shall not be used. Those parts
of valves that are subjected to gas pressure shall be made of steel, ductile
(nodular) iron, or malleable iron. Ductile iron shall meet the requirements of
ASTM A395 and malleable iron the requirements of ASTM A47.
b) All
piping, tubing, and fittings shall be designed for a pressure no less than the
maximum pressure to which they will be subjected in service.
c) All
piping shall be supported to prevent damage to the pipes. Provisions shall be
made for expansion, contraction, jarring, vibration and settling. All
refrigeration system piping shall conform to the Refrigeration Piping Code (ASME
B31.5) as it applies to anhydrous ammonia.
d) Piping
used on non-refrigerated systems shall be at least ASTM A53 Grade B seamless or
electric resistance welded pipe. Pipe joints shall be threaded, welded or
flanged. Pipe shall be at least Schedule 40 when joints are welded or welded
and flanged. Pipe shall be at least Schedule 80 when joints are threaded.
Threaded nipples shall be seamless. Welding shall be done by a certified
welder.
e) Metal,
flexible connections may be used for permanent installations to provide for
expansion, contraction, jarring, vibrating and settling. In no case shall the
angle of the connection exceed 15 degrees. The connection used for
non-refrigerated installations shall have a minimum working pressure of 350
psig and a minimum burst pressure of 1750 psig.
f) Adequate
provisions shall be made to protect all exposed piping from physical damage that
might result from impact by moving machinery, automobiles or trucks, or any
other equipment at the facility. Underground piping is allowable.
g) Joint
compounds shall be resistant to ammonia at the maximum pressure and temperature
to which they may be subjected in service.
h) After
assembly, all piping, fittings, and tubing shall be tested and proved to be
free from leaks at a pressure no less than the normal operating pressure of the
system.