327 IAC 8-4.1-13
327 IAC 8-4.1-13 New well site submittal requirements
Cite as Ind. Admin. Code tit. 327, r. 8-4.1-13
Sec. 13. (a) All CPWSSs subject to this rule must receive approval for a new well site and submit the following:
(1) A United States Geological Survey seven and one-half (7.5) minute series topographic map illustrating the area surrounding the well and proposed well site.
(2) A detailed map, drawn to a scale between 1" = 400' and 1" = 1,000', showing the following:
(A) Proposed well site with ownership or easement boundaries.
(B) The location of the proposed well.
(C) The sanitary setback area.
(3) A WHPA delineated using the following:
(A) Fixed radius method, with a radius of three thousand (3,000) feet, regardless of the pumping capacity of the system.
(B) An analytical, a semianalytical, or a numerical model, executed by a qualified ground water scientist, using input parameters calculated from:
(i) regional data from published reports; or
(ii) site-specific data.
(C) Any approved method described in section 5 of this rule.
(4) Potential sources of contamination inventory performed by methods outlined in section 8(3) of this rule.
(5) A summary of geologic and ground water quality information for the aquifer system used by a proposed well, where available.
(6) A schedule for the development of a Phase I WHPP.
(b) Approval of a CPWSS proposed well site is dependent on the ability of each CPWSS to provide safe drinking water, as determined by the department under 327 IAC 8-2.7.
(c) To maintain well site approval status, the CPWSS must meet the following requirements:
(1) Allow no new potential sources of contamination to locate within the sanitary setback area.
(2) The CPWSS is operated in a manner that it will not violate any sanitary or health regulations or requirements.
(3) Maintenance of additional requirements specified by the CPWSS construction permit.