10 CSR 22-3.030
Registration Permit Requirements
PURPOSE: The purpose of this rule is to
itemize the requirements for a registration
permit.
(1) In addition to the basic requirements for all
permits listed in 10 CSR 22-3.020(1), (2), (3),
and (7), the registration permit application for
a conventional dam and reservoir must include
certification by an experienced professional
engineer or an agency engineer that the dam
and reservoir have been inspected in accordance with the law and that the owner has
complied with the engineer’s recommendations to correct the observed defects and an
inspection report, as required by the law. The
engineer must further show that the spillway
can safely pass the spillway design flood
derived from Table 5 and submit a report
describing the correction of all observed
defects and the description of an operation and
maintenance program to be followed while the
registration permit is in effect.
(A) The inspection of a dam and reservoir
for a registration permit is intended to detect
observable defects. The procedure to determine observable defects normally will be a
surface examination by an experienced professional engineer or an agency engineer. The
inspection must include all surface examinations necessary to determine if observable
defects exist that affect the stability of the
dam and reservoir or the adequacy of the
spillway. Judgment of the structural stability
and an evaluation of the spillway capacity
must be made. Judgment shall be based upon
the engineer’s experience, training and
knowledge of similar dams and in accordance
with practices reputable and in current use in
the engineering, geologic and construction
professions.
1. Observed defects which may require
correction, evaluated on the basis of current
engineering, geologic and construction practices, include but are not limited to: slides;
slopes as steep as or steeper than those on
similar types of dams and constructed of similar materials which have experienced slope
stability problems; piping of fines; seepage
that exits in an uncontrolled fashion on the
downstream slope of or from the downstream
foundation of the dam; unusual zones of softness and irregular settlement; erosion on the
upstream or downstream slope of the dam;
spillways that are calculated to be inadequate
for the design flood; spillways that are eroded
or otherwise in poor condition and cracks in
the embankment or structure.
2. Observed defects that are in an
advanced state of deterioration must be
immediately reported by the inspecting engineer to the owner and to the chief engineer.
(B) Proper maintenance and operation of a
dam and reservoir are critical to the continuing safety of a dam and reservoir and to public safety, life and property. A maintenance
program is required and shall include the following items: erosion control on the embankment; monitoring emergency spillway flow
rates; vegetation control; spillway maintenance; emergency action plans; maintenance
and monitoring of seepage observation
devices, if any; and maintenance and monitoring of instruments used, if any, to observe
the stability of the dam.
(C) Visits for the purpose of observation of
maintenance and operation may be made by
the council, the chief engineer, or a member
of the chief engineer’s staff. Visits will be at
any reasonable time following reasonable
notice, except that in the case of an emergency threatening public safety, life, or property,
inspection may be at any time.
(D) The application need not state, nor is
it necessary to show, that the dam is a safe
dam. The intent of the registration permit is
to show that the dam is performing adequately and that there are no observable indications
that the dam is unsafe.
(2) In addition to the basic requirements for
all permits listed in 10 CSR 22-3.020(1), (2),
(3), and (7), the registration permit application for an industrial water retention dam and
reservoir shall include certification by an
experienced professional engineer or an agency engineer that the dam and reservoir have
been inspected in accordance with the law
and that the owner has complied with the
engineer’s recommendations to correct
observed defects and an inspection report, as
required by the law. The engineer must further show that the spillway can safely pass the
spillway design flood derived from Table 5
and submit a report describing the correction
of any observed defects, the operation and
maintenance program to be made a part of the
registration permit and the phased, stepped,
and/or continuous construction of the dam.
(A) The inspection of an industrial water
retention dam and reservoir for a registration
permit is intended to detect observable
defects. The procedure to determine observable defects normally will be a surface examination by an experienced professional engineer or an agency engineer. The inspection
must include all surface examinations necessary to determine if observable defects exist
that affect the stability of the dam and reservoir or the adequacy of the spillway.
Judgment of the structural stability and an
evaluation of the spillway capacity must be
made. Judgment shall be based upon the engineer’s experience, training and knowledge of
similar dams and in accordance with practices reputable and in current use in the engineering, geologic and construction professions.
1. Observed defects which may require
correction, evaluated on the basis of current
engineering, geologic and construction practices, include but are not limited to slides;
slopes as steep as or steeper than those on
similar types of dams and constructed of similar materials which have experienced slope
stability problems; piping of fines; seepage
that exits in an uncontrolled fashion on the
downstream slope of or from the downstream
foundation of the dam; unusual zones of softness and irregular settlement; erosion on
upstream or downstream slope of the dam;
spillways that are calculated to be inadequate
for the design flood; spillways that are eroded
or otherwise in poor condition and cracks in
the embankment or structure.
2. Observed defects that are in an
advanced state of deterioration must be
immediately reported by the inspecting engineer to the owner and to the chief engineer.
(B) Proper maintenance and operation of a
dam and reservoir are critical to the continuing safety of a dam and reservoir and the protection of public safety, life and property. A
maintenance program is required and shall
include the following items: erosion control
on the embankment; monitoring of storm
runoff; vegetation control; spillway maintenance; emergency action plans; maintenance
and monitoring of seepage observation
devices, if any; and maintenance and monitoring of instruments used, if any, to observe
the stability of the dam.
(C) The council or chief engineer may
require the owner to submit a report describing the phased, stepped, and/or continuous
construction of an industrial water retention
dam and reservoir, containing information on
the materials used, method of transport, and
placement of materials, the sequence and
placement location of materials, spillway
changes to be made, the anticipated final
dimensions and configuration of the dam, and
the name, address, and telephone number of
the person(s) in responsible charge of this
work.
(D) Visits for the purpose of inspecting during construction or enlargement or observation
of maintenance and operation may be made by
the council, the chief engineer, or a member
of the chief engineer’s staff. Visits will be at
any reasonable time following reasonable
notice, except that in the case of an emergency
threatening public safety, life or property,
inspection may be made at any time.
(E) It shall not be necessary for the owner
to retain an experienced professional engineer
or an agency engineer continuously during
the entire permit period unless there is modification(s) in the construction method
described in the permit application. However,
personnel with adequate supervision and
training in methods of safe construction,
maintenance and operation of dams must be
provided to insure that the construction maintenance and operation of the dam and reservoir are carried out as described.
(F) The registration permit will be the only
permit required for an industrial water retention dam and reservoir that was in existence
prior to the effective date listed in 10 CSR
22-2.020(2) unless it is to be reduced or
removed. If the dam or reservoir is to be
reduced or removed, a construction permit
will be required. Other changes will require
the owner to obtain a new registration permit.
(G) The applicant need not state, nor is it
necessary to show, that the dam is a safe dam.
The intent of the registration permit is to show
that the dam is performing adequately and that
there are no readily observable indications that
the dam is unsafe and that phased, stepped,
and/or continuous construction of the dam
will meet the requirements of the law.
AUTHORITY: sections 236.400, 236.405,
236.415, 236.420, 236.425, 236.440, and
236.465, RSMo 2016.* Original rule filed
April 14, 1981, effective Aug. 13, 1981.
Amended: Filed June 14, 1984, effective Jan.
1, 1985. Amended: Filed June 27, 2018,
effective Feb. 28, 2019.
*Original authority: 236.400, RSMo 1979; 236.405,
RSMo 1979, amended 1993, 1995; 236.415, RSMo 1979,
amended 1995; 236.420, RSMo 1979; 236.425, RSMo
1979; 236.440, RSMo 1979; and 236.465, RSMo 1979.