10 CSR 22-3.040
Construction Permit Requirements
PURPOSE: The purpose of this rule is to
itemize the requirements for a construction
permit.
(1) In addition to the basic requirements for
all permits listed in 10 CSR 22-3.030, the
construction permit application for a conventional dam and reservoir shall be prepared
under the direction of and certified by an
experienced professional engineer and shall
be in accordance with practices reputable and
appropriate in the engineering, geologic, and
construction professions.
(A) The following information shall be
provided by the owner:
1. Up-to-date topographic map(s) showing the location of the proposed or existing
dam, the upstream watershed, the reservoir,
and the downstream environment zone. An
up-to-date United States Geological Survey
topographic map is considered a minimum;
2. Exploration records and results
including the location of all exploration,
especially in the area of the core trench, the
method(s) used to explore the site, a record of
what was found, the method(s) used to obtain
samples, and the number of samples taken;
3. Testing records and results including
information on the care and treatment of samples, types of tests performed on samples or
in situ, reference(s) to or the procedures used
in testing, and the test results. Physical and
mechanical properties of foundation and construction materials must include the information source for these values, especially if they
are not the results of testing;
4. The geotechnical design procedure(s)
or method(s) shall be identified and referenced or described so that they may be
reviewed and the applicability verified. This
shall include all assumptions made. The
geotechnical procedure(s) or design results
shall include the minimum computed factors
of safety and they must meet or exceed the
design factors of safety (see 10 CSR 223.020(4)). The geotechnical design information shall be presented for the foundation,
core
trench,
and
dam
embankment.
Earthquake loading must be analyzed as outlined in 10 CSR 22-3.020(5) and (6);
5. The structural design procedure(s) or
method(s) shall be identified and referenced
or described so that they may be reviewed
and their applicability verified. Design
results for concreted dams and concrete
structures appurtenant to embankment dams
shall provide for and show an adequate factor
of safety for normal and maximum loading
conditions of compression, tension, shear,
torsion, buckling, sliding, and overturning;
6. Hydrologic information used to evaluate the watershed, reservoir, spillway, and
downstream environment zone including the
watershed area, rainfall rate and duration,
antecedent moisture conditions, time of concentration, area capacity curves, description
of spillway elevation(s), type(s), dimensions,
locations, cross section and profiles, dam
crest elevation, and the downstream valley
cross sections;
7. The hydrologic/hydraulic design procedure(s) or method(s) used shall be identified and referenced or described so that they
may be reviewed and their applicability verified. This includes all assumptions made.
The hydrologic/hydraulic procedure(s) or
design results shall include the reservoir
inflow hydrograph, the reservoir outflow
hydrograph, the spillway discharge capacity,
the freeboard at the maximum water storage
elevation, and the environmental class of the
dam. The dam shall be capable of safely containing or discharging the required design
flood (see 10 CSR 22-3.020(5));
8. Location and design of diversion
channels or other structures to control stream
flow during or after construction shall be provided if failure of these channels or other
structures would affect hydrologic conditions
of the dam. Stream diversion systems used
during construction shall be designed to provide protection to the dam and the safety of
the public;
9. Construction control and inspection
procedures shall be used during the construction of a new dam and reservoir or modification of an existing dam and reservoir.
Construction control and inspection procedures should include compaction testing and
density testing;
10. Procedures shall be used for recordkeeping and monitoring throughout the construction or modification process to provide
information about any construction progress
and conditions that may cause difficulties
during construction;
11. The location of and protective measures used in conjunction with all drain lines,
sewer lines, utilities, or other structures that
pass through or under the dam;
12. Topographic surveys showing the
location of baselines, centerlines, and other
horizontal and vertical control points sufficiently accurate to locate the proposed construction and to define the volume of storage
in the reservoir;
13. Two (2) sets of plans and specifications including—
A. Graphic scales for all scaled drawings;
B. The title, displayed identical on the
plans and the specifications, shall include:
the name of the dam; the name of the owner;
whether the work shows an existing dam, a
proposed dam, or an enlargement, repair, or
alteration of the dam, or reservoir; the county(ies) the dam and reservoir are in; the location of the dam by quarter section, section,
township and range, or by geodetic coordinates; and each sheet shall have in an appropriate title block the name of the dam as well
as the sheet number in relation to the total,
for example, sheet one (1) of twelve (12); and
C. Certifications by the experienced
professional engineer and the owner shall be
provided and be similar to those presented in
figures 1 and 2 (see figures 1 and 2); and
Figure 1
Certification by Experienced Professional Engineer
I hereby certify that these plans for the (insert the correct word or words choosing
from: existing; construction of the; repair of the; enlargement of the; or alteration of the
___________________________________________________ Dam were prepared by me (or under my
Name of Dam
direct supervision) for the owners thereof.
________________________________________
Firm Name
________________________________________
Registered Engineer (Seal)
Figure 2
Certification by Owner
I,______________________________________________________________, owner, whose Post Office Address is
Name of Owner
__________________________________________________ , Zip __________________________________ , do
Owner’s Address
hereby accept and approve these plans.
________________________________________
Owner
14. If a construction permit is requested
to convert a dam to a retaining or retarding
structure, the procedure to be followed in
making the conversion shall be described by
the owner; and
15. The procedures set up for regular
inspection by the owner. The owner shall
develop an emergency action plan, inspect
his/her dam regularly and as necessary to
protect public safety, life and property. A list
of items to be inspected, a time schedule for
these inspections, and a form for reporting
the results shall be established.
(B) The council or chief engineer may
require the following action and information
from the owner:
1. Procedures set up to provide regular
maintenance and minor repairs to the dam
and reservoir after construction and to continue or start recordkeeping and monitoring
work so that the dam and reservoir are maintained in a safe condition and a complete history of its performance is available;
2. Location and types of instrumentation, drainage, and/or seepage control facilities. Monitoring equipment and drainage and
seepage control facilities are recommended
for all dams and reservoirs, however, depending on conditions, they may be mandatory
items if necessary to accomplish the purposes
of the law;
3. The downstream environment zone
warning procedure to be used if dam failure
is a threat. A downstream environment zone
warning system is recommended for all dams
and reservoirs, however, depending on conditions, it may be necessary to accomplish the
purposes of the law. This would consist of the
current name(s) of the dam and reservoir
owners’ representative(s) responsible for giving notification of a threat of failure and the
current phone numbers of appropriate local
police and other persons having emergency
assistance authority;
4. Upstream slope protection from wave
action; and
5. Additional actions or information as
required to protect public safety, life and
property and to accomplish the purposes of
the law.
(C) Visits for the purpose of inspecting
during or after construction or observation of
operation and maintenance may be made by
the council, the chief engineer, or a member
of the chief engineer’s staff. Visits will be at
any reasonable time following reasonable
notice, except that in the case of an emergency threatening public safety, life or property,
inspection may be made at any time.
(2) In addition to the basic requirements for
all permits listed in 10 CSR 22-3.020, the
construction permit application for an industrial water retention dam and reservoir shall
be prepared under the direction of and certified by an experienced professional engineer
and shall be in accordance with practices reputable and appropriate in the engineering,
geologic, and construction professions.
(A) The engineer who plans and designs an
industrial water retention dam and reservoir
or its modification shall assess the sequence,
timing, method of placement and stability
control program during construction from the
beginning of the starter dam or modification
through the life of the structure and after
operation ceases or until the dam and reservoir no longer need a permit.
(B) Adequate records, as required by best
practices in the geologic and engineering professions, shall be kept and made available to
the council or chief engineer for the construction, maintenance, and operation procedures.
Adequate instrumentation and monitoring of
seepage water shall be provided where necessary. Any significant settling or movement in
the foundation of the dam should be measured, if possible. Trained personnel and adequate supervision shall be provided to insure
the construction and operation of the dam and
reservoir are carried out to specifications.
(C) The following information shall be
provided by the owner:
1. A description of the system used to
deposit tailings on the dam;
2. Up-to-date topographic map(s) showing the location of the proposed dam, the
upstream watershed, the reservoir, and the
downstream environment zone. An up-to-date
United States Geological Survey topographic
map is considered minimum;
3. The location(s) of surface and underground mine workings if these workings
would cause, would contribute to the cause,
or would be affected in the event of failure;
4. Exploration records and results
including the location of all exploration,
especially in the area of the core trench, the
method(s) used to explore the site, a record of
what was found, the method(s) used to obtain
samples, and the number of samples taken;
5. Testing records and results including
information on the care and treatment of samples, types of tests performed on samples or
in situ, reference(s) to or the procedures used
in testing, and the test results. Physical and
mechanical properties of foundation and construction materials must include the information source for these values, especially if they
are not the results of testing;
6. The geotechnical design procedure(s)
or method(s) shall be identified and referenced or described so that they may be
reviewed and their applicability verified. This
shall include all assumptions made. The
geotechnical procedure(s) or design results
shall include the minimum computed factors
of safety and they must meet or exceed the
design factors of safety (see 10 CSR 223.020(4)). The geotechnical design information shall be presented for the foundation core
trench and dam embankment. Earthquake
loading must be analyzed as outlined in 10
CSR 22-3.020(5) and (6);
7. Type and physical properties of the
liquid and solid materials to be used in construction of the dam and contained in the
reservoir;
8. The changes created in the downstream environment zone as the dam and
reservoir become incrementally larger;
9. The embankment changes and new
factors of safety for stability as the dam and
reservoir become incrementally larger;
10. If a starter dam is used, whether it
will be pervious or impervious;
11. The expected crest elevation, dam
configuration, spillway elevation, and the size
and configuration of each successive stage of
the dam shall be included;
12. Anticipated storage volume of solid
or semisolid materials and of liquids at the
completion of the dam;
13. The structural design procedure(s) or
method(s) shall be identified and referenced or
described so that they may be reviewed and
their applicability verified. Design results for
concrete dams and concrete structures appurtenant to embankment dams shall provide for
and show an adequate factor of safety for normal and maximum loading conditions of compression, tension, shear, torsion, buckling,
sliding, and overturning;
14. Hydrologic information used to evaluate the watershed, reservoir, spillway, and
downstream environment zone including the
watershed area, rainfall rate and duration,
antecedent moisture conditions, time of concentration, area capacity curves, description
of spillway elevation(s), type(s), dimensions,
locations, cross sections and profiles, dam
crest elevation, and the downstream valley
cross sections;
15. Hydrologic/hydraulic design procedure(s) or method(s) used shall be identified
and referenced or described so that they may
be reviewed and their applicability verified.
This shall include all assumptions made. The
hydrologic/hydraulic procedure(s) or design
results shall include the reservoir inflow
hydrograph, the reservoir outflow hydrograph, the spillway discharge capacity, the
freeboard at the maximum water storage elevation and the environmental class of the
dam. The dam shall be capable of safely containing or discharging the required design
flood (see 10 CSR 22-3.020(5));
16. The hydrologic changes, the spillway
alterations proposed, and the freeboard
changes as the dam becomes incrementally
larger;
17. Location and design of diversion
channels or other structures to control stream
flow during or after construction shall be provided if failure of these channels or other
structures would affect the stability or hydrologic conditions of the dam. Stream diversion
systems used during construction shall be
designed to provide protection to the dam and
to protect public safety, life and property;
18. Location and design of any diversion
channels or other structures to control runoff
or reclaimed water;
19. Construction control and inspection
procedures shall be determined by the engineer and used during the construction of a
new dam and reservoir or modification of an
existing dam and reservoir. Construction control and inspection procedures shall include
compaction testing and density testing and
any other quality control measures used to
insure compliance with the construction specifications;
20. Procedures shall be used for recordkeeping and monitoring throughout the construction, enlargement, or modification process to provide information about any construction progress and conditions that may
cause difficulties during construction;
21. The location of and protective measures used in conjunction with all drain lines,
sewer lines, utilities, or other structures that
pass through or under the dam;
22. Topographic surveys showing the
location of baselines, centerlines, and other
horizontal and vertical control points sufficiently accurate to locate the proposed construction and to define the volume of storage
in the reservoir at each planned stage of construction;
23. Two (2) sets of plans and specifications including:
A. Graphic scales for all scaled drawings;
B. The title, displayed identical on the
plans and the specifications, shall include:
the name of the dam; the name of the owner;
whether the work shows an existing dam, a
proposed dam or an enlargement, repair, or
alteration of the dam and reservoir; the county(ies) the dam and reservoir are in; the location of the dam by quarter section, section,
township, and range, or by geodetic coordinates; and each sheet shall have in an appropriate title block the name of the dam, as well
as the sheet number in relation to the total,
for example, sheet one (1) of twelve (12); and
C. Certification by the experienced
professional engineer and the owner shall be
placed near the lower right-hand corner of the
title sheet (first sheet) of the drawing. The
certifications shall be as presented in figures
1 and 2 (see figures 1 and 2 preceding);
24. If a construction permit is requested
to convert a dam to a retaining or retarding
structure, the procedure to be followed in
making the conversion shall be described by
the owner; and
25. The procedure set up for regular
inspection by the owner. The owner shall
develop an emergency action plan, inspect
his/her dam and reservoir regularly and as
necessary to protect public safety, life and
property. A list of items to be inspected, a
time schedule for these inspections, and a
form for reporting the results shall be established by the council or chief engineer. Items
that shall receive maintenance to and/or
inspections on a daily basis during periods of
active dam enlargement include: the spigots
or cyclones; the decant lines; the position of
the water pool in relation to the spillway,
decant intake, and crest of the tailings dam;
drain lines checked for quantity of water and
sediment; the embankment observed for visual defects such as slides or significant seepage changes; the spillway shall be checked to
verify that it has not become blocked.
(D) The council or chief engineer may
require the following action and information
from the owner:
1. Procedures set up to provide regular
maintenance and minor repairs to the dam
and reservoir during construction and
enlargement so that the dam and reservoir are
maintained in a safe condition and a complete
history of its performance is available;
2. Location and types of instrumentation, drainage, and/or seepage control facilities. Monitoring equipment and drainage and
seepage control facilities are recommended
for all dams and reservoirs, however, depending on conditions, they may be mandatory
items, if necessary, to accomplish the purposes of the law; a list of items to be inspected,
a time schedule for these inspections, and a
form for reporting the results shall be established by the council or chief engineer;
3. The downstream environment zone
warning procedure to be used if dam failure
is a threat. A downstream environment zone
warning system is recommended for all dams
and reservoirs, however, depending on conditions, it may be necessary to accomplish the
purposes of the law. This would consist of the
current name(s) of the dam and reservoir
owners’ representative(s) responsible for giving notification of a threat of failure and the
current phone numbers of appropriate local
police and other persons having emergency
assistance authority;
4. Upstream slope protection from wave
action; and
5. Additional actions or information as
required to protect public safety, life and
property and to accomplish the purposes of
the law.
(E) Visits for the purpose of inspecting
during or after construction or observation of
operation and maintenance may be made by
the council, the chief engineer, or member of
the chief engineer’s staff. Visits will be at any
reasonable time following reasonable notice,
except that in the case of an emergency
threatening public safety, life or property,
inspection may be made at any time.
(F) Drawings to show changes shall be submitted when changes are made to the original
plans including, without limitation, changes
in incremental dam crest heights, spillway
locations, and cross sections.
AUTHORITY: sections 236.400, 236.405,
236.415, 236.420, 236.425, 236.435,
236.440, and 236.465, RSMo 2016.*
Original rule filed April 14, 1981, effective
Aug. 13, 1981. Amended: Filed June 14,
1984, effective Jan. 1, 1985. Amended: Filed
June 27, 2018, effective Feb. 28, 2019.
*Original authority: 236.400, RSMo 1979; 236.405,
RSMo 1979, amended 1993, 1995; 236.415, RSMo 1979,
amended 1995; 236.420, RSMo 1979; 236.425, RSMo
1979; 236.435, RSMo 1979; 236.440, RSMo 1979; and
236.465, RSMo 1979.