10 CSR 26-2.019
New Installation Requirements
PURPOSE: This rule sets the standards that
installations and installers of new underground storage tank systems must meet.
PUBLISHER’S NOTE: The secretary of state
has determined that the publication of the
entire text of the material which is incorporated by reference as a portion of this rule would
be unduly cumbersome or expensive. This
material as incorporated by reference in this
rule shall be maintained by the agency at its
headquarters and shall be made available to
the public for inspection and copying at no
more than the actual cost of reproduction.
This note applies only to the reference material. The entire text of the rule is printed here.
(1) Any installer who intends to install an
underground storage tank (UST) system for
storage of a regulated substance must, at least
fourteen (14) days before installing the tank,
notify the department by approved form
transmitted via email of intent to install a
UST, except that this fourteen (14) day notice
requirement may be waived by the department when a release is suspected or in other
similarly urgent circumstances. The notification must provide the tank owner’s name,
installer name, the name and location of the
facility where the UST will be installed, the
date that the installation is expected to commence, the date that the tank is expected to be
brought in use, UST system information,
including tank material, size, manufacturer,
piping material, piping type, and manufacturer, release detection equipment, and spill and
overfill equipment. The installation notice is
valid for one hundred eighty (180) days from
receipt by the department and only for the
UST system(s) listed on the notice. If installation does not commence within one hundred eighty (180) days of the date on which
the department received the notice, a new
installation notice must be submitted prior to
commencing installation activities.
(2) Installers must document compliance with
all manufacturer certification or training
requirements for tank, piping, release detection equipment, and spill and overfill equipment installed.
(3) Installers and manufacturers must be properly registered with the Missouri Department
of Agriculture and have a current financial
responsibility mechanism that complies with
the requirements of 2 CSR 90-30.085.
(4) Prior to installation of an underground
tank and/or UST system piping intended to
be used for storage of a regulated substance,
the tank and/or piping must be tested,
inspected, and measured in accordance with
the manufacturer’s requirements and in
accordance with the pre-installation inspection, testing, and/or backfilling sections of
either—
(A) American
Petroleum
Institute’s
Recommended Practice 1615, Installation of
Underground Petroleum Storage Systems, fifth
edition, 2011. This document is incorporated
by reference without any later amendments or
modifications. To obtain a copy, contact the
American Petroleum Institute, 1220 L Street
NW, Washington, DC 20005, (202) 682-8000,
www.api.org/standards/; or
(B) Petroleum
Equipment
Institute’s
Recommended Practice 100-2011, Installation
of Underground Liquid Storage Systems, 2011
edition. This document is incorporated by reference without any later amendments or
modifications. To obtain a copy, contact the
Petroleum Equipment Institute, Box 2380,
Tulsa, OK 74101-2380, (918) 494-9696,
www.pei.org.
(5) Tanks, piping, and equipment must comply with the new system requirements in 10
CSR 26-2.020. Installations shall be conducted in accordance with all manufacturers’
requirements and in accordance with either—
(A) American
Petroleum
Institute’s
Recommended Practice 1615, Installation of
Underground Petroleum Storage Systems, fifth
edition, 2011. This document is incorporated
by reference without any later amendments or
modifications. To obtain a copy, contact the
American Petroleum Institute, 1220 L Street
NW, Washington, DC 20005, (202) 682-8000,
www.api.org/standards/; or
(B) Petroleum
Equipment
Institute’s
Recommended Practice 100-2011, Installation
of Underground Liquid Storage Systems, 2011
edition. This document is incorporated by reference without any later amendments or
modifications. To obtain a copy, contact the
Petroleum Equipment Institute, Box 2380,
Tulsa, OK 74101-2380, (918) 494-9696,
www.pei.org.
(6) When a new UST system is installed at a
marina, the installer must comply with the
Petroleum Equipment Institute’s Recommended
Practice 1000-2014, Recommended Practices
for the Installation of Marina Fueling Systems,
2014 Edition or an alternative procedure
approved by the department. This document
is incorporated by reference without any later
amendments or modifications. To obtain a
copy, contact the Petroleum Equipment
Institute, Box 2380, Tulsa, OK 74101-2380,
(918) 494-9696, www.pei.org.
(7) Should one (1) or more of a manufacturer’s
requirements contradict the recommended
industry practice(s), the manufacturer’s
requirements shall be followed. Backfill materials must meet tank and piping manufacturers’
specifications.
(8) The tank and piping system must pass a
one-tenth (0.1) gallon/hour system tightness
test before the system is brought in-operation.
The tank tightness test must be—
(A) A tank tightness test method listed and
conducted in accordance with the National
Work Group on Leak Detection Evaluations
certificate. To obtain a copy, download the
appropriate certificate from www.nwglde.org;
or
(B) A one-tenth (0.1) gallon/hour third
party certified test conducted using the automatic tank gauge with the tank at least ninety-five percent (95%) full.
(9) For tank system installations on or after
July 1, 2017, before the UST system is
brought in-operation—
(A) Spill and overfill prevention equipment
must be tested in accordance with 10 CSR
26-2.030;
(B) Secondary containment sumps must be
tested in accordance with 10 CSR 26-2.035;
and
(C) All release detection equipment must
be operability tested in accordance with 10
CSR 26-2.040 and 10 CSR 26-2.048.
(10) All new tanks must be tied down. Tiedown straps must meet the manufacturer’s
design specifications and be installed in locations and at a frequency prescribed by the
manufacturer.
(11) Until the installation is complete and the
system is released by the installer to the
owner/operator, the tank shall be monitored
for leaks daily by using either—
(A) An approved release detection method,
in accordance with 10 CSR 26-2.043; or
(B) Daily Inventory Liquid Measurements.
Upon completion of initial post-installation
tightness testing, daily measurements are
based on the average of two (2) consecutive
stick readings. A variation of no greater than
twenty-six (26) gallons per week is allowed.
Any suspected release, alarm, or inconclusive
or failure result from these release detection
methods must be reported and investigated in
accordance with 10 CSR 26-2.050.
(12) Upon the department’s discovery of an
installation that is not in compliance with the
requirements of this rule, the department’s
authorized representative may require that the
installation remain open and uncovered, or
that no additional UST system work be conducted, until—
(A) The manufacturer approves the installation that deviates from their written guidelines, specifications, and instructions;
(B) The owner approves the installation;
and
(C) The department approves the installation.
(13) Any equipment repairs necessary during
the installation must be manufacturer certified or approved, with supporting written
documentation from the manufacturer.
(14) Certification of Installation. All installers
must ensure that one (1) or more of the following methods of certification, testing, or
inspection is used to demonstrate compliance
with this rule by providing a certification of
compliance:
(A) The installation has been inspected and
approved by the department;
(B) All work listed in the manufacturer’s
installation checklists has been completed
and submitted to the department; or
(C) The installer has complied with another method for ensuring compliance with this
rule that is pre-approved by the department to
be no less protective of human health and the
environment.
AUTHORITY: section 319.105, RSMo 2016.*
Original rule filed April 15, 2011, effective
Dec. 30, 2011. Amended: Filed Aug. 15,
2016, effective May 30, 2017.
*Original authority: 319.105, RSMo 1989.