10 CSR 26-2.041
Requirements for Petroleum Underground Storage Tank Systems
PURPOSE: This rule outlines the options for
leak detection at petroleum underground storage tanks.
(1) Owners and operators of petroleum
underground storage tanks (UST) systems
that are in use must provide release detection
for tanks and piping as follows:
(A) Tanks. Tanks must be monitored at
least every thirty (30) days for releases using
one (1) of the methods listed in 10 CSR 262.043(1)(B)–(I), except that—
1. UST systems that meet standards in
10 CSR 26-2.020 or 10 CSR 26-2.021 and
the monthly inventory control requirements
in 10 CSR 26-2.043(1)(A) may use tank
tightness testing (10 CSR 26-2.043(1)(D)) at
least every five (5) years until December 22,
1998, or until ten (10) years after the tank is
installed or upgraded under 10 CSR 262.021(3), whichever is later;
2. Tanks with a capacity of two thousand
(2,000) gallons or less may use manual tank
gauging (10 CSR 26-2.043(1)(C));
3. Field-constructed tanks greater than
fifty thousand (50,000) gallons may use the
alternative release detection requirements in
10 CSR 26-2.046;
4. Groundwater monitoring (10 CSR 262.043 subsection (1)(G)) will no longer be
valid to monitor for releases after July 1,
2020;
5. Vapor monitoring (10 CSR 26-2.043
subsection (l)(F)) may not be used after July
1, 2020, as a release detection method unless
it is used with an added tracer chemical and
listed by the National Work Group on Leak
Detection Evaluations as a tank tightness test;
and
6. Tanks installed after July 1, 2017,
must be monitored for leaks at least every
thirty (30) days in accordance with 10 CSR
26-2.043(1)(H);
(B) Piping. Underground piping that routinely contains regulated substances must be
monitored for releases in a manner that meets
one (1) of the following requirements:
1. Pressurized piping. Underground piping that conveys regulated substances under
pressure must—
A. Be equipped with an automatic
line leak detector in 10 CSR 26-2.044(1)(A);
B. Have an annual line tightness test
conducted in accordance with 10 CSR 262.044(1)(B) or have monthly monitoring conducted in accordance with 10 CSR 262.044(1)(C); and
C. New or replaced piping installed
Substance Storage Tanks
after July 1, 2017, must be monitored for
releases at least every thirty (30) days in
accordance with 10 CSR 26-2.043 subsection
(1)(H);
2. Suction piping. Underground piping
that conveys regulated substances under suction must either have a line tightness test conducted at least every three (3) years and in
accordance with 10 CSR 26-2.044(1)(B) or
use a monthly monitoring method conducted
in accordance with 10 CSR 26-2.044(1)(C).
New or replaced piping installed after July 1,
2017, must be monitored for releases at least
every thirty (30) days in accordance with 10
CSR 26-2.043 subsection (1)(H). No release
detection is required for suction piping that is
designed and constructed to meet the following standards:
A. The below-grade piping operates
at less than atmospheric pressure;
B. The below-grade piping is sloped
so that the contents of the pipe will drain
back into the storage tank if the suction is
released;
C. Only one (1) check valve is included in each suction line;
D. The check valve is located directly
below and as close as practical to the suction
pump; and
E. A method is provided that allows
compliance with subparagraphs (1)(B)2.A.–
D. of this rule to be readily determined (for
example, the check valve can be visually
inspected); and
3. Gravity piping and remote fill piping
are exempt from the piping line leak detection
requirements in this section; and
4. Underground bulk piping associated
with airport hydrant fuel distribution systems
and field-constructed tanks must meet one (1)
of the following release detection requirements:
A. The requirements in subsection
(B) of this section; or
B. The alternative release detection
requirements in 10 CSR 26-2.047;
C. Underground bulk piping installed
after July 1, 2017, must meet the requirements in paragraph 1. or 2. of this subsection;
5. Except that—
A. Groundwater monitoring (10 CSR
26-2.043 subsection (l)(G)) will no longer be
valid to monitor for releases after July 1,
2020; and
B. Vapor monitoring (10 CSR 262.043 subsection (l)(F)) may not be used
after July 1, 2020, as a release detection
method unless it is used with an added tracer
chemical and listed by the National Work
Group on Leak Detection Evaluations as a
tightness test.
(2) High-throughput Facilities. In addition to
the requirements outlined in section (1) of
this rule, any owner of a tank or a multi-tank
connected or manifolded system that dispenses more than eight hundred thousand
(800,000) gallons of any regulated substance
in one (1) calendar month must use at least
one (1) of the following tank system release
detection methods:
(A) Continuous, electronic interstitial
monitoring for both tank and piping systems,
in accordance with 10 CSR 26-2.043(1)(H),
documenting passing readings at least once
every thirty (30) days; or
(B) Vapor monitoring, including introduced chemical marker monitoring, listed by
the National Work Group on Leak Detection
Evaluations (NWGLDE) for the substance
stored at least once every fifteen (15) days. To
obtain copies of equipment listings, contact
the National Work Group on Leak Detection
Evaluations, www.nwglde.org; or
(C) Continuous in-tank release detection,
which must include continual reconciliation
of tank system inventory. Standard statistical
inventory control is not acceptable. The
method used must meet criteria established
by the National Work Group on Leak
Detection Evaluations (NWGLDE) for continuous in-tank leak detection methods. To
obtain copies of equipment listings, contact
the National Work Group on Leak Detection
Evaluations, www.nwglde.org; or
(D) Another method approved by the
department specifically for high-throughput
UST systems.
AUTHORITY: sections 319.105, 319.107, and
319.137, RSMo 2016.* This rule originally
filed as 10 CSR 20-10.041. Original rule filed
April 2, 1990, effective Sept. 28, 1990.
Moved and amended: Filed April 15, 2011,
effective Dec. 30, 2011. Amended: Filed Aug.
15, 2016, effective May 30, 2017.
*Original authority: 319.105, RSMo 1989; 319.107, RSMo
1989, amended 1994; and 319.137, RSMo 1989, amended
1993, 1995, 2004.