11 CSR 40-2.030
Power Boilers
PURPOSE: This rule is to address the design, construction, installation, and operation of power boilers.
(1) As used in this rule, the term “these rules” is intended to
mean 11 CSR 40-2.010 through 11 CSR 40-2.065.
(2) Power Boilers Installed or Contracted for, Prior to November
12, 1986.
(A) The service life of any boiler of standard construction shall
be unlimited provided it meets the inspection requirements of
(B) The service life of any nonstandard boiler shall be thirty
(30) years. The thirty (30)-year life may be extended with the
chief inspector’s approval and compliance with the following
requirements:
1. The operating pressure cannot exceed the maximum
allowable working pressure (MAWP). The boiler MAWP shall be
calculated in accordance with American Society of Mechanical
Engineers (ASME) Section I Code or the requirements of the
original Code of construction. Boilers manufactured to a
standard other than the ASME Code shall be evaluated in
accordance with the “state special” requirements of 11 CSR
40-2.064. The allowable stress shall be no greater than twentytwo percent (22%) of the tensile strength of the material. If the
tensile strength is unknown, an allowable stress of twelve
thousand pounds per square inch (12,000 psi) shall be used.
The joint efficiency shall be in accordance with the appropriate
edition and addenda of the ASME Section I Code or the National
Board Inspection Code (NBIC);
2. Biennial pressure test shall be performed at or above
normal operating pressure, not to exceed the MAWP of the
boiler. The pressure test shall be held for at least thirty (30)
minutes and documented to the satisfaction of the inspector.
The inspector need not witness the test. If the boiler exhibits
any leaks, the boiler shall be repaired prior to restoring it to
service;
3. All safety devices and controls required by the ASME
Section I Code and these rules shall be installed and operable.
(3) Power Boilers Installed or Contracted for After November 12,
1986.
(A) New and second hand boilers shall be designed,
fabricated, and installed in accordance with the ASME Section
I Code and these rules.
(B) Reinstalled boilers may be of standard or nonstandard
construction and shall be installed in accordance with the
requirements of the ASME Code and these rules. Approval of
the chief inspector shall be obtained prior to reinstalling a
nonstandard boiler.
(4) Boiler external piping (BEP) shall be designed, fabricated,
and installed in accordance with the ASME Section I and B31.1
Codes. The piping is considered part of the boiler unit and need
not be separately tagged and inspected.
(A) Installations made, or contracted for, after November
12, 1986, shall meet the requirements of ASME Section I, and
B31.1 Codes and these rules for boiler external piping except as
follows:
1. BEP assembled by bolting, threading, or other mechanical means need not be installed by an ASME certificate holder
provided all of the following apply:
A. The MAWP of the boiler does not exceed one hundred
fifty (150) psi; and
B. The maximum pipe size does not exceed two inches
(2") nominal pipe size (NPS); and
C. The maximum operating temperature does not
exceed four hundred degrees Fahrenheit (400 °F); and
D. The piping is schedule 80 or greater SA-53 or SA-106
material; and
E. All valves, flanges, and fittings are American National
Standards Institute (ANSI) class 150 or greater; and
F. All welding, including attachments and seal welds are
by an ASME certificate holder; and
G. The completed installation is tested in accordance
with the American Society of Mechanical Engineers Code
Section I.
(B) Installations made prior to November 12, 1986, may
remain in service provided the installation is acceptable to the
inspector.
(5) General Requirements for Power Boilers.
(A) Boilers with heat input less than 12,500,000 British
thermal units per hour (Btu/hr) contracted after January 1, 2004,
shall meet the requirements of ASME CSD-1. Fuel gas piping for
these boilers shall comply with the requirements of National
Fire Protection Association (NFPA) 54. Oil burning equipment
shall comply with the requirements of NFPA 31. Single unit
boilers with heat input greater than or equal to 12,500,000
Btu/hr, boilers with pulverized fuel systems, and waste heat
boilers shall meet the requirements of NFPA 85. All controls
required by NFPA 85 for automatically fired boilers shall be
installed in accordance with the installation requirements of
ASME CSD-1. Existing installations are exempt from these rules
except that any modification or replacements to the controls
after January 1, 2004, shall meet the requirements for new
installations. Boilers installed on or after January 1, 2010, must
be in accordance with the National Board Inspection Code, Part
1, and these rules.
(B) A pressure-reducing valve is required in the fluid supply to
a boiler when the fluid supply pressure exceeds the maximum
allowable working pressure of the boiler. All devices shall
operate so as to protect the lowest pressure rated object from
an over pressure condition.
(C) Blowoff/blowdown equipment shall meet the requirements
of the National Board Rules and Recommendations for the
Design and Construction of Boiler Blowoff Systems. Blowoff
tanks shall be constructed to the ASME Section VIII, Division
1 Code.
(D) All safety and safety relief valve outlets shall be piped to
a safe discharge. There shall be no valves on the outlet piping
or between the boiler and the safety or safety relief valve inlet.
The end of all discharge piping shall be visible to the operator
when piped into a drain. Drains on safety or safety relief valve
bodies shall remain open at all times. Safety or safety relief
valve inlets and outlets shall not be reduced. Weighted-lever
safety valves are prohibited. Safety valves with either the seat
or disk of cast iron are prohibited. The minimum valve capacity
shall be in accordance with ASME Section I Code. Alternatively,
the capacity shall be determined based on the burner output
rating or by multiplying the heating surface in square feet by
the applicable value in the following table.
Minimum Pounds of Steam per Hour per Square Foot of
Heating Surface
Fire Tube
Water Tube
Boiler
Boiler
Boiler
Hand fired
5
6
Stoker fired
7
9
Oil, gas, pulverized
fuel fired
8
10
Waterwall
Hand fired
8
8
Stoker fired
10
12
Oil, gas, pulverized
fuel fired
14
16
When a boiler is fired only by a gas having a heat value not in
excess of two hundred British thermal units per cubic foot (200
Btu/cu. ft.), the minimum safety or safety relief valve capacity
may be based on the value given for hand fired boilers. The
minimum safety or safety relief valve capacity for electric
boilers shall be 3.5 pounds per hour per kilowatt input.
(E) Each boiler shall be safely supported. There shall be no
excessive vibration in either the boiler or the connecting
piping.
(F) All existing boilers shall have adequate clearance on all
sides and top to facilitate repair, maintenance, and inspection.
Boilers installed or reinstalled on or after January 1, 2010, shall
meet the following requirements:
1. There shall be at least thirty-six inches (36") of clearance
on each side of the boiler. Boilers in battery shall not be
installed any closer than forty-eight inches (48"). The front and
rear of the boiler shall not be located nearer than thirty-six
inches (36") from any wall or structure;
2. Boilers shall be installed to allow for removal and
installation of tubes;
3. Boilers with top-opening manholes shall have at least
eighty-four inches (84") of unobstructed clearance above the
manhole to the ceiling of the boiler room;
4. Boilers without top-opening manholes shall have at least
thirty-six inches (36") clearance from the top of the boiler; and
5. Boilers with bottom openings used for inspection
or maintenance shall have at least twelve inches (12") of
unobstructed clearance.
6. Note: Alternatively, clearances in accordance with the
manufacturer’s recommendations are subject to the approval
of the chief inspector.
(G) All rooms containing boilers and/or water heaters with
a combined capacity over one (1) million Btu/hr and over five
hundred (500) square feet floor area shall have at least two (2)
exits remotely located from each other.
(H) Ladders and runways shall be provided between or over
the top of boilers installed or reinstalled on or after January
1, 2010, that are more than eight feet (8') above the operating
floor to afford accessibility for normal operation, maintenance,
and inspection. These ladders and runways must be built and
installed in accordance with the National Board Inspection
Code, Part 1.
(I) Combustion air—The boiler room shall have an adequate
air supply to permit clean, safe combustion, minimize soot
formation, and maintain a minimum of nineteen and onehalf percent (19.5%) oxygen in the air of the boiler room.
The combustion and ventilation air shall be supplied by an
unobstructed opening or by power ventilation or fans.
1. Unobstructed air openings shall be sized on the basis of
one (1) sq. in. (6.50 sq. mm) free area per two thousand British
thermal units per hour (2,000 Btu/hr) (five hundred eightysix watts per hour (586 W/hr)) maximum fuel input of the
combined burners located in the boiler room or as specified in
the National Fire Protection Association (NFPA) standards for oil
and gas burning installations for the particular job conditions.
The boiler room air supply openings shall be kept clear at all
times.
2. Power ventilators or fans shall be sized on the basis of
0.2 cfm (.0057 cubic meters per minute) for each one thousand
British thermal units per hour (1,000 Btu/hr) (two hundred
ninety-three watts per hour (293 W/hr)) of maximum fuel input
for the combination burners of all boilers located in the boiler
room. Additional capacity shall be required for any other fuel
burning equipment in the boiler room.
3. When power ventilators or fans are used to supply
combustion air, they shall be installed with interlock devices so
that the burners will not operate without an adequate number
of ventilators/fans in operation.
4. When combustion air is supplied to the boiler by an
independent duct, with or without the employment of power
ventilators or fans, the duct shall be sized and installed in
accordance
with
the
manufacturer’s
recommendations.
However, ventilation of the boiler room must still be considered.
5. Care should be taken to ensure that steam and water
lines are not routed across combustion air openings, where
freezing may occur.
6. Opening boiler room door(s) and/or window(s) is
unacceptable for supplying combustion air.
(J) Controls—
1. Oil-fired, gas-fired, and electrically heated boilers shall
be equipped with suitable primary (flame safeguard) safety
controls, limit switches, and burners or electric elements that
are labeled and listed by a nationally or internationally recognized standard.
2. All controls and devices shall be installed in accordance
with the manufacturer’s recommendations, and/or industry
standards, as applicable.
3. All automatically fired boilers shall have a disconnecting
means capable of being locked in the open position and shall
be installed at an accessible location in the same room as the
object. This disconnect means shall disconnect all sources of
potential from the object.
4. A manually operated remote shutdown switch or
circuit breaker shall be located just outside the entrance door
of the room the object is located in and be marked for easy
identification. Consideration should be given to the type and
location of the switch to safeguard against tampering. If the
entrance door is on the building exterior, the switch should be
located just inside the door. If there is more than one (1) door
to the room, there should be a switch located at each door.
The emergency switch must be installed in accordance with
the manufacturer’s instructions or a nationally recognized
standard and must cause a safety shutdown and lockout.
(K) Code nameplates shall remain readily accessible at
all times. Loose or missing nameplates shall be replaced or
reattached as provided for in the NBIC.
(L) Rental boilers used for temporary service shall meet all of
the requirements of these rules.
AUTHORITY: section 650.215, RSMo 2000.* Original rule filed
May 12, 1986, effective Oct. 27, 1986. Amended: Filed Dec. 1, 1987,
effective Feb. 11, 1988. Amended: Filed Sept. 27, 1990, effective
Feb. 14, 1991. Amended: Filed Oct. 3, 1995, effective April 30,
1996. Rescinded: Filed March 10, 2003, effective Aug. 30, 2003.
Readopted: Filed Sept. 25, 2002, effective May 30, 2003. Amended:
Filed Jan. 12, 2006, effective June 30, 2006. Amended: Filed June
30, 2009, effective Feb. 28, 2010.
*Original authority: 650.215, RSMo 1984, amended 1990, 1993, 1995.