6 MAC Pt. 1, R. 10.6
Highway Project Construction Options
Cite as 6 Miss. Admin. Code Pt. 1, R. 10.6
Highway Project Construction Options. There are three options for Highway Project
construction: construction by MDOT; construction by a Local Entity on a state designated
highway; and construction by a Local Entity on a non-state designated highway. The application
process and construction regulations for each are as follows:
A. Construction by the Department of Transportation:
(i) The Local Entity where the Highway Project is located must submit three (3)
copies of an application to MDA providing the following information:
(ii). A description of the Highway Project including estimates of all cost
related to construction and annual maintenance.
(iii). A certified resolution from the governing authority of the Local Entity
detailing the source and amount of funds which the Local Entity has
committed, or is willing to commit, for the Highway Project and a
request for MDOT to do the construction.
(iv). A certified copy of a signed letter of intent from the private company
to the Local Entity describing in detail the following:
(a). The Company Project
(b). The proposed timetable for completion of the Company Project
(c). The number of jobs to be created
(d). The dollar investment to be made by the company
(e). A guarantee from the company of the investment at the Company
Project location
(v). A demonstration that the company is financially sound and appears to have
assets and creditworthiness to secure necessary funds to complete the Company
Project.
(vi). An estimate by the company of the number, size, and weight of motor
vehicles and frequency of travel of such vehicles upon the Highway Project.
(vii) A statement from the company that the proposed Highway Project design
will meet the company's needs.
(viii). MDA will forward a copy of the application to MDOT for their evaluation.
(ix). MDOT will provide MDA with an estimate of how much the Highway
Project will cost and request a certification that EDH Funds are available for the
project.
(x). Upon approval by MDA, MDOT will be responsible for all Highway Project
design, engineering and construction.
(xi). Any changes or modifications to the approved plans, which would affect the
cost of the Highway Project, must be approved by MDOT and MDA
(xii). MDOT will certify to MDA when all charges are final and the Highway
Project is officially completed.
B. Construction by a Local Entity on a State Designated Highway. In accordance with an
agreement between MDA and MDOT, State Aid assists in the administration of these
projects:
(i). The Local Entity must submit four (4) copies of an engineering study based
on an RWD-600, which sets out the criteria for the design and meets the
requirements of the Act. The engineering study shall also contain an estimate of
costs based on the design criteria. These documents shall be sent to State Aid for
review and forwarding to MDOT and MDA.
(ii). MDOT, after evaluating the engineering study and the RWD-600 based on
typical average cost per mile for similar projects, will provide State Aid with its
comments or approval.
(iii). State Aid will notify the Local Entity and MDA that the design criteria has
been approved or needs revision. Upon final approval by MDOT and notification
to MDA of such approval, the Local Entity may proceed with the application.
(iv). The Local Entity must prepare and submit to MDA two (2) copies of an
(v). application, which provides the following information:
(a). A description of the Highway Project, including an estimate of the
annual maintenance cost.
(b). A certified resolution from the governing authorities of the Local
Entity detailing the source and amount of funds which the Local Entity has
committed, or is willing to commit, for the Highway Project and a
statement of intent to perform the highway construction.
(c). A certified copy of a signed letter of intent from the private company
to the Local Entity describing in detail the following:
(i). The Company Project
(ii). The proposed timetable for completion of the Company Project
(iii).The number of jobs to be created
(iv). The dollar investment to be made by the company A guarantee
from the company of the investment at the Company Project location
(d). A demonstration that the company is financially sound and appears to
have assets and creditworthiness to secure necessary funds to complete the
project.
(e). An estimate by the company of the number, size, and weight of motor
vehicles and frequency of travel of such vehicles upon the Highway
Project.
(f). A statement from the company that the proposed Highway Project
design will meet the company's needs.
C. MDA will consider the application and determine if it meets the program
requirements. All parties will be notified of MDA's action. NOTE: Engineering and other
costs incurred prior to submission and approval of completed applications will be the
responsibility of the Local Entity.
D. State Aid will submit a Program Form to the Local Entity and request that a program
be executed by the Local Entity and returned to State Aid. This program will be reviewed
and approved by State Aid and copies submitted to MDOT and MDA.
E. The project engineer will be selected by the Local Entity and shall be entitled to
compensation based on the EDH Program Engineer Fee Schedule. The project engineer
will be responsible for coordinating the project between State Aid, MDA, MDOT and the
Local Entity during all phases of plan development and construction.
F. An engineering contract will be entered into by MDA, State Aid, the Local Entity and
the project engineer. Upon approval by State Aid, copies will be submitted to all parties.
NOTE: All costs associated with preliminary and construction engineering incurred after
approval of the program and engineering contract are eligible for MDA participation.
G. The project engineer will be responsible for plan development and all regulatory
permits. Plan preparation will be based on the latest approved specifications as developed
and approved by State Aid.
H. The project engineer will submit three (3) sets of preliminary plans to State Aid for
distribution and review prior to scheduling a field inspection (PS&E).
I. Following review of plans, State Aid will require any necessary revisions to be made
and, upon satisfactory review, schedule a field inspection. The field inspection party will
include representatives from State Aid; Construction Division, MDOT; Roadway Design
Division, MDOT; District, MDOT; the project engineer; and representatives from the
Local Entity.
J. The project engineer will be responsible for making any revisions resulting from the
field inspection and will return five (5) sets of revised full-scale plans to State Aid.
K. The Local Entity will comply with the National Environmental Policy Act, and all
submittals shall be made to State Aid for review and approval.
L. The Local Entity will be responsible for acquisition of rights-of-way in accordance
with the Uniform Relocation Assistance and Real Property Acquisition Policies Act, both
state and federal.
M. Following review of full-scale plans, State Aid, in conjunction with MDOT, will
schedule and conduct an office review with all representatives in item 11 above.
N. The project engineer will make any revisions resulting from the office review and
submit completed construction plans (small scale), preliminary estimate, and necessary
documents to State Aid.
O. Upon approval of all right-of-way certifications and regulatory permits, State Aid will
authorize the Local Entity to advertise for receipt of bids. Bids will be evaluated and
contracts awarded in accordance with governing statutes. Work will begin when the
award of a contract is approved and the project fund is established by MDA. MDA will
determine if funding is within the budget based on the contract amount at the time of
letting (MDA commitment and county funding).
P. Monthly estimates, with quantities measured in accordance with the contract
provisions, will be submitted to State Aid. State Aid will check each estimate and submit
it to MDA.
Q. Engineering estimates will be submitted on a monthly basis and, after review by State
Aid, will be submitted to MDA. (See Disbursement of Funds section.)
R. The project engineer will review and recommend to State Aid any construction
change order or supplemental agreement that will increase funding above the contract
amount and forward such recommendation to State Aid for its approval. State Aid will
review and forward its recommendation to MDOT, when appropriate. MDOT will review
and recommend to MDA approval for changing the contract amount above the original
construction bids and/or any engineering agreement cost. MDA will notify State Aid of
its concurrence with changes to contracts.
S. Final inspection of the completed highway project will be made by State Aid, MDOT,
and the Local Entity.
T. Construction by a Local Entity on a Non-State Designated Highway. Highway
Projects to be constructed on non-state designated highways will be built to State Aid
Road Construction Standards and will be administered by State Aid.
(i). The Local Entity must submit three (3) copies of an application and
engineering study to MDA.