6 MAC Pt. 1, R. 10.7
Application Requirements
Cite as 6 Miss. Admin. Code Pt. 1, R. 10.7
Application Requirements. The application should provide the following information:
A. A description of the Highway Project.
B. A certified resolution from the governing authorities of the Local Entity detailing the
source and amount of funds which the Local Entity has committed, or is willing to
commit, for the Highway Project and a statement of intent to perform the highway
construction.
C. A certified copy of a signed letter of intent from the private company to the Local
Entity describing in detail the following:
(i). The Company Project
(ii). The proposed timetable for completion of the Company Project
(iii) The number of jobs to be created
(iv). The dollar investment to be made by the company
(v). A guarantee from the company of the investment at the Company Project
location
D. A demonstration that the company is financially sound and appears to have assets and
creditworthiness to secure necessary funds to complete the project.
E. An estimate by the company of the number, size, and weight of motor vehicles and
frequency of travel of such vehicles upon the Highway Project.
F. A statement from the company that the proposed Highway Project design will meet
the company's needs.
Source: Miss. Code Ann. ยง 65-4-1 et seq. (Rev. 2005)
Rule10.8 Requirements for Engineering Study
A. The engineering study should establish the proposed road design and alignment, and
meet State Aid Road Construction Standards. The engineering study must provide a
breakdown of all costs based on the design criteria.
B. MDA will forward the application and engineering study to State Aid for their
evaluation. State Aid will contact the Local Entity with any questions or comments it
may have concerning the design.
C. State Aid, after evaluating the engineering study, will provide MDA with its approval
of the proposed plan and cost estimate.
D. MDA will consider the application and determine if it meets the program
requirements. All parties will be notified of MDA's action. NOTE: Engineering and other
costs incurred prior to submission and approval of completed applications will be the
responsibility of the Local Entity.
E. State Aid will submit a Program Form to the Local Entity and request that a program
be executed by the Local Entity and returned to State Aid. This program will be reviewed
and approved by State Aid and copies submitted to MDA.
F. The project engineer will be selected by the Local Entity and shall be entitled to
compensation based on the EDH Program Engineer Fee Schedule (See Exhibit A). The
project engineer will be responsible for coordinating the project between State Aid,
MDA, and the Local Entity during all phases of plan development and construction.
NOTE: All costs associated with preliminary and construction engineering incurred after
approval of the program and the engineering contract are eligible for MDA participation.
G. The project engineer will be responsible for plan development and all regulatory
permits. Plan preparation will be based on the latest approved specifications as developed
and approved by State Aid for State Aid Projects.
H. The project engineer will submit one (1) set of preliminary plans to State Aid for
distribution and review prior to scheduling a field inspection (PS&E).
I. Following review of plans, State Aid will require any necessary revisions to be made
and, upon satisfactory review, schedule a field inspection. The field inspection party will
include representatives from State Aid, the project engineer, and the Local Entity.
J. The project engineer will be responsible for making any revisions resulting from the
field inspection and will return one (1) set of revised full-scale plans to State Aid for
office review.
K. The project engineer will make any revisions resulting from the office review and
submit completed construction plans (small scale), preliminary estimate, and necessary
documents to State Aid.
L. Upon approval of all right-of-way certifications and regulatory permits, State Aid will
authorize the Local Entity to advertise for receipt of bids. Bids will be evaluated and
contracts awarded in accordance with governing statutes. Work will begin when the
award of a contract is approved and the project fund is established by MDA. MDA will
determine if funding is within the budget based on the contract amount at the time of
letting (MDA commitment and county funding).
(i). Monthly estimates, with quantities measured in accordance with the contract
provisions, will be submitted to State Aid. State Aid will check each estimate and
submit it to MDA.
(ii). Engineering estimates will be submitted on a monthly basis and, after review
by State Aid, will be submitted to MDA. (See Disbursement of Funds section.)
M. The project engineer will review and recommend to State Aid any construction
change order or supplemental agreement that will increase funding above the contract
amount and forward such recommendation to State Aid for its approval. State Aid will
review and forward its recommendation to MDA. MDA will notify State Aid of their
concurrence in all changes to contracts.
N. Final inspection of the completed highway project will be made by State Aid, MDA,
and the Local Entity.
O. State Aid will certify to MDA that all charges are final and establish a date upon
which the Highway Project is officially closed.
P. MDA will notify the Local Entity of the project completion and of the date the Local
Entity will become responsible for maintenance.