NDAC 43-02-05-07
Mechanical integrity
Cite as N.D. Admin. Code ยง 43-02-05-07
1.
Prior to commencing operations, the operator of a new injection well must demonstrate the
mechanical integrity of the well. Prior to performing any workover project on an existing well,
during which the packer or other means of annular isolation could be affected, the operator
shall obtain approval from the director. All existing injection wells must demonstrate continual
mechanical integrity and be tested at least once every five years. Following the completion of
any remedial work, the operator shall demonstrate the mechanical integrity of the well. The
director may require further mechanical integrity tests or other remedial work to ensure the
mechanical integrity of the well to prevent the movement of fluid into an underground source
of drinking water or an unauthorized zone. Mechanical integrity pressure tests must be
performed at one thousand pounds per square inch [6900 kilopascals] for a minimum of fifteen
minutes. A mechanical integrity test pressure of less than one thousand pounds per square
inch [6900 kilopascals] may be approved by the director. Once an injection well is determined
to lack mechanical integrity, within ninety days of the determination, it must be repaired and
retested or plugged and abandoned.
An injection well has mechanical integrity if:
a.
There is no significant leak in the casing, tubing, or packer; and
b.
There is no significant fluid movement into an underground source of drinking water or an
unauthorized zone through vertical channels adjacent to the injection bore.
2.
One of the following methods must be used to evaluate the absence of significant leaks:
a.
Pressure test with liquid or gas.
b.
Monitoring of positive annulus pressure following a valid pressure test.
c.
Radioactive tracer survey.
3.
One of the following methods must be used to establish the absence of significant fluid
movement:
a.
A log from which cement can be determined or well records demonstrating the presence
of adequate cement to prevent such migration.
b.
Radioactive tracer survey, temperature log, or noise log.
4.
The operator of an injection well immediately shall shut-in the well if mechanical failure
indicates fluids are, or may be, migrating into an underground source of drinking water or an
unauthorized zone, or if so directed by the director.