510-RICR-00-00-8
510-RICR-00-00-8. RISBC-8 Rhode Island Energy Conservation Code (version Amendment, 07/01/2010 to 07/01/2013)
RHODE ISLAND
STATE BUILDING CODE
SBC-8 State Energy Conservation Code
Effective July 1, 2010
Replaces Regulation SBC-8
Dated January 1, 2007
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
Department of Administration
BUILDING CODE STANDARDS COMMITTEE
One Capitol Hill
Providence, Rhode Island 02908-5859
(401) 222-3033
FAX No. (401) 222-2599
www.ribcc@ri.gov
11th EDITION
RISBC-8
RISBC-8
Regulation SBC-8
State Energy Conservation Code
July 1, 2010
The Building Code Standards Committee, in accordance with the rule making authority of Title 23,
Chapter 23-27.3, Section 109.1, paragraphs a through c inclusive, has formally adopted and
promulgated as the Rhode Island State Building Code, the provisions of the International Energy
Conservation Code, 2009 edition, as published by the International Code Council, Inc. (I.C.C.),
together with amendments thereto hereinafter set forth to the articles and sections of this code:
The provisions of Title 23, Chapter 27.3 of the General Laws of Rhode Island establishing
administration and enforcement are hereby incorporated by reference. Regulatory Administration
Chapter 1 immediately follows and is supplemental to the General Laws.
Editorial Note: Code users please note:
When purchasing or using the State Energy Conservation Code 2010 code, please take note of the
particular printing edition. Errata to that printing edition is available on-line directly at no charge
at www.iccsafe.org/cs/codes/pages/errata.aspx or call the office of the State Building Code
Commissioner at 401-222-1129 for further information.
Printed copies of the administrative and enforcement provisions of Title 23, Chapter 27.3 are
available at the Office of the State Building Code Commission or on-line at
http://www.rilin.state.ri.us/Statutes/TITLE23/23-27.3/INDEX.HTM.
The State Energy Conservation Code, 2009 Edition, is protected by the copyright that has been
issued to the ICC. As a result, the State Building Code is not available in complete form to the
public in an electronic format. The State Energy Conservation Code 2010 edition that is referred to
within is contained in a printed volume and is also in an electronic format that have been published
by the ICC under an exclusive license.
The Office of the State Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the month of June 2010 so that
local officials will have access to the code prior to the implementation of these rules on July 1,
2010.
In order to assure public access to this code the Office of the State Building Code Commissioner
shall provide a copy of this code to the Rhode Island State Library, which is located on the second
floor of the State House. In addition, all codes may be viewed during business hours at the
Department of Administration’s Library which is located on the fourth floor of the William E.
Powers Building, One Capitol Hill, Providence.
The Legislative Regulation Committee approved adoption of this code on March 4, 2010.
By:
John P. Leyden
Executive Secretary
Rhode Island Building Code Standards Committee
i
RISBC-8
STATE OF RHODE ISLAND
BUILDING CODE STANDARDS COMMITTEE
CHAIRMAN
VICE CHAIRMAN
Robert M. Stillings
Architect
Bruce Davey, PE
Structural Engineer
EXECUTIVE COMMITTEE
John Pagliaro
Building Official
William J. Nash, Jr.
Building Official
Bernard J. Bernard, III
Electrical Inspector
Doris Aschman
Public Health Official
William Howe
Fire Official
Alan Durand
Builders Trades Council
Stephen C. Turner, PE
Public Member
Russell Brown
Building Official
Dana Newbrook
Architect
James R. Carlson, RA
Public Member
Michael A. Newman
Master Plumber
G. Thomas Chabot
Electrical Contractor
David F. Palmisciano
Building Trades Council
Randy Collins, Jr., RLA
Landscape Architect
Gordon W. Preiss, PE
Mechanical Engineer
Robert E. DeBlois, Jr.
Builder
Barrie K. Balemian
Builder
Paul DePace, PE
Representative for the Disabled
Vacant
Representative for the Disabled
James Fink
Electrical Engineer
John P. Leyden, CBO
State Building Commissioner
Executive Secretary
Donald Gagnon
Minimum Housing Inspector
Thomas Coffey
Legal Counsel
ii
RISBC-8
STATE BUILDING CODE REGULATIONS – 2010
The following list includes all regulations promulgated by the State Building Code
Standards Committee. All regulations are available for a fee at the State Building
Commission.
1.
Building Code
SBC-1-2010
2.
One and Two Family Dwelling Code
SBC-2-2010
3.
Plumbing Code
SBC-3-2010
4.
Mechanical Code
SBC-4-2010
5.
Electrical Code
SBC-5-2009
6.
Property Maintenance Code
SBC-6-2010
7.
Reserved
8.
Energy Conservation Code
SBC-8-2010
9
Enforcement and Implementation Procedures for Projects
Under the Jurisdiction of
The State of Rhode Island
SBC-9
10.
Code Interpretations
SBC-10
11.
Certification of Building Officials,
Building, Electrical, Plumbing and Mechanical Inspectors
SBC-11-2010
12.
New Materials and Methods of Construction
SBC-12
13.
State Building Code for Existing Schools
SBC-13
14.
Reserved
15.
Reserved
16.
Reserved
17.
Public Buildings Accessibility Meeting Standards
SBC-17
18.
Native Lumber
SBC-18
19.
Fuel Gas Code
SBC-19-2010
iii
Format: These code changes follow numbering sequence and topics of the
INTERNATIONAL ENERGY CONSERVATION CODE 2009 (first printing). All Provisions
of IECC 2009 are retained unless indicated as deleted or revised. Published errata are
available from the ICC website dependent on the printing issue number and date.
Chapter 1
ADMINISTRATION
Revise IECC section 101.1, Title, to read as follows:
101.1 Title: These regulations shall be known as the State Energy Conservation Code
Regulation SBC-8 - 2010 hereafter referred to as "this code”.
Add the following new section 101.1.1 referenced codes.
101.1.1 Referenced Codes. The other codes listed in Sections 101.4.1 through 101.4.7 and
referenced elsewhere in this code shall be considered part of the requirements of this code to
the prescribed extent of each such reference.
1.
Electrical. The provisions of Rhode Island State Electrical Code SBC-5-2008 shall
apply wherever referenced in this code as the ICC Electrical Code, and shall apply to
the installation of electrical systems, including alterations, repairs, replacement,
equipment, appliances, fixtures, fittings, and appurtenances thereto.
2.
Gas. The provisions of the Rhode Island State Fuel Gas Code SBC-19-2010 shall
apply wherever referenced in this code as the International Fuel Gas Code, and shall
apply to the installation of gas piping from the point of delivery, gas appliances and
related accessories as covered in this code. These requirements apply to gas piping
systems extending from the point of delivery to the inlet connections of appliances and
the installation and operation of residential and commercial gas appliances and related
accessories.
3.
Mechanical. The provisions of the Rhode Island State Mechanical Code SBC-4-2010
shall apply wherever referenced in this code as the International Mechanical Code and
shall apply to the installation, alterations, repairs and replacement of the mechanical
systems, including equipment, appliances, fixtures, fittings and/or appurtenances,
including ventilating, heating, cooling, air-conditioning and refrigeration systems,
incinerators and other energy-related systems.
RI-SBC-8
4.
Plumbing. The provisions of Rhode Island State Plumbing Code SBC-3-2010 shall
apply wherever referenced in this code as the International Plumbing Code, and shall
apply to the installation, alteration, repair and replacement of plumbing systems,
including equipment, appliances, fixtures, fittings and appurtenances, and where
connected to a water or sewage system and all aspects of a medical gas system.
5.
Property Maintenance. The provisions of the Rhode Island State Property
Maintenance Code SBC-6-2010 Provides requirements for continued use and
maintenance buildings and property, and of related plumbing, mechanical, electrical
and fire protection systems in existing
residential nonresidential structures.
6.
Fire Prevention Code. Wherever and whenever provisions of the Internatinal Fire
Code 2009 editions are referenced, the appropriate Rhode Island Fire Safety Code
requirements shall apply.
7.
Building Code. The provisions of the Rhode Island State Building Code SBC-1-2010
shall apply wherever referenced in this code as the International Building Code, and
shall apply to all matters governing the design and construction of buildings.
8.
Existing Building Code. The provisions of the State Building Codes SBC-1-2010 in
conjunction with the State Rehabilitation Code SRC-1 and the Rhode Island Fire
Safety Code shall apply wherever referenced in this code as the International Existing
Building Code.
Any and all such references to the various International Code Council family of code
shall be substituted for the appropriate state code as indicated above.
RI-SBC-8
Chapter 3
Climate Zones
Delete section 301 in its entirety and substitute the following.
Section 301
Climate Zones
301.1 General Rhode Island shall be considered as climate zone 5A with the following design
conditions.
Table 301.1 Delete and substitute the following:
Table 301.1
Exterior Design Conditions.
Value
Value
Climate zone
Providence County
All others
Winter, design dry-bulb (degree F)
0
5
Summer, design dry-bulb
87
89
Summer design wet-bulb
71
73
Degree days heating
6831
5950
Degree days cooling
371
811
RI-SBC-8
Add the Following Figure 301
RI-SBC-8
Delete without substitution section 301.2 and 301.3
Delete table 301.3(2) and substitute the following
TABLE 301.3(2)
RHODE ISLAND CLIMATE ZONE DEFINITION
THERMAL CRITERIA
Zone
Number
IP UNITS
SI UNITS
5
5400 ,HDD650F≤ 7200
3000 < HDD180C ≤ 4000
RI-SBC-8
Chapter 4
401.2 Add the following:
401.2 Compliance. Projects shall comply with Sections 401, 402.4, 402.5, and 403.1, 403.2.2,
and 403.3 through 403.9 (referred to as the mandatory provisions) and either:
1. Sections 402.1 through 402.3, 403.2.1 and 404.1 (pre-scriptive): or
2. Section 405 (performance) or
1. Compliance submission of Res-Check for Zone 5 and Chapter 4 mandatory
requirements.
401.3 Certificate: Add the following
A certificate similar to this shall be attached to or near the electrical panel board.
ENERGY CERTIFICATE
STREET ADDRESS: _____________________________________________
CITY/TOWN: _____________________________________________
PREDOMINANT VALUES:
R VALUE CEILING/ROOF _____________
R VALUE WALLS _____________
R VALUE FOUNDATION _____________
R VALUE DUCTS Outside conditioned space _____________
U FACTOR FENESTRATION _____________
SHGC Fenestration _____________
Gas Fired un-vented room heater _____________ ___________
Yes No
Baseboard Electric heater _____________ ___________
Yes No
Electric Furnace _____________ ___________
Yes No
U FACTOR SKYLIGHT
SHGC skylight _____________
Efficiency and type of heating equipment _____________
Efficiency and type of cooling equipment _____________
Efficiency and type of service water heater _____________
CERTIFICATE COMPLETED BY BUILDER/REGISTERED DESIGN PROFESSIONAL
___________________________________
SIGNATURE
RI-SBC-8
Table 402.1.1 delete and substitute the following
TABLE 402.1.1
INSULATION AND FENESTRATION REQUIRMENTS BY COMPONENTa
CLIMATE
ZONE
FERNESTRAT
ION
U-FACTORb
SKYLIGHTb
U-FACTOR
GLAZED
FERNESTRAT
ION
SHGCb
CEILING
R-VALUE
WOOD
FRAME
WALL
R-VALUEg
MASS WALL
R-VALUE
FLOOR
R-VALUE
BASEMENTC
WALL R-
VALUE
SLABd
R-VALUE
& DEBTTH
CRAWL
SPACEC WALL
R-VALUE
5
0.35
0.60
NR
38
20 or 13+5f
13/17
30e
10/13
10.2 ft
10/13
For SI: 1 foot = 304.8 mm.
a. R-values are minimums U-factors and SHGC are maximums. R-19 batts compressed into a nominal 2 × 6 framing cavity
such that the R-
value is reduced by R-1 or more shall be marked with the compressed batt R-value in addition to the full thickness R-value.
b. The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration.
c. “10/13” means R-10 continuous insulated sheathing on the interior or exterior of the homeor R-13 cavity insulation at the
interior of the
basement wall.
d. R-5 shall be added to the required slab edge R-values for heated slabs
e. Or insulation sufficient to fill the framing cavity, R-19 minimum.
f. “13+5” means R-13 cavity insulation plus R-5 insulated sheathing. If structural sheathing covers 25 percent or less of the
exterior,
insulating sheathing is not required where structural sheathing is used. If structural sheathing covers more than 25 percent
of exterior,
structural sheathing shall be supplemented with insulated sheathing of at least R-2.
g. The second R-value applies when more than half the insulation is on the interior of the mass wall.
Delete in its entirely table 402.1.3 and substitute the following
TABLE 402.1.3
EQUIVALENT U-FACTORSa
CLIMATE
ZONE
FENESTRATION
U-FACTOR
SKYLIGHT
U-FACTOR
CEILING
U-
FACTOR
FRAME
WALL
U-
FACTOR
MASS
WALL
U-
FACTORb
FLOOR
U-
FACTOR
BASEMENT
WALL U-
FACTORc
CRAWL
SPACE
WALL
U-
FACTORc
5
0.35
0.60
0.030
0.057
.060
0.082
0.033
0.059
0.065
a. Nonfenestration U-factors shall be obtained from measurement, calculation or an
approved source.
b. When more than half the insulation is on the interior, the mass wall U-factors shall be a
and the same as the frame wall U-factor
c. Foundation U-factor requirements shown in Table 402.1.3 include wall construction
and interior air films but exclude soil conductivity and exterior air films.
U-factors for determining code compliance in accordance with Section 402.1.4
(total U Alternative) of Section 405 (Simulated Performance Alternative) shall be
modified to include soil conductivity and exterior air films.
402.1.4 Total UA alternative Delete and substitute
RI-SBC-8
402.1.4 Total UA alternative. If the total building thermal envelope UA (sum of U-factor
times assembly area) is less than or equal to the total UA resulting from using the U-factors in
Table 402.1.3 (multiplied by the same assembly area as in the proposed building), the building
shall be considered in compliance with Table 402.1.1. The UA calculation shall include the
thermal bridge effects of framing materials. The UA calculation shall include the thermal
bridging effects of framing materials. The SHGC requirements shall be met in addition to UA
compliance.
Add the following section:
403.10 Minimum equipment performance. Heating and cooling equipment shall have
minimum equipment performance as indicated in Table 403.1.
RI-SBC-8
TABLE 403.1
MINIMUM EQUIPMENT PERFORMANCE
EQUIPMENT
CATEGORY
SUBCATEGORY
REFERENCED
STANDARD
MINIMUM
PERFORMANCE
Maximum
Electricity
Ratio
Natural Gas and propane
fired furnaces
DOE 10CFR Part 430
Subpart B Appendix N
AFUE 90%b
2%
Oil Fired Furnace
<94,00 BTU/hr
DOE 10CFR Part 430
Subpart B Appendix N
AFU 83%b
2%
Oil Fired Furnace
>94,000 BTU/hr
DOE 10CFR Part 430
Subpart B Appendix N
AFU 83%b
2.3%
Natural Gas, Oil and Propane Fired
Steam Boilers
DOE 10CFR Part 430
Subpart B Appendix N
AFU 82%b,c
NA
Air-cooled heat pumps, Heating
mode<65,000 Btu/h cooling
capacity
Split systems
Single package
ARI 210/240
8 HSPFa,b
7.6 HSPFa,b
Air-cooled air conditioners and
heat pumps, Cooling mode
<65,000 Btu/h cooling capacity
Split systems
Single package
ARI 210/240
13.0 SEERb
12.0 SEERb
For SI: 1 British thermal unit per hour = 0.2931 W.
a.
For multi-capacity equipment, the minimum performance shall apply to each capacity step
provided. Multi-capacity refers to manufacturer-published ratings for more than one capacity mode
allowed by the product’s controls.
b.
This is used to be consistent with the National Appliance Energy Conservation Act (NAECA) of
1987 (Public Law 100-12).
Except for gas-fired steam boilers for which the minimum AFUE shall be 75 percent
Delete and substitute footnote e and f in table 405.5.2(1)
e. Tested envelope leakage shall be determined and documented by an independent party
approved by the code official. Hourly calculations shall be used to determine the energy
loads resulting from infiltration.
f. The combined air exchange rate for infiltration and mechanical ventilation shall be
determined for intermittent mechanical ventilation.
RI-SBC-8
RI-SBC-8
Chapter 5
501.2 Delete exception in its entirety
Table 502.1.2 delete and substitute
TABLE 502.1.2
BUILDING ENVELOPE REQUIREMENTS OPAQUE ELEMENT, MAXIMUM U-FACTORS
CLIMATE ZONE
5
All other
Group R
Roofs
Insulation entirely above deck
U-0.048
U-04.048
Metal buildings
U-0.055
U-0.055
Attic and other
U-0.027
U-00027
Walls, Above Grade
Mass
U-0.90
U-0.80
Metal building
U-0.069
U-0.069
Metal framed
U-0.064
U-0.064
Wood framed and other
U-0.064
U-0.051
Walls, Below Grade
Below-grade walla
C-0.119
C-0.119
Floors
Mass
U-0.074
U-0.064
Joist/Framing
U-0.033
U-0.033
Slab-on Grade Floors
Unheated slabs
F-0.730
F-0.540
Heated slabs
F-0.860
F0.860
a. When heated slabs are placed below-grade, below grade walls must meet the F-factor requirements for perimeter insulation
according to the heated slab-on-grade construction.
Table 502.2 (1) Delete and substitute
TABLE 502.2(1)
BUILDING ENVELOPE REQUIREMENTS – OPAQUE ASSEMLIES
CLIMATE ZONE
5
ALL OTHERS
GROUP R
Roofs
Insulation entirely
Above deck
R-20ci
R-20ci
Metal buildings (with
R-5 thermal blocksa,b)
R-13 +
R-13
R-19
Attic and other
R-38
R-38
Walls, Above Grade
Mass
R-11.4ci
R-13.3 ci
Metal buildingb
R-13 +
R-5.6ci
R-13 +
R-5.6ci
Metal framed
R-13 +
R-7.5ci
R-13 +
R-7.5ci
Wood framed and
other
R-13 +
R-3.8ci
R-13 +
3.8
Walls, Below Grade
Below grade wallc
R-7.5ci
R-7.5ci
Floors
Mass
R-10ci
R-12.5ci
Joist/framing
Steel/(wood)
R-30
R-30
Slab-on-Grade Floors
Unheated Slabs
R-3 thermal break at
wall to floor joint
R-7.5 for 24 inches below
R-10 for
24 in.
below
Heated slabs
R-15 for
24 in.
below
R-15 for
24 in.
below
Opaque doors
Swinging
U –0.70
U –0.70
Roll-up or sliding
U -0.50
U -0.50
For SI:
1 inch = 25.4mm.
Ci = Continuous insulation. NR = No requirement.
a. When using R-value compliance method, a thermal spacer block is required, otherwise use the U-factor compliance
method. [see Tables 502.1.2 and 502.2(2)].
b. Assembly descriptions can be found in Table 502.2(2).
c. When heated slabs are placed below grade, below-grade walls must meet the exterior insulation requirements for
perimeter insulation according to the heated slab-on-grade construction.
RI-SBC-8
Table 502.3 delete and substitute
TABLE 502.3
BUILDING ENVELOPE REQUIREMENTS: FENESTRATION
CLIMATE ZONE
5
Vertical fenestration (40% maximum of above-grade wall)
U-factor
Framing materials other than metal with or without metal reinforcement or cladding
U-factor
0.35
Metal framing with or without thermal break
Curtin wall/storefront U-factor
0.45
Entrance door U-factor
0.80
All other U-factora
0.55
SHGC-all frame types
SHGC:PF < 0.25
0.40
SHGC: 0.25 ≤ PF < 0.5
NR
SHGC: PF ≥ 0.5
NR
Skylights (3% maximum)
U-factor
0.60
SHGC
0.40
NR = No requirements.
PF = Projection factor (see Section 502.3.2).
a. All others includes operable windows, fixed windows and nonetrance doors.
502.4.4 Relocate to section 503.4.7
502.4.9
Air Barrier Add the following:
502.4.9.1
Air Barriers: The Building envelope shall be designed and constructed with a continuous air
barrier to control air leakage into, and out of the conditioned space and space designed to maintain
temperature or humidity levels which differ from those in the conditioned space by more than 50% of the
difference between the conditioned space and design ambient conditions. The air barrier shall have the
following characteristics:
1.
It shall be continuous, with all joints made air-tight
2.
It shall have an air permeability not to exceed 0.004 cfm/ft2 under a pressure differential
of 0.3 in. water.
3.
It shall be capable of withstanding positive and negative combined design wind, fan and
stack pressure on the envelope without damage or displacement and shall be transfer the load
to the structure. It shall not displace adjacent materials under full load.
4.
The air barrier shall be joined in an air-tight and flexible manner to the air barrier material
of adjacent systems, allowing for the relative movement of systems due to thermal and
moisture variations and creep. Connections shall be made between:
a. Foundation and walls.
b. Walls and windows or doors.
c. Different wall systems
d. Wall and roof.
RI-SBC-8
e. Wall and roof over unconditioned space.
f. Walls, floor and roof across construction, control and expansion joints.
g. Walls, floors and roof to utility, pipe and duct penetrations.
Air barrier penetrations:
All penetrations of the air barrier and paths of air
502.4.9.2 infiltration/exfiltration shall be made air-tight.
503.2.1 Delete and Substitute
503.2.1 Calculation of heating and cooling loads. Design loads shall be determined in
accordance with the procedures described in the ASHRAE/ACCA Standard 183.
Heating and cooling loads shall be adjusted to account for load reductions that are
achieved when energy recovery systems are utilized in the HVAC system
Alternatively, design loads shall be determined by an approved equivalent
computation procedure, using the design parameters specified in Chapter 3.
503.2.4.4 Delete and substitute the following exceptions.
1.
Gravity exhaust dampers shall be permitted in buildings less than three
stories in height.
2.
Gravity dampers shall be permitted for exhaust airflows of 300 CFM
(.14 m3/s) when serving a single space.
503.2.4.5 Delete and substitute
503.2.4.5 Snow melt system controls. Snow and ice-melting system are allowed only
when there is no increase in supplied energy consumption, Snow- and ice-
melting systems, supplied through energy service to the building, shall include
automatic controls capable of shutting off the system when the pavement
temperature is above 50°F (10°C)
and no precipitation is falling and an automatic or manual control that will
allow shutoff when the outdoor temperature is above 40°F (4°C) so that the
potential for snow or ice accumulation is negligible.
503.2.7 Delete and substitute
503.2.7 Duct and plenum insulation and sealing. All supply and return air ducts and
plenums shall be insulated with a minimum of R-8 insulation when located in
unconditioned spaces and a minimum of R-12 insulation when located outside
the building. When located within a building envelope assembly, the duct or
plenum shall be separated from the building exterior or unconditioned or exempt
spaces by a minimum of R-8 insulation.
Exceptions:
1. When located within equipment.
2. When the design temperature difference between
the interior and exterior of the duct or plenum does
not exceed 15°F (8°C).
RI-SBC-8
503.2.9 Delete and substitute the following
503.2.9 HVAC System completion.
Prior to the issuance of a certificate of occupancy upon the request of the AHJ
evidence of system completion in accordance with sections 503.2.9.1 through
503.2.9.3 shall be provided.
Delete Table 503.3.1(1) and substitute the following table:
Table 503.3.1(1)
Climate Zone 5-A
Economizers on all individual cooling units
> 54,000 Btu/h
503.4.7 Add the following section moved from section 502.4.4
503.4.7 Hot gas by pass limitation. Cooling systems shall not use hot gas bypass or other
evaporator pressure control systems unless the system is designed with multiple steps of
unloading or continuous capacity modulation. The capacity of the hot gas bypass shall be
limited as indicated in Table 503.4.7.
Exception: Unitary packaged systems with cooling capacities not greater than 90,000
Btu/h (26 379 W).
TABLE 503.4.7
MAXIMUM HOT GAS BYPASS CAPACITY
RATED CAPACITY
MAXIMUM HOT GAS BYPASS
CAPACITY
(% of total capacity)
≤ 240,000 Btu/h
50%
> 240,000 Btu/h
25%
For SI: 1 Btu/h = 0.29 watts.
506 Delete in its entirety
RI-SBC-8
RI-SBC-8
Chapter 6
Reference Standards
Delete without substitute
ASHRE – 2005
ASHRE Handbook of Fundamentals
ASHRE – 2004
ASHRE HVAC Systems and Equipment Hand Book – 2004.