510-RICR-00-00-8
510-RICR-00-00-8. RISBC-8 Rhode Island Energy Conservation Code (version Amendment, 07/01/2013 to 07/01/2013)
RHODE ISLAND
STATE BUILDING CODE
SBC-8 State Energy Conservation Code
Replaces SBC-8-2010
Effective July 1, 2013
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
Department of Administration
BUILDING CODE STANDARDS COMMITTEE
One Capitol Hill
Providence, Rhode Island 02908-5859
(401) 222-3033
FAX No. (401) 222-2599
www.ribcc@ri.gov
6th EDITION
RISBC-8 2013
RISBC-8 2013
Regulation SBC-8
State Energy Conservation Code
July 1, 2013
The Building Code Standards Committee, in accordance with the rule making authority of Title 23,
Chapter 23-27.3, Section 109.1, paragraphs a through c inclusive, has formally adopted and
promulgated as the Rhode Island State Building Code, the provisions of the International Energy
Conservation Code, 2012 edition, as published by the International Code Council, Inc. (I.C.C.),
together with amendments thereto hereinafter set forth to the articles and sections of this code:
The provisions of Title 23, Chapter 27.3 of the General Laws of Rhode Island establishing
administration and enforcement are hereby incorporated by reference. Regulatory Administration
Chapter 1 immediately follows and is supplemental to the General Laws.
Editorial Note: Code users please note:
When purchasing or using the International Energy Conservation Code 2012 code, please take note
of the particular printing edition. Errata to that printing edition is available on-line directly at no
charge at www.iccsafe.org/cs/codes/pages/errata.aspx or call the office of the State Building Code
Commissioner at 401-222-1129 for further information.
Printed copies of the administrative and enforcement provisions of Title 23, Chapter 27.3 are
available at the Office of the State Building Code Commission or on-line at
http://www.rilin.state.ri.us/Statutes/TITLE23/23-27.3/INDEX.HTM.
The International Energy Conservation Code, 2012 Edition, is protected by the copyright that has
been issued to the ICC. As a result, the State Building Code is not available in complete form to
the public in an electronic format. The State Energy Conservation Code 2013 edition that is
referred to within is contained in a printed volume and is also in an electronic format that have
been published by the ICC under an exclusive license.
The Office of the State Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the month of June 2013 so that
local officials will have access to the code prior to the implementation of these rules on July 1,
2013.
In order to assure public access to this code the Office of the State Building Code Commissioner
shall provide a copy of this code to the Rhode Island State Library, which is located on the second
floor of the State House. In addition, all codes may be viewed during business hours at the
Department of Administration’s Library which is located on the fourth floor of the William E.
Powers Building, One Capitol Hill, Providence.
The Legislative Regulation Committee approved adoption of this code on July 1, 2013.
By:
John P. Leyden
Executive Secretary
Rhode Island Building Code Standards Committee
i
RISBC-8 2013
STATE OF RHODE ISLAND
BUILDING CODE STANDARDS COMMITTEE
CHAIRMAN
VICE CHAIRMAN
William J. Nash
Building Official
Bernard J. Bernard, III
Electrical Inspector
EXECUTIVE COMMITTEE
Michael A. Newman
Master Plumber
James Fink
Electrical Engineer
Doris Aschman
Public Health Official
Michael Daley
Builders Trades Council
Stephen C. Turner, PE
Public Member
Peter R. Scorpio, III
Building Official
Dana Newbrook
Architect
James R. Carlson, RA
Public Member
Scott D. Caron
Fire Official
G. Thomas Chabot
Electrical Contractor
David F. Palmisciano
Building Trades Council
Randy Collins, Jr., RLA
Landscape Architect
Gordon W. Preiss, PE
Mechanical Engineer
Robert E. DeBlois, Jr.
Builder
Craig R. Sutton
Builder
Paul DePace, PE
Representative for the Disabled
Russell Brown
Representative for the Disabled
Fred Sarno
Building Official
John P. Leyden, CBO
State Building Commissioner
Executive Secretary
Wayne R. Pimental, CBO
Minimum Housing Inspector
Thomas Coffey
Legal Counsel
RISBC-8 2013
STATE BUILDING CODE REGULATIONS – 2013
The following list includes all regulations promulgated by the State Building Code
Standards Committee. All regulations are available for a fee at the State Building
Commission.
1.
Building Code
SBC-1-2013
2.
One and Two Family Dwelling Code
SBC-2-2013
3.
Plumbing Code
SBC-3-2013
4.
Mechanical Code
SBC-4-2013
5.
Electrical Code
SBC-5-2011
6.
Property Maintenance Code
SBC-6-2013
7.
Reserved
8.
Energy Conservation Code
SBC-8-2013
9
Enforcement and Implementation Procedures for Projects
Under the Jurisdiction of
The State of Rhode Island
SBC-9
10.
Code Interpretations
SBC-10
11.
Certification of Building Officials,
Building, Electrical, Plumbing and Mechanical Inspectors
SBC-11-2010
12.
New Materials and Methods of Construction
SBC-12
13.
State Building Code for Existing Schools
SBC-13
14.
Reserved
15.
Reserved
16.
Reserved
17.
Public Buildings Accessibility Meeting Standards
SBC-17
18.
Native Lumber
SBC-18
19.
Fuel Gas Code
SBC-19-2013
20.
The State of Rhode Island Rehabilitation Building and
Fire Code for Existing Buildings and Structures
SRC-1-2002
iii
Format: These code changes follow numbering sequence and topics of the
INTERNATIONAL ENERGY CONSERVATION CODE 2012 (first printing). All
Provisions of IECC 2012 are retained unless indicated as deleted or revised. Published errata
are available from the ICC website dependent on the printing issue number and date.
Chapter 1[CE]
ADMINISTRATION
Revise IECC section C101.1, Title, to read as follows:
C101.1 Title: These regulations shall be known as the State Energy Conservation Code
Regulation SBC-8 - 2013 hereafter referred to as "this code”.
Add the following new section C101.1.1 referenced codes.
C101.1.1 Referenced Codes. The other codes listed in Sections C101.4.1 through C101.4.6
and referenced elsewhere in this code shall be considered part of the requirements of this
code to the prescribed extent of each such reference.
1.
Electrical. The provisions of Rhode Island State Electrical Code SBC-5-2011 shall
apply wherever referenced in this code as the ICC Electrical Code, and shall apply to
the installation of electrical systems, including alterations, repairs, replacement,
equipment, appliances, fixtures, fittings, and appurtenances thereto.
2.
Gas. The provisions of the Rhode Island State Fuel Gas Code SBC-19-2013 shall
apply wherever referenced in this code as the International Fuel Gas Code, and shall
apply to the installation of gas piping from the point of delivery, gas appliances and
related accessories as covered in this code. These requirements apply to gas piping
systems extending from the point of delivery to the inlet connections of appliances
and the installation and operation of residential and commercial gas appliances and
related accessories.
3.
Mechanical. The provisions of the Rhode Island State Mechanical Code SBC-4-
2013 shall apply wherever referenced in this code as the International Mechanical
Code and shall apply to the installation, alterations, repairs and replacement of the
mechanical systems, including equipment, appliances, fixtures, fittings and/or
appurtenances, including ventilating, heating, cooling, air-conditioning and
refrigeration systems, incinerators and other energy-related systems.
Page 1
RI-SBC-8 2013
4.
Plumbing. The provisions of Rhode Island State Plumbing Code SBC-3-2013 shall
apply wherever referenced in this code as the International Plumbing Code, and shall
apply to the installation, alteration, repair and replacement of plumbing systems,
including equipment, appliances, fixtures, fittings and appurtenances, and where
connected to a water or sewage system and all aspects of a medical gas system.
5.
Property Maintenance. The provisions of the Rhode Island State Property
Maintenance Code SBC-6-2013 Provides requirements for continued use and
maintenance buildings and property, and of related plumbing, mechanical, electrical
and fire protection systems in existing
residential nonresidential structures.
6.
Fire Prevention Code. Wherever and whenever provisions of the International Fire
Code 2012 editions are referenced, the appropriate Rhode Island Fire Safety Code
requirements shall apply.
7.
Building Code. The provisions of the Rhode Island State Building Code SBC-1-
2013 shall apply wherever referenced in this code as the International Building Code,
and shall apply to all matters governing the design and construction of buildings.
8.
Existing Building Code. The provisions of the State Building Codes SBC-1-2013 in
conjunction with the State Rehabilitation Code SRC-1 and the Rhode Island Fire
Safety Code shall apply wherever referenced in this code as the International Existing
Building Code.
Any and all such references to the various International Code Council family of code
shall be substituted for the appropriate state code as indicated above.
Page 2
RI-SBC-8 2013
Chapter 3[CE]
Climate Zones
Delete section C301 in its entirety and substitute the following.
Section C301
Climate Zones
C301.1 General Rhode Island shall be considered as climate zone 5 with the following
design conditions.
Table C301.1 Delete and substitute the following:
Table 301.1
Exterior Design Conditions.
Value
Value
Climate zone
Providence County
All others
Winter, design dry-bulb (degree F)
0
5
Summer, design dry-bulb
87
89
Summer design wet-bulb
71
73
Degree days heating
6831
5950
Degree days cooling
371
811
Page 3
RI-SBC-8 2013
Delete Figure C301.1 and Substitute the following: Figure C301.1
Page 4
RI-SBC-8 2013
Delete without substitution section C301.2 and C301.3
Delete without substitution Table C301.3(1)
Delete table C301.3(2) and substitute the following
TABLE C301.3(2)
RHODE ISLAND CLIMATE ZONE DEFINITION
THERMAL CRITERIA
Zone
Number
IP UNITS
SI UNITS
5
5400 ,HDD650F≤ 7200
3000 < HDD180C ≤ 4000
Delete C302.1 and substitute the following:
C302.1 Interior design conditions. The interior design temperature used for energy load
calculations shall be a maximum of 72°F (22°C) for heating and minimum of 75°F (24°C)
for cooling.
Page 5
RI-SBC-8 2013
Chapter 4[CE]
Delete C401.2 Application. And add the following:
C401.2 Application. The Commercial buildings projects shall comply with the requirements
in section C403 (Building Envelope Requirements), C403 (Building Mechanical Systems ),
C404 (Service Water Heating) and C405 (Electrical Power and Lighting Systems) in its
entirety, as an alternative the commercial building project shall comply with the energy cost
budget method in ASHRAE/IESNA 90.1.
Delete without substitute C401.2.1 Application to existing building.
Delete Table C402.1.2 and substitute the following
TABLE C402.1.2
OPAQUE THERMAL ENVELOPE ASSEMBLY REQUIREMENTS
CLIMATE ZONE
5
All other
Group R
Roofs
Insulation entirely above deck
U-0.039
U-0.039
Metal buildings
U-0.035
U-0.035
Attic and other
U-0.027
U-00021
Walls, Above Grade
Mass
U-0.078
U-0.78
Metal building
U-0.052
U-0.052
Metal framed
U-0.064
U-0.064
Wood framed and other
U-0.064
U-0.064
Walls, Below Grade
Below-grade walla
C-0.119
C-0.119
Floors
Mass
U-0.074
U-0.064
Joist/Framing
U-0.033
U-0.033
Slab-on Grade Floors
Unheated slabs
F-0.54
F-0.54
Heated slabs
F-0.58
F0.58
a.
Use opaque assembly U-factors, C-factors, and F-factors from ANSI/ASHRAE/IESNA 90.1 Appendix A shall be
permitted, provided the construction complies with the applicable construction details from ANSI/ASHRAE/IESNA
90.1 Appendix A.
b. When heated slabs are placed below-grade, below grade walls must meet the F-factor requirements for heated slabs.
Page 6
RI-SBC-8 2013
Delete Table C402.2 and substitute the following
TABLE C402.2
OPAQUE THERMAL ENVELOPE REQUIREMENTS
CLIMATE ZONE
5
ALL OTHERS
GROUP R
Roofs
Insulation entirely
Above deck
R-25ci
R-25ci
Metal buildings (with
R-5 thermal blocksa,b)
R-19 +
R-11LS
R-19
R-11LS
Attic and other
R-38
R-49
Walls, Above Grade
Mass
R-11.4ci
R-13.3 ci
Metal buildingb
R-13 +
R-13ci
R-13 +
R-13ci
Metal framed
R-13 +
R-7.5ci
R-13 +
R-7.5ci
Wood framed and
other
R-13 +
R-3.8ci or R-20
R-13 + R-7.5ci or
R-20 + R-3.8ci
Walls, Below Grade
Below grade wallc
R-7.5ci
R-7.5ci
Floors
Mass
R-10ci
R-12.5ci
Joist/framing
Steel/(wood)
R-30
R-30
Slab-on-Grade Floors
Unheated Slabs
R-10 for 24” below
R-10 for 24” below
Heated slabs
R-15 for 36” below
R-15 for 36” below
Opaque doors
Swinging
U –0.37
U –0.37
Roll-up or sliding
R -4.75
R -4.75
For SI:
1 inch = 25.4mm.
Ci = Continuous insulation. NR = No requirement.
a.
Assembly descriptions can be found in ANSI/ASHRAE/IESNA Appendix A.
b. When using R-value compliance method, a thermal spacer block shall be provided, otherwise use the U-factor
compliance method in Table C402.1.2.
c.
R-5.7ci is allowed to be substituted with concrete block walls complying with ASTM C 90, ungrouted or partially
grouted at 32 inches or less on center vertically and 48 inches or less on center horizontally, with ungrouted cores
filled with materials having a maximum thermal conductivity of 0.44 Btu-in/h-f2 F.
d. Where heated slabs are below grade, below-grade walls shall comply with the exterior insulation requirements for
heated slabs.
e. Steel floor joist systems shall be insulated to R-38.
Page 7
RI-SBC-8 2013
Delete Table C402.3 and substitute the following
TABLE C402.3
BUILDING ENVELOPE REQUIREMENTS: FENESTRATION
CLIMATE ZONE
5
Vertical fenestration
U-factor
Fixed fenestration
0.38
Operable fenestration 0.45
Entrance door
0.77
SHGC
SHGC
0.40
Skylights
U-factor
0.50
SHGC
0.40
C403.2.1 Delete and Substitute
C403.2.1 Calculation of heating and cooling loads. Design loads shall be determined in
accordance with the procedures described in the ANSI/ASHRAE/ACCA Standard
183. The design loads shall account for the building envelope, lighting, ventilation
and occupancy loads based on the projected design.
Heating and cooling loads shall be adjusted to account for load reductions that are
achieved when energy recovery systems are utilized in the HVAC system.
Alternatively, design loads shall be determined by an approved equivalent
computation procedure, using the design parameters specified in Chapter 3.
C403.2.4.4 Delete and substitute the following exceptions.
1.
Gravity exhaust dampers shall be permitted in buildings less than three
stories in height.
2.
Gravity dampers shall be permitted for exhaust airflows of 300 CFM
(.14 m3/s) when serving a single space.
Page 8
RI-SBC-8 2013
C403.2.4.5 Delete and substitute
C403.2.4.5 Snow melt system controls. Snow and ice-melting system are allowed only
when there is no increase in supplied energy consumption. As certified by
Registered Design Professional. Snow- and ice- melting systems, supplied through
energy service to the building, shall include automatic controls capable of shutting off
the system when the pavement temperature is above 50°F (10°C) and no precipitation
is falling and an automatic or manual control that will allow shutoff when the outdoor
temperature is above 40°F (4°C) so that the potential for snow or ice accumulation is
negligible.
TABLE C403.2.6
ENERGY RECOVERY REQUIREMENT
PERCENT (%) OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE
>30% AND <
40%
>40% AND <50% >50% AND <60%
>60% AND <70%
>70% AND <80%
> 80%
CLIMATE ZONE
DESIGN SUPPLY FAN AIRFLOW RATE (cfm)
5
> 5500
>4500
> 3500
> 2000
> 1000
> 0
C403.2.7 Delete and substitute
C403.2.7 Duct and plenum insulation and sealing. All supply and return air ducts and
plenums shall be insulated with a minimum of R-8 insulation when located in
unconditioned spaces and a minimum of R-12 insulation when located outside
the building. When located within a building envelope assembly, the duct or
plenum shall be separated from the building exterior or unconditioned or exempt
spaces by a minimum of R-8 insulation.
Exceptions:
1. When located within equipment.
2. When the design temperature difference between
the interior and exterior of the duct or plenum does
not exceed 15°F (8°C).
All ducts, air handlers and filter boxes shall be sealed. Joints and seams shall
comply with section 603.9 of the International Mechanical Code.
Page 9
RI-SBC-8 2013
Page 10
RI-SBC-8 2013
Delete Table C403.3.1(1) and substitute the following table:
Table C403.3.1(1)
Climate Zone 5-A
Economizers on all individual cooling units
> 54,000 Btu/h
TABLE C403.3.1.3(1)
HIGH-LIMIT SHUTOFF CONTROL OPTION FOR AIR ECONOMIZER
CLIMATE ZONES
ALLOWED CONTROL TYPES
RI 5
Fixed dry bulb
Differential dry bulb
Fixed enthalpy
Electronic enthalpy
Differential enthalpy
Dew-point and dry-bulb temperatures
a. Electronic enthalpy controllers are devices that use a combination of humidity and dry-bulb temperature in
their switching algorithm.
Deleted without substitute Section C407
Chapter 5[CE]
Reference Standards
Delete without substitute
ASHRAE – 2004
ASHRAE HVAC Systems and Equipment Hand Book – 2004.
Page 11
RI-SBC-8 2013
Chapter 1[RE]
ADMINISTRATION
Revise IECC section R101.1, Title, to read as follows:
R101.1 Title: These regulations shall be known as the State Energy Conservation Code
Regulation SBC-8 - 2013 hereafter referred to as "this code”.
Add the following new section R101.1.1 referenced codes.
R101.1.1 Referenced Codes. The other codes listed in Sections R101.4.1 through R101.4.7
and referenced elsewhere in this code shall be considered part of the requirements of this
code to the prescribed extent of each such reference.
1.
Electrical. The provisions of Rhode Island State Electrical Code SBC-5-2011 shall
apply wherever referenced in this code as the ICC Electrical Code, and shall apply to
the installation of electrical systems, including alterations, repairs, replacement,
equipment, appliances, fixtures, fittings, and appurtenances thereto.
2.
Gas. The provisions of the Rhode Island State Fuel Gas Code SBC-19-2013 shall
apply wherever referenced in this code as the International Fuel Gas Code, and shall
apply to the installation of gas piping from the point of delivery, gas appliances and
related accessories as covered in this code. These requirements apply to gas piping
systems extending from the point of delivery to the inlet connections of appliances
and the installation and operation of residential and commercial gas appliances and
related accessories.
3.
Mechanical. The provisions of the Rhode Island State Mechanical Code SBC-4-
2013 shall apply wherever referenced in this code as the International Mechanical
Code and shall apply to the installation, alterations, repairs and replacement of the
mechanical systems, including equipment, appliances, fixtures, fittings and/or
appurtenances, including ventilating, heating, cooling, air-conditioning and
refrigeration systems, incinerators and other energy-related systems.
4. Plumbing. The provisions of Rhode Island State Plumbing Code SBC-3-2013 shall
apply wherever referenced in this code as the International Plumbing Code, and shall
apply to the installation, alteration, repair and replacement of plumbing systems,
including equipment, appliances, fixtures, fittings and appurtenances, and where
connected to a water or sewage system and all aspects of a medical gas system.
Page 1
RI-SBC-8 2013
5. Property Maintenance. The provisions of the Rhode Island State Property
Maintenance Code SBC-6-2013 Provides requirements for continued use and
maintenance buildings and property, and of related plumbing, mechanical, electrical
and fire protection systems in existing
residential nonresidential structures.
6.
Fire Prevention Code. Wherever and whenever provisions of the International Fire
Code 2012 editions are referenced, the appropriate Rhode Island Fire Safety Code
requirements shall apply.
7.
Building Code. The provisions of the Rhode Island State Building Code SBC-1-
2013 shall apply wherever referenced in this code as the International Building Code,
and shall apply to all matters governing the design and construction of buildings.
9.
Existing Building Code. The provisions of the State Building Codes SBC-1-2013 in
conjunction with the State Rehabilitation Code SRC-1 and the Rhode Island Fire
Safety Code shall apply wherever referenced in this code as the International Existing
Building Code.
Any and all such references to the various International Code Council family of code
shall be substituted for the appropriate state code as indicated above.
Page 2
RI-SBC-8 2013
Page 3
RI-SBC-8 2013
Chapter 3[RE]
Climate Zones
Delete section R301 in its entirety and substitute the following.
Section C301
Climate Zones
R301.1 General Rhode Island shall be considered as climate zone 5 with the following
design conditions.
Table R301.1 Delete and substitute the following:
Table R301.1
Exterior Design Conditions.
Value
Value
Climate zone
Providence County
All others
Winter, design dry-bulb (degree F)
0
5
Summer, design dry-bulb
87
89
Summer design wet-bulb
71
73
Degree days heating
6831
5950
Degree days cooling
371
811
Delete without substitute section R301.2 and R301.3
Delete Table R301.3(1) without substitute
Delete Table R301.3(2) without substitute
Delete Figure R301.1 and Substitute the following: Figure R301.1
Page 1
RI-SBC-8 2013
CHAPTER 4 [RE]
R401.2 Delete R401.2 and substitute the following:
R401.2 Compliance Methods
Compliance shall be demonstrated by either:
1.
Meeting the requirements of the Rhode Island Energy Conservation Code
SBC-8-2013.
2.
Meeting the requirements of this chapter using the criteria for climate zone 5
from Figure N 1102A or table 1102.1.2.
3.
Compliance submission of Res-Check for Zone 5 & R.I. Energy Conservation
Code Residential Provisions.
Add the following to R401.3 Certificate:
Figure R401.3
A certificate similar to this shall be attached to or near the electrical panel board
ENERGY CERTIFICATE
Street Address
City / Town
Predominant Values
R-Value Ceiling / Roof
R- Value Walls
R- Value Ducts (outside conditioned space)
U Factor Fenestration
SHGC Fenestration
Gas Fired Un-vented Room Heater
Baseboard Electric Heater
Electric Furnace
U Factor Skylight / SHGC
AFUE Value Boiler / Furnace
Efficiency and type of heating equipment
Efficiency and type of cooling equipment
Efficiency and type of service water heater
Contractor or Design Professional
Address
Registration
Signature
Page 2
RI-SBC-8 2013
Delete and substitute Table R402.1.1
TABLE R402.1.1
INSULATION AND FENESTRATION REQUIRMENTS BY COMPONENT a
CLIMATE
ZONE
FERNESTRATION
U-FACTOR b
SKYLIGHT b
U-FACTOR
GLAZED
FERNESTRATION
SHGC b
CEILING
R-VALUE i
WOOD
FRAME WALL
R-VALUE g
MASS WALL
R-VALUE
FLOOR
R-VALUE
BASEMENT C
WALL R-VALUE
SLAB d
R-VALUE
& DEBTTH
CRAWL
SPACE c
WALL
R-VALUE
5
0.35
0.60
NR
38
20 or
13+5 f
13/17
30 e
10/13
R-10
for
2 ft
10/13
For SI: 1 foot = 304.8 mm.
a.
R-values are minimums U-factors and SHGC are maximums. R-19 batts compressed into a
nominal 2 × 6 framing cavity such that the R- value is reduced by R-1 or more shall be marked
with the compressed batt R-value in addition to the full thickness R-value.
b.
The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed
fenestration.
c.
“10/13” means R-10 continuous insulated sheathing on the interior or exterior of the homeor R-
13 cavity insulation at the interior of the basement wall.
d.
R-5 shall be added to the entire slab and the required slab edge R-values for heated slabs
e.
Or insulation sufficient to fill the framing cavity, R-19 minimum.
f.
“13+5” means R-13 cavity insulation plus R-5 insulated sheathing. If structural sheathing covers
25 percent or less of the exterior, insulating sheathing is not required where structural sheathing
is used. If structural sheathing covers more than 25 percent of exterior, structural sheathing shall
be supplemented with insulated sheathing of at least R-2.
g.
The second R-value applies when more than half the insulation is on the interior of the mass
wall.
Page 3
RI-SBC-8 2013
TABLE R402.1.3
EQUIVALENT U-FACTORSa
CLIMATE
ZONE
FENESTRATION
U-FACTOR
SKYLIGHT
U-FACTOR
CEILING
U-FACTOR
FRAME
WALL
U-FACTOR
MASS
WALL
U-FACTORb
FLOOR
U-
FACTOR
BASSEMENT
WALL
U-FACTOR
CRAWL
SPACE
WALL
U-FACTOR
5
0.32
0.55
0.026
0.057
0.082
0.033
0.050
0.055
R402.1.4 Total UA alternative Delete and substitute
R402.1.4 Total UA alternative. If the total building thermal envelope UA (sum of U-factor
times assembly area) is less than or equal to the total UA resulting from using the U-factors
in Table R402.1.3 (multiplied by the same assembly area as in the proposed building), the
building shall be considered in compliance with Table R402.1.1. The UA calculation shall
include the thermal bridge effects of framing materials. The UA calculation shall include the
thermal bridging effects of framing materials. The SHGC requirements shall be met in
addition to UA compliance
R402.4.1.2 Delete and substitute the following
R402.4.1.2
Testing. The building or dwelling unit shall be tested and the air leakage rate
shall be verified. Testing shall be conducted with a blower door at a pressure of 0.2 inches
w.g. (50 Pascals). Testing shall be conducted by an approved third party, where required by
the building official. A written report of the results of the test shall be signed by the party
conducting the test and provided to the building official. Testing shall be performed at any
time after creation of all penetrations of the building thermal envelope.
During testing:
1.
Exterior windows and doors, fireplace and stove doors shall be closed, but not
sealed, beyond the intended weatherstripping or other infiltration control
measures;
2.
Dampers including exhaust, intake, makeup air, backdraft and flue dampers
shall be closed, but not sealed beyond intended infiltration control measures;
3.
Interior doors, if installed at the time of the test, shall be open.
4.
Exterior doors for continuous ventilation systems and heat recovery
ventilators shall be closed and sealed;
5.
Heating and cooling systems, if installed at the time of the test, shall be turned
off; and
6.
Supply and return registers, if installed at the time of the test, shall be fully
open.
Page 4
RI-SBC-8 2013
Page 5
RI-SBC-8 2013
R403.2.2 Sealing (Mandatory)
Delete From sections 403.2.2
1) Post construction test
2) Rough-in test
Substitute the following:
1.
Post construction test: Total leakage shall be less than or equal to 8 cfm (113.3
L/min) per 100 square feet (9.29 m2) of conditioned floor area when tested at
a pressure differential of 0.1 inches w.g.(25 Pa) across the entire system,
including the manufacturer’s air handler enclosure. All register boots shall be
taped or otherwise sealed during the test.
2.
Rough-in test: Total leakage shall be less than or equal to 6 cfm (113.3 L/min)
per 100 square feet (9.29 m2) of conditioned floor area when tested at a
pressure differential of 0.1 inches w.g. (25 Pa) across the system, including
the manufacturer air handler enclosure. All registers shall be taped or
otherwise sealed during the test. If the air handler is not installed at the time
of the test, total leakage shall be less than or equal to 4 cfm (85 L/min) per
100 square feet (9.29 m2) of conditioned floor area.
Delete R403.2.3 and substitute the following
R403.2.3_ Building cavities (Mandatory). Interior building framing cavities shall be
permitted to be used as return ducts or plenums. (BP)
Chapter 5[RE]
Reference Standards
Delete without substitute
ASHRAE – 2009
ASHRAE Handbook of Fundamentals.
Page 1
RI-SBC-8 2013