510-RICR-00-00-8
510-RICR-00-00-8. RISBC-8 Rhode Island Energy Conservation Code (version Technical Revision, 07/01/2013 to 08/01/2019)
8.1 Authority
The Building Code Standards
Committee, in accordance with the rule making authority of R.I. Gen.
Laws §§ 23-27.3-109.1(a) through (c) inclusive, has
formally adopted and promulgated as the Rhode Island State Building
Code, the provisions of the International Energy Conservation Code,
2012 edition, as published by the International Code Council, Inc.
(I.C.C.), together with amendments thereto hereinafter set forth to
the articles and sections of this code.
8.2 Incorporated Materials
A. The provisions of R.I. Gen.
Laws Chapter 23-27.3 establishing administration and enforcement are
hereby incorporated by reference. § 8.3 of this Part (Chapter 1)
immediately follows and is supplemental to the General Laws.
Editorial Note: Code users please note:
1. When purchasing or using
the International Energy Conservation Code 2012 code, please take
note of the particular printing edition. Errata to that printing
edition is available on-line directly at no charge at
www.iccsafe.org/cs/codes/pages/errata.aspx
or call the office of the State Building Code Commissioner at
401-222-1129 for further information.
2. Printed copies of the
administrative and enforcement provisions of R.I. Gen. Laws Chapter
23-27.3 are available at the Office of the State Building Code
Commission or on-line at
http://www.rilin.state.ri.us/Statutes/TITLE23/23-27.3/INDEX.HTM .
3. The International Energy
Conservation Code, 2012 Edition, is protected by the copyright that
has been issued to the ICC. As a result, the State Building Code is
not available in complete form to the public in an electronic format.
The State Energy Conservation Code 2013 edition that is referred to
within is contained in a printed volume and is also in an electronic
format that have been published by the ICC under an exclusive
license.
4. The Office of the State
Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the
month of June 2013 so that local officials will have access to the
code prior to the implementation of these rules on July 1, 2013.
5. In order to assure public
access to this code the Office of the State Building Code
Commissioner shall provide a copy of this code to the Rhode Island
State Library, which is located on the second floor of the State
House. In addition, all codes may be viewed during business hours at
the Department of Administration’s Library which is located on
the fourth floor of the William E. Powers Building, One Capitol Hill,
Providence.
B. The Legislative Regulation
Committee approved adoption of this code on July 1, 2013.
C. Format: These code changes
follow numbering sequence and topics of the INTERNATIONAL ENERGY
CONSERVATION CODE 2012 (first printing). All Provisions of IECC 2012
are retained unless indicated as deleted or revised. Published errata
are available from the ICC website dependent on the printing issue
number and date.
8.3 Chapter
1[CE] ADMINISTRATION
Revise
IECC section C101.1, Title, to read as follows:
C101.1 Title: These
regulations shall be known as the State Energy Conservation Code
Regulation SBC-8 - 2013 hereafter referred to as "this code”.
Add the following new section
C101.1.1 referenced codes.
C101.1.1 Referenced Codes.
The other codes listed in Sections C101.4.1 through C101.4.6 and
referenced elsewhere in this code shall be considered part of the
requirements of this code to the prescribed extent of each such
reference.
(1) Electrical. The provisions
of Rhode Island State Electrical Code SBC-5-2011 ( Part
5 of this Subchapter ) shall apply wherever referenced in this
code as the ICC Electrical Code, and shall apply to the installation
of electrical systems, including alterations, repairs, replacement,
equipment, appliances, fixtures, fittings, and appurtenances thereto.
(2) Gas. The provisions of the
Rhode Island State Fuel Gas Code SBC-19-2013 ( Part
19 of this Subchapter ) shall apply wherever referenced in this
code as the International Fuel Gas Code, and shall apply to the
installation of gas piping from the point of delivery, gas appliances
and related accessories as covered in this code. These requirements
apply to gas piping systems extending from the point of delivery to
the inlet connections of appliances and the installation and
operation of residential and commercial gas appliances and related
accessories.
(3) Mechanical. The provisions
of the Rhode Island State Mechanical Code SBC-4-2013 ( Part
4 of this Subchapter ) shall apply wherever referenced in this
code as the International Mechanical Code and shall apply to the
installation, alterations, repairs and replacement of the mechanical
systems, including equipment, appliances, fixtures, fittings and/or
appurtenances, including ventilating, heating, cooling,
air-conditioning and refrigeration systems, incinerators and other
energy-related systems.
(4) Plumbing. The provisions
of Rhode Island State Plumbing Code SBC-3-2013 ( Part
3 of this Subchapter ) shall apply wherever referenced in this
code as the International Plumbing Code, and shall apply to the
installation, alteration, repair and replacement of plumbing systems,
including equipment, appliances, fixtures, fittings and
appurtenances, and where connected to a water or sewage system and
all aspects of a medical gas system.
(5) Property Maintenance. The
provisions of the Rhode Island State Property Maintenance Code
SBC-6-2013 ( Part
6 of this Subchapter ) Provides requirements for continued use and
maintenance buildings and property, and of related plumbing,
mechanical, electrical and fire protection systems in existing
residential nonresidential structures.
(6) Fire Prevention Code.
Wherever and whenever provisions of the International Fire Code 2012
editions are referenced, the appropriate Rhode Island Fire Safety
Code ( 450-RICR-00-00-1
through 10 ) requirements shall apply.
(7) Building Code. The
provisions of the Rhode Island State Building Code SBC-1-2013 ( Part
1 of this Subchapter ) shall apply wherever referenced in this
code as the International Building Code, and shall apply to all
matters governing the design and construction of buildings.
(8) Existing Building Code.
The provisions of the State Building Codes SBC-1-2013 ( Part
1 of this Subchapter ) in conjunction with the State
Rehabilitation Code SRC-1 ( Part
20 of this Subchapter ) and the Rhode Island Fire Safety Code
( 450-RICR-00-00-1
through 10 ) shall apply wherever referenced in this code as the
International Existing Building Code.
(9) Any and all such
references to the various International Code Council family of code
shall be substituted for the appropriate state code as indicated
above.
8.4 Chapter
3[CE] Climate Zones
Delete
section C301 in its entirety and substitute the following.
Section C301 Climate Zones
C301.1 General Rhode Island
shall be considered as climate zone 5 with the following design
conditions.
Table C301.1 Delete and
substitute the following:
Table
301.1
Exterior
Design Conditions.
Value
Value
Climate
zone
Providence
County
All
others
Winter,
design dry-bulb (degree F)
0
5
Summer,
design dry-bulb
87
89
Summer
design wet-bulb
71
73
Degree
days heating
6831
5950
Degree
days cooling
371
811
Delete Figure C301.1 and
Substitute the following: Figure C301.1
Delete without substitution
section C301.2 and C301.3
Delete without substitution
Table C301.3(1)
Delete table C301.3(2) and
substitute the following
TABLE C301.3(2)
RHODE ISLAND CLIMATE ZONE
DEFINITION
Zone
Number
THERMAL
CRITERIA
IP
UNITS
SI
UNITS
5
5400,
HDD650F≤ 7200
3000
< HDD180C ≤ 4000
Delete C302.1 and substitute
the following:
C302.1 Interior design
conditions. The interior design temperature used for energy load
calculations shall be a maximum of 72°F (22°C) for heating
and minimum of 75°F (24°C) for cooling.
8.5 Chapter 4[CE]
Delete
C401.2 Application. And add the following:
C401.2 Application. The
Commercial buildings projects shall comply with the requirements in
section C403 (Building Envelope Requirements), C403 (Building
Mechanical Systems), C404 (Service Water Heating) and C405
(Electrical Power and Lighting Systems) in its entirety, as an
alternative the commercial building project shall comply with the
energy cost budget method in ASHRAE/IESNA 90.1.
Delete without substitute
C401.2.1 Application to existing building.
Delete Table C402.1.2 and
substitute the following
TABLE C402.1.2
OPAQUE THERMAL ENVELOPE
ASSEMBLY REQUIREMENTS
CLIMATE
ZONE
5
All
other
Group
R
Roofs
Insulation
entirely above deck
U-0.039
U-0.039
Metal
buildings
U-0.035
U-0.035
Attic
and other
U-0.027
U-00021
Walls,
Above Grade
Mass
U-0.078
U-0.78
Metal
building
U-0.052
U-0.052
Metal
framed
U-0.064
U-0.064
Wood
framed and other
U-0.064
U-0.064
Walls,
Below Grade
Below-grade
walls
C-0.119
C-0.119
Floors
Mass
U-0.074
U-0.064
Joist/Framing
U-0.033
U-0.033
Slab-on
Grade Floors
Unheated
slabs
F-0.54
F-0.54
Heated
slabs
F-0.58
F0.58
a. Use opaque assembly
U-factors, C-factors, and F-factors from ANSI/ASHRAE/IESNA 90.1
Appendix A shall be permitted, provided the construction complies
with the applicable construction details from ANSI/ASHRAE/IESNA 90.1
Appendix A.
b. When heated slabs are
placed below-grade, below grade walls must meet the F-factor
requirements for heated slabs.
Delete
Table C402.2 and substitute the following
TABLE C402.2
OPAQUE THERMAL ENVELOPE
REQUIREMENTS
CLIMATE
ZONE
5
ALL
OTHERS
GROUP
R
Roofs
Insulation
entirely Above deck
R-25ci
R-25ci
Metal
buildings (with R-5 thermal blocks a,b )
(Assembly
descriptions can be found in ANSI/ASHRAE/IESNA Appendix A.)
(When
using R-value compliance method, a thermal spacer block shall be
provided, otherwise use the U-factor compliance method in Table
C402.1.2.)
R-19
+ R-11LS
R-19
R-11LS
Attic
and other
R-38
R-49
Walls,
Above Grade
Mass
R-11.4ci
R-13.3
ci
Metal
building c (When using R-value compliance method, a
thermal spacer block shall be provided, otherwise use the U-factor
compliance method in Table C402.1.2.)
R-13
+
R-13ci
R-13
+
R-13ci
Metal
framed
R-13
+ R-7.5ci
R-13
+ R-7.5ci
Wood
framed and other
R-13
+
R-3.8ci
or R-20
R-13
+ R-7.5ci or R-20 + R-3.8ci
Walls,
Below Grade
Below
grade wall c
(R-5.7ci
is allowed to be substituted with concrete block walls complying
with ASTM C 90, un-grouted or partially grouted at 32 inches or
less on center vertically and 48 inches or less on center
horizontally, with un-grouted cores filled with materials having a
maximum thermal conductivity of 0.44 Btu-in/h-f2 F.)
R-7.5ci
R-7.5ci
Floors
Mass
R-10ci
R-12.5ci
Joist/framing
Steel/(wood)
R-30
R-30
Slab-on-Grade
Floors
Unheated
Slabs
R-10
for 24” below
R-10
for 24” below
Heated
slabs
R-15
for 36” below
R-15
for 36” below
Opaque
doors
Swinging
U
–0.37
U
–0.37
Roll-up
or sliding
R
-4.75
R
-4.75
For SI: 1 inch = 25.4mm.
Ci = Continuous insulation.
NR = No requirement.
a. Assembly descriptions can
be found in ANSI/ASHRAE/IESNA Appendix A.
b. When using R-value
compliance method, a thermal spacer block shall be provided,
otherwise use the U-factor compliance method in Table C402.1.2.
c. R-5.7ci is allowed to be
substituted with concrete block walls complying with ASTM C 90,
ungrouted or partially grouted at 32 inches or less on center
vertically and 48 inches or less on center horizontally, with
ungrouted cores filled with materials having a maximum thermal
conductivity of 0.44 Btu-in/h-f2 F.
d. Where heated slabs are
below grade, below-grade walls shall comply with the exterior
insulation requirements for heated slabs.
e. Steel floor joist systems
shall be insulated to R-38.
Delete
Table C402.3 and substitute the following
TABLE C402.3
BUILDING ENVELOPE
REQUIREMENTS: FENESTRATION
CLIMATE
ZONE
5
Vertical
fenestration
U-factor
Fixed
fenestration
0.38
Operable
fenestration 0.45
Entrance
door
0.77
SHGC
SHGC
0.40
Skylights
U-factor
0.50
SHGC
0.40
C403.2.1
Delete and Substitute
C403.2.1 Calculation of
heating and cooling loads. Design loads shall be determined in
accordance with the procedures described in the ANSI/ASHRAE/ACCA
Standard 183.
The design loads shall
account for the building envelope, lighting, ventilation and
occupancy loads based on the projected design.
Heating and cooling loads
shall be adjusted to account for load reductions that are achieved
when energy recovery systems are utilized in the HVAC system.
Alternatively, design loads
shall be determined by an approved equivalent computation procedure,
using the design parameters specified in Chapter 3.
C403.2.4.4
Delete and substitute the following exceptions.
1. Gravity exhaust dampers
shall be permitted in buildings less than three stories in height.
2. Gravity dampers shall be
permitted for exhaust airflows of 300 CFM (.14 m 3 /s) when
serving a single space.
C403.2.4.5
Delete and substitute
C403.2.4.5 Snow melt system
controls. Snow and ice-melting system are allowed only when there is
no increase in supplied energy consumption. As certified by
Registered Design Professional. Snow- and ice- melting systems,
supplied through energy service to the building, shall include
automatic controls capable of shutting off the system when the
pavement temperature is above 50°F (10°C) and no
precipitation is falling and an automatic or manual control that will
allow shutoff when the outdoor temperature is above 40°F (4°C)
so that the potential for snow or ice accumulation is negligible.
TABLE C403.2.6
ENERGY RECOVERY REQUIREMENT
CLIMATE
ZONE
PERCENT
(%) OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE
>30%
AND <40%
>40%
AND <50%
>50%
AND <60%
>60%
AND <70%
>70%
AND <80%
>
80%
DESIGN
SUPPLY FAN AIRFLOW RATE (cfm)
5
>
5500
>4500
>
3500
>
2000
>
1000
>
0
C403.2.7
Delete and substitute
C403.2.7 Duct and plenum
insulation and sealing. All supply and return air ducts and plenums
shall be insulated with a minimum of R-8 insulation when located in
unconditioned spaces and a minimum of R-12 insulation when located
outside the building. When located within a building envelope
assembly, the duct or plenum shall be separated from the building
exterior or unconditioned or exempt spaces by a minimum of R-8
insulation.
Exceptions:
1. When located within
equipment.
2. When the design temperature
difference between the interior and exterior of the duct or plenum
does not exceed 15°F (8°C).
All ducts, air handlers and
filter boxes shall be sealed. Joints and seams shall comply with
section 603.9 of the International Mechanical Code.
Delete
Table C403.3.1(1) and substitute the following table:
Table C403.3.1(1)
Climate
Zone 5-A
Economizers
on all individual cooling units
>54,000
Btu/h
TABLE C403.3.1.3(1)
HIGH-LIMIT SHUTOFF CONTROL
OPTION FOR AIR ECONOMIZER
CLIMATE
ZONES
ALLOWED
CONTROL TYPES
RI 5
Fixed
dry bulb Differential dry bulb Fixed Enthalpy Electronic enthalpy
Differential enthalpy
Dew-point
and dry-bulb temperatures
a. Electronic enthalpy
controllers are devices that use a combination of humidity and
dry-bulb temperature in their switching algorithm.
Deleted
without substitute Section C407
8.6 Chapter 5[CE]
Reference
Standards
Delete
without substitute
ASHRAE – 2004 ASHRAE
HVAC Systems and Equipment Hand Book – 2004.
8.7 Chapter 1[RE]
8.7.1 ADMINISTRATION
Revise
IECC section R101.1, Title, to read as follows:
R101.1 Title: These
regulations shall be known as the State Energy Conservation Code
Regulation SBC-8-2013 hereafter referred to as "this code”.
Add
the following new section R101.1.1 referenced codes.
R101.1.1 Referenced Codes.
The other codes listed in Sections R101.4.1 through R101.4.7 and
referenced elsewhere in this code shall be considered part of the
requirements of this code to the prescribed extent of each such
reference.
(1) Electrical. The provisions
of Rhode Island State Electrical Code SBC-5-2011 ( Part
5 of this Subchapter ) shall apply wherever referenced in
this code as the ICC Electrical Code, and shall apply to the
installation of electrical systems, including alterations, repairs,
replacement, equipment, appliances, fixtures, fittings, and
appurtenances thereto.
(2) Gas. The provisions of the
Rhode Island State Fuel Gas Code SBC-19-2013 ( Part
19 of this Subchapter ) shall apply wherever referenced in
this code as the International Fuel Gas Code, and shall apply to the
installation of gas piping from the point of delivery, gas appliances
and related accessories as covered in this code. These requirements
apply to gas piping systems extending from the point of delivery to
the inlet connections of appliances and the installation and
operation of residential and commercial gas appliances and related
accessories.
(3) Mechanical. The provisions
of the Rhode Island State Mechanical Code SBC-4- 2013 ( Part
4 of this Subchapter ) shall apply wherever referenced in
this code as the International Mechanical Code and shall apply to the
installation, alterations, repairs and replacement of the mechanical
systems, including equipment, appliances, fixtures, fittings and/or
appurtenances, including ventilating, heating, cooling,
air-conditioning and refrigeration systems, incinerators and other
energy-related systems.
(4) Plumbing. The provisions
of Rhode Island State Plumbing Code SBC-3-2013 ( Part
3 of this Subchapter ) shall apply wherever referenced in
this code as the International Plumbing Code, and shall apply to the
installation, alteration, repair and replacement of plumbing systems,
including equipment, appliances, fixtures, fittings and
appurtenances, and where connected to a water or sewage system and
all aspects of a medical gas system.
(5) Property Maintenance. The
provisions of the Rhode Island State Property Maintenance Code
SBC-6-2013 ( Part
6 of this Subchapter ) Provides requirements for continued
use and maintenance buildings and property, and of related plumbing,
mechanical, electrical and fire protection systems in existing
residential nonresidential structures.
(6) Fire Prevention Code.
Wherever and whenever provisions of the International Fire Code 2012
editions are referenced, the appropriate Rhode Island Fire Safety
Code ( 450-RICR-00-00-1
through 10 ) requirements shall apply.
(7) Building Code. The
provisions of the Rhode Island State Building Code SBC-1-2013 ( Part
1 of this Subchapter ) shall apply wherever referenced in
this code as the International Building Code, and shall apply to all
matters governing the design and construction of buildings.
(8) Existing Building Code.
The provisions of the State Building Codes SBC-1-2013 ( Part
1 of this Subchapter ) in conjunction with the State
Rehabilitation Code SRC-1 ( Part
20 of this Part ) and the Rhode Island Fire Safety Code
( 450-RICR-00-00-1
through 10 ) shall apply wherever referenced in this code
as the International Existing Building Code.
(9) Any and all such
references to the various International Code Council family of code
shall be substituted for the appropriate state code as indicated
above.
8.8 Chapter 3[RE] Climate Zones
Delete
section R301 in its entirety and substitute the following.
Section C301 Climate Zones
R301.1 General Rhode Island
shall be considered as climate zone 5 with the following design
conditions.
Table R301.1 Delete and
substitute the following:
Table
R301.1
Exterior
Design Conditions.
Value
Value
Climate
zone
Providence
County
All
others
Winter,
design dry-bulb (degree F)
0
5
Summer,
design dry-bulb
87
89
Summer
design wet-bulb
71
73
Degree
days heating
6831
5950
Degree
days cooling
371
811
Delete without substitute
section R301.2 and R301.3
Delete Table R301.3(1) without
substitute
Delete Table R301.3(2) without
substitute
Delete Figure R301.1 and
Substitute the following: Figure R301.1
8.9 Chapter
4 [RE]
R401.2
Delete R401.2 and substitute the following:
R401.2 Compliance Methods
Compliance shall be
demonstrated by either:
1. Meeting the requirements of
the Rhode Island Energy Conservation Code SBC-8-2013 (this Part).
2. Meeting the requirements of
this chapter using the criteria for climate zone 5 from Figure N
1102A or table 1102.1.2.
3. Compliance submission of
Res-Check for Zone 5 & R.I. Energy Conservation Code Residential
Provisions.
Add the following to R401.3
Certificate:
Figure
R401.3
A
certificate similar to this shall be attached to or near the
electrical panel board
ENERGY
CERTIFICATE
Street
Address
City
/ Town
Predominant
Values
R-Value
Ceiling / Roof
R-
Value Walls
R-
Value Ducts (outside conditioned space)
U
Factor Fenestration
SHGC
Fenestration
Gas
Fired Un-Vented Room Heater
Baseboard
Electric Heater
Electric
Furnace
U
Factor Skylight / SHGC
AFUE
Value Boiler / Furnace
Efficiency
and type of heating equipment
Efficiency
and type of cooling equipment
Efficiency
and type of service water heater
Contractor
or Design Professional
Address
Registration
Signature
Delete
and substitute Table R402.1.1
TABLE
R402.1.1
INSULATION
AND FENESTRATION REQUIREMENTS BY COMPONENT a
CLIMATE
ZONE
FENESTRATION
U-FACTOR
b
SKYLIGHT
b
U-FACTOR
GLAZED
FERNESTRATION SHGC b
CEILING
R-VALUE
i
WOOD
FRAME WALL R-VALUE g
MASS
WALL
R-VALUE
FLOOR
R-VALUE
BASEMENT
C
WALL
R-VALUE
SLAB
d
R-VALUE
& DEPTH
CRAWL
SPACE c WALL
R-VALUE
5
0.35
0.60
NR
38
20
or
13+5
f
13/17
30
e
10/13
R-10
for
2 ft.
10/13
For SI: 1 foot = 304.8 mm.
a. R-values are minimums
U-factors and SHGC are maximums. R-19 batts compressed into a nominal
2 × 6 framing cavity such that the R- value is reduced by R-1
or more shall be marked with the compressed batt R-value in addition
to the full thickness R-value.
b. The fenestration U-factor
column excludes skylights. The SHGC column applies to all glazed
fenestration.
c. “10/13” means
R-10 continuous insulated sheathing on the interior or exterior of
the home or R-13 cavity insulation at the interior of the basement
wall.
d. R-5 shall be added to the
entire slab and the required slab edge R-values for heated slabs
e. Or insulation sufficient to
fill the framing cavity, R-19 minimum.
f. “13+5” means
R-13 cavity insulation plus R-5 insulated sheathing. If structural
sheathing covers 25 percent or less of the exterior, insulating
sheathing is not required where structural sheathing is used. If
structural sheathing covers more than 25 percent of exterior,
structural sheathing shall be supplemented with insulated sheathing
of at least R-2.
g. The second R-value applies
when more than half the insulation is on the interior of the mass
wall.
TABLE
R402.1.3 EQUIVALENT U-FACTORS, a
CLIMATE
ZONE
FENESTRATION
U-FACTOR
SKYLIGHT
U-FACTOR
CEILING
U-FACTOR
FRAME
WALL U-FACTOR
MASS
WALL U-FACTORb
FLOOR
U-FACTOR
BASEMENT
WALL U-FACTOR
CRAWL
SPACE WALL U-FACTOR
5
0.32
0.55
0.026
0.057
0.082
0.033
0.050
0.055
R402.1.4
Total UA alternative Delete and substitute
R402.1.4 Total UA
alternative. If the total building thermal envelope UA (sum of
U-factor times assembly area) is less than or equal to the total UA
resulting from using the U-factors in Table R402.1.3 (multiplied by
the same assembly area as in the proposed building), the building
shall be considered in compliance with Table R402.1.1. The UA
calculation shall include the thermal bridge effects of framing
materials. The UA calculation shall include the thermal bridging
effects of framing materials. The SHGC requirements shall be met in
addition to UA compliance
R402.4.1.2 Delete and
substitute the following
R402.4.1.2 Testing. The
building or dwelling unit shall be tested and the air leakage rate
shall be verified. Testing shall be conducted with a blower door at
a pressure of 0.2 inches (50 Pascals). Testing shall be conducted by
an approved third party, where required by the building official. A
written report of the results of the test shall be signed by the
party conducting the test and provided to the building official.
Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors,
fireplace and stove doors shall be closed, but not sealed, beyond the
intended weather-stripping or other infiltration control measures;
2. Dampers including exhaust,
intake, makeup air, backdraft and flue dampers shall be closed, but
not sealed beyond intended infiltration control measures;
3. Interior doors, if
installed at the time of the test, shall be open.
4. Exterior doors for
continuous ventilation systems and heat recovery ventilators shall be
closed and sealed;
5. Heating and cooling
systems, if installed at the time of the test, shall be turned off;
and
6. Supply and return
registers, if installed at the time of the test, shall be fully open.
R403.2.2 Sealing (Mandatory)
Delete From sections 403.2.2
1) Post construction test
2) Rough-in test
Substitute the following:
1. Post construction test:
Total leakage shall be less than or equal to 8 cfm (113.3 L/min) per
100 square feet (9.29 m 2 ) of conditioned floor area when
tested at a pressure differential of 0.1 inches w.g.(25 Pa) across
the entire system, including the manufacturer’s air handler
enclosure. All register boots shall be taped or otherwise sealed
during the test.
2. Rough-in test: Total
leakage shall be less than or equal to 6 cfm (113.3 L/min) per 100
square feet (9.29 m 2 ) of conditioned floor area when
tested at a pressure differential of 0.1 inches w.g. (25 Pa) across
the system, including the manufacturer air handler enclosure. All
registers shall be taped or otherwise sealed during the test. If the
air handler is not installed at the time of the test, total leakage
shall be less than or equal to 4 cfm (85 L/min) per 100 square feet
(9.29 m 2 ) of conditioned floor area.
Delete R403.2.3 and substitute
the following:
R403.2.3 Building cavities
(Mandatory). Interior building framing cavities shall be permitted to
be used as return ducts or plenums. (BP)
8.10 Chapter 5[RE]
Reference Standards
Delete without substitute
ASHRAE – 2009 ASHRAE
Handbook of Fundamentals.