Chapter 74:29:11 โ In situ leach mining
61 sections
61 sections
- ARSD 74:29:11:01ARSD 74:29:11:01. Application for in situ leach mine permit -- Contents
- ARSD 74:29:11:01.01ARSD 74:29:11:01.01. Underground injection control -- Class III Well permit required for mine permit
- ARSD 74:29:11:02ARSD 74:29:11:02. Application content requirements -- Additional baseline information required
- ARSD 74:29:11:03ARSD 74:29:11:03. Application content requirements -- Mine operations plan
- ARSD 74:29:11:04ARSD 74:29:11:04. Application content requirements -- Reclamation plan
- ARSD 74:29:11:05ARSD 74:29:11:05. Determination of ground water restoration demonstration
- ARSD 74:29:11:06ARSD 74:29:11:06. Ground water restoration table
- ARSD 74:29:11:07ARSD 74:29:11:07. Establishment of baseline water quality in new mining areas
- ARSD 74:29:11:08ARSD 74:29:11:08. Technical revisions to an in situ leach mine permit
- ARSD 74:29:11:09ARSD 74:29:11:09. Designation of exempted aquifers
- ARSD 74:29:11:10ARSD 74:29:11:10. Injection wells subject to the provisions of this chapter
- ARSD 74:29:11:11ARSD 74:29:11:11. Well location and protection
- ARSD 74:29:11:12ARSD 74:29:11:12. Well construction requirements
- ARSD 74:29:11:13ARSD 74:29:11:13. Well construction requirements -- Injection wells
- ARSD 74:29:11:14ARSD 74:29:11:14. Minimum requirements for monitor wells
- ARSD 74:29:11:15ARSD 74:29:11:15. Disposal of drill cuttings
- ARSD 74:29:11:16ARSD 74:29:11:16. Mechanical integrity testing of injection wells
- ARSD 74:29:11:17ARSD 74:29:11:17. Supervision of well construction and testing
- ARSD 74:29:11:18ARSD 74:29:11:18. Requirements for plugging drill holes and repair, conversion, and plugging wells
- ARSD 74:29:11:19ARSD 74:29:11:19. Corrective actions for improperly sealed wells
- ARSD 74:29:11:20ARSD 74:29:11:20. Authorizing new injection wells within permit area boundary
- ARSD 74:29:11:21ARSD 74:29:11:21. Design and construction of in situ leach mine surface facilities
- ARSD 74:29:11:22ARSD 74:29:11:22. Construction quality assurance plan
- ARSD 74:29:11:23ARSD 74:29:11:23. Pond and surface impoundment design and construction requirements
- ARSD 74:29:11:24ARSD 74:29:11:24. Pipeline design and construction requirements
- ARSD 74:29:11:25ARSD 74:29:11:25. Recovery plant and satellite facility design and construction requirements
- ARSD 74:29:11:26ARSD 74:29:11:26. Uranium byproduct material handling and disposal systems
- ARSD 74:29:11:27ARSD 74:29:11:27. Disposal of liquid waste
- ARSD 74:29:11:28ARSD 74:29:11:28. Disposal of nonradioactive solid waste
- ARSD 74:29:11:29ARSD 74:29:11:29. Prohibitions -- Injection volumes and pressure
- ARSD 74:29:11:30ARSD 74:29:11:30. Production area operational monitoring requirements
- ARSD 74:29:11:31ARSD 74:29:11:31. Production area monitor well location and spacing requirements
- ARSD 74:29:11:32ARSD 74:29:11:32. Nonproduction zone monitoring
- ARSD 74:29:11:33ARSD 74:29:11:33. Subsidence monitoring
- ARSD 74:29:11:34ARSD 74:29:11:34. Confinement of recovery fluid
- ARSD 74:29:11:35ARSD 74:29:11:35. Reporting excursions
- ARSD 74:29:11:36ARSD 74:29:11:36. Verifying analysis
- ARSD 74:29:11:37ARSD 74:29:11:37. Excursion sampling frequency
- ARSD 74:29:11:38ARSD 74:29:11:38. Remedial action for excursion
- ARSD 74:29:11:39ARSD 74:29:11:39. Excursions -- Controlled
- ARSD 74:29:11:40ARSD 74:29:11:40. Excursions -- Not controlled
- ARSD 74:29:11:41ARSD 74:29:11:41. Criteria for determination of adequacy of remedial action plan
- ARSD 74:29:11:42ARSD 74:29:11:42. Reporting requirements
- ARSD 74:29:11:43ARSD 74:29:11:43. Well construction records
- ARSD 74:29:11:44ARSD 74:29:11:44. Well plugging records
- ARSD 74:29:11:45ARSD 74:29:11:45. Maintenance and retention of records
- ARSD 74:29:11:46ARSD 74:29:11:46. Ground water restoration requirements
- ARSD 74:29:11:47ARSD 74:29:11:47. Restoration sampling procedure
- ARSD 74:29:11:48ARSD 74:29:11:48. Restoration progress reports
- ARSD 74:29:11:49ARSD 74:29:11:49. Final restoration -- Restoration values achieved
- ARSD 74:29:11:50ARSD 74:29:11:50. Restoration values not achieved
- ARSD 74:29:11:51ARSD 74:29:11:51. Closure of mine site following restoration
- ARSD 74:29:11:52ARSD 74:29:11:52. Reclamation of in situ leach mine surface facilities
- ARSD 74:29:11:53ARSD 74:29:11:53. Radiation survey of surface facilities at mine closure
- ARSD 74:29:11:54ARSD 74:29:11:54. Radiation standards for closure of surface facilities
- ARSD 74:29:11:55ARSD 74:29:11:55. Postclosure plan -- Estimated costs for postclosure care
- ARSD 74:29:11:56ARSD 74:29:11:56. General postclosure inspection and maintenance activities
- ARSD 74:29:11:57ARSD 74:29:11:57. Postclosure operation of monitoring systems
- ARSD 74:29:11:58ARSD 74:29:11:58. Ground water contamination during the postclosure period
- ARSD 74:29:11:59ARSD 74:29:11:59. End of the postclosure period
- ARSD 74:29:11:60ARSD 74:29:11:60. Public notice for in situ leach mines