R307-209-4

R307-209-4. Notice of Temporary Relocation

Last amended: 2025Length: 229 wordsOfficial source

Cite as Utah Admin. Code R307-209-4

(1) An owner or operator of a portable aggregate processing plant shall submit a Notice of Temporary Relocation to the director and obtain a Temporary Relocation Approval Letter before operating a portable source at any location. (2) A Notice of Temporary Relocation shall include the following: (a) the address and driving directions of the proposed location; (b) a list of the equipment to be operated at the proposed location, including the: (i) type of equipment; (ii) rated capacity of the equipment; and (iii) date of manufacture of the equipment; (c) a site diagram showing the general equipment location on site to scale; and (d) the distance to the nearest houses, barns, or commercial operations to scale if the plant boundary is located within one mile of these buildings; (e) the expected startup and completion dates for operating at the proposed location; (f) the expected hours of operation, including start and stop times; (g) the emission control measures that the owner or operator proposes to adopt for each emission point at each location, including a fugitive dust control plan specific to the proposed location; and (h) if relocating an asphalt plant, either: (i) the results and the date of the most recent stack test for the asphalt plant; or (ii) the anticipated stack test date and the stack test protocol for an asphalt plant that has not been stack tested.
R307-209-4: R307-209-4. Notice of Temporary Relocation | Justis AI