Washington · Regulations
Chapter 480-75 — HAZARDOUS LIQUID PIPELINES — SAFETY
39 sections
39 sections
- WAC 480-75-100WAC 480-75-100. Definitions
- WAC 480-75-200WAC 480-75-200. Application of rules—Responsibility for contractors
- WAC 480-75-210WAC 480-75-210. Additional requirements
- WAC 480-75-220WAC 480-75-220. Severability
- WAC 480-75-240WAC 480-75-240. Annual pipeline safety fee methodology
- WAC 480-75-250WAC 480-75-250. Civil penalty for violation of chapter 81.88 RCW
- WAC 480-75-260WAC 480-75-260. Exemption for rules in chapter 480-75 WAC
- WAC 480-75-270WAC 480-75-270. Damage prevention
- WAC 480-75-300WAC 480-75-300. Leak detection
- WAC 480-75-310WAC 480-75-310. Geological considerations
- WAC 480-75-320WAC 480-75-320. Overpressure protection
- WAC 480-75-330WAC 480-75-330. Overfill protection
- WAC 480-75-340WAC 480-75-340. Cathodic protection test station location
- WAC 480-75-350WAC 480-75-350. Design specifications for new pipeline
- WAC 480-75-360WAC 480-75-360. Class locations
- WAC 480-75-370WAC 480-75-370. Design factor ( F ) for steel pipe
- WAC 480-75-380WAC 480-75-380. Location of pump stations and breakout tanks for pipelines
- WAC 480-75-390WAC 480-75-390. Valve spacing and rapid shutdown
- WAC 480-75-400WAC 480-75-400. Backfill and bed requirements
- WAC 480-75-410WAC 480-75-410. Coatings
- WAC 480-75-420WAC 480-75-420. Hydrostatic test requirements
- WAC 480-75-430WAC 480-75-430. Welding procedures
- WAC 480-75-440WAC 480-75-440. Pipeline repairs
- WAC 480-75-450WAC 480-75-450. Construction specifications
- WAC 480-75-460WAC 480-75-460. Welding inspection requirements
- WAC 480-75-500WAC 480-75-500. Moving and lowering hazardous liquid pipelines
- WAC 480-75-510WAC 480-75-510. Remedial action for corrosion deficiencies
- WAC 480-75-520WAC 480-75-520. Inspections during excavation
- WAC 480-75-530WAC 480-75-530. Right of way inspections
- WAC 480-75-540WAC 480-75-540. Pipeline markers and above ground facilities
- WAC 480-75-550WAC 480-75-550. Change in class location
- WAC 480-75-600WAC 480-75-600. Maps, drawings, and records of hazardous liquid facilities
- WAC 480-75-610WAC 480-75-610. Reporting requirements for proposed construction
- WAC 480-75-620WAC 480-75-620. Pressure testing reporting requirements
- WAC 480-75-630WAC 480-75-630. Incident reporting
- WAC 480-75-640WAC 480-75-640. Depth-of-cover survey
- WAC 480-75-650WAC 480-75-650. Annual reports
- WAC 480-75-660WAC 480-75-660. Procedural manual for operations, maintenance, and emergencies
- WAC 480-75-999WAC 480-75-999. Adoption by reference