Oregon ยท Regulations
Division 84 โ SOLAR PHOTOVOLTAIC PROGRAMS
38 sections
38 sections
- OAR 860-084-0000OAR 860-084-0000. Scope and Applicability of Solar Photovoltaic Programs
- OAR 860-084-0010OAR 860-084-0010. Definitions for Solar Photovoltaic Pilot Programs
- OAR 860-084-0070OAR 860-084-0070. Renewable Energy Certificates and Compliance with the Renewable Portfolio Standards
- OAR 860-084-0100OAR 860-084-0100. Solar Photovoltaic Pilot Programs
- OAR 860-084-0120OAR 860-084-0120. Systems Eligible for Enrollment in Pilot Programs
- OAR 860-084-0130OAR 860-084-0130. Ownership and Installation
- OAR 860-084-0140OAR 860-084-0140. Assignment of Payments
- OAR 860-084-0150OAR 860-084-0150. Solar Photovoltaic Pilot Capacity Limit
- OAR 860-084-0160OAR 860-084-0160. Measurement of Capacity under the Solar Photovoltaic Pilot Program
- OAR 860-084-0170OAR 860-084-0170. Distributing Solar Photovoltaic Pilot Capacity by Electric Company
- OAR 860-084-0180OAR 860-084-0180. Distributing Electric Company Capacity Limit by Allocation Period
- OAR 860-084-0190OAR 860-084-0190. Distributing Capacity by System Size
- OAR 860-084-0195OAR 860-084-0195. Mechanisms for Reserving Capacity
- OAR 860-084-0200OAR 860-084-0200. Capacity Reservation, Timing, and Volumetric Incentive Rates
- OAR 860-084-0210OAR 860-084-0210. Capacity Reservation, Timing, and Duration
- OAR 860-084-0220OAR 860-084-0220. Capacity Availability
- OAR 860-084-0230OAR 860-084-0230. Application for Capacity Reservation
- OAR 860-084-0240OAR 860-084-0240. Standard Contracts
- OAR 860-084-0250OAR 860-084-0250. Billing and Payment Requirements
- OAR 860-084-0260OAR 860-084-0260. Interconnection Requirements for Solar Photovoltaic Pilot Program
- OAR 860-084-0270OAR 860-084-0270. Authorization to Interconnect
- OAR 860-084-0280OAR 860-084-0280. Interconnection Cost Responsibility
- OAR 860-084-0300OAR 860-084-0300. Insurance
- OAR 860-084-0310OAR 860-084-0310. Level 1 System Interconnection Review
- OAR 860-084-0320OAR 860-084-0320. Level 2 System Interconnection Review
- OAR 860-084-0330OAR 860-084-0330. Level 3 System Interconnection Review
- OAR 860-084-0340OAR 860-084-0340. Installation, Operation, Maintenance, and Testing of Contracted Systems
- OAR 860-084-0350OAR 860-084-0350. Requirements after Approval of a Solar Photovoltaic Interconnection
- OAR 860-084-0360OAR 860-084-0360. Volumetric Incentive Rates and Payments โ Net Metering Option
- OAR 860-084-0365OAR 860-084-0365. Volumetric Incentive Rate Bidding Option
- OAR 860-084-0370OAR 860-084-0370. Resource Value
- OAR 860-084-0380OAR 860-084-0380. Cost Recovery and Rate Impacts
- OAR 860-084-0390OAR 860-084-0390. Cost Recovery Mechanism
- OAR 860-084-0400OAR 860-084-0400. Data Collection
- OAR 860-084-0420OAR 860-084-0420. Compliance with Pilot Program Requirements
- OAR 860-084-0430OAR 860-084-0430. Data Availability
- OAR 860-084-0440OAR 860-084-0440. Pilot Program Overhead
- OAR 860-084-0450OAR 860-084-0450. Reports to the Legislature